RADAR DEVELOPMENT AT FUNKWERK KOEPENICK

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A053000370001-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 5, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
March 9, 1960
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A053000370001-2.pdf136.92 KB
Body: 
Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246AO53000370001-2 COUNTRY East Germany REPORT - - - - - Radar Development at Furikwerk Koepenick DATE DISTR: DATE OF INFO. PLACE & DATE ACQ Radar Devel.opmort at Fur_):uerk Y:oeperlck 50X1-HUM One of the three zero-series installations is located on board the ILTEOR, which made a trial run to Leningrad in mid-Tune 1959. Another 50 installations of this type are under construction at an , e-rlin-Gberschoene- weide. department of Funkzwerk ;;oepenick is again attempting to negotiate . -. `+. hina an with VZ1F1unis 50X1-HUM installations are being built to be connected to a :soviet gyrocompass. of the ion S d the Soviet t C ' KSA 4 Repair work of the model installation which had already been sold was ,pother tq ting of the installation to be completed by mid-,sane 1959-,,t was scheduled to follow at Funkwork -oepenick. 3. :SSA During 15 and 30 June 1959, the model installation was in Stralsund for weather testing. On this occasion, only minor defects appeared. "Trt"gal "flu ust 1959; `dBdeZtipMdnt'- Cage ?ieK 8f ran 'reached. l.t has not been decided what type of picture tube is to be used for the construction of further inetallations.The prototype.. installation has a Valvo tube (Al 22 - 10). Fur :werh ::oeneniek proppsed tho development of a tube with electrical specifications corresponding to those of the. Valvo tube. X * aav rr.w.y ~a... X AAM I #A P4H+ x NSA 9 MAR 196' Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246AO53000370001-2 Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246A053000370001-2 Magnetrons The telecomatumleation plant (work fuer Fernmeldewesen WF) in Berlin- Oberechoeneweidt is to develop a magnetron for the installation KSA 6 and FBR l which is olailar to the 2-J-55 Valve tube. 50X1-HUM Personnel Matters t ECM Depart_ men of 30 S ctor y,r.Behwn ; XQ,eWn On 31 May 1959, departmen ,chief Fleischer retired. Dipl. Phys. (braduate physicist) PED member, not active, became his successor. About two or- roe years ago, he finished i1 studies and went to Funkwerk Kenick, at first to the LC sector. W ('lashacen became successor of laboratp y chief i,aeser, ,-;ho was relieved of his..post. > -J Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246AO53000370001-2 Under type designation B 23 0 3, Funkwerk Erfurt meanwhile supplied several comparable sample tubes.. The tubes are statically focused. The chemical aWmposition_ of the one'-component screen (Einkomponenten- schirm) was developed in a laboratory that is not. subordinate to RFT (Rundfunk- and Fernsehtechni.k). 4. KSA 6 The KSA.-6 to a 3,ation is the ? prototype of True 'i4otion installations. Development stage K 4 is to be achieved in late 1959? Series production will 'not be started until late 1960.. Later on, it is to replace the KSAA3 installation. In addition to the KSA 6, the KSA 5 is to operate as a small-size installation. The device is at present under development. Starting early July 1959, designs for the construction of a model installation will be transmitted to the workshop. 6. Traffic Radar For testing and operational problems, some installations are built on laboratory scale. In the future, only a small number of installations will be built. It remains a research problem. 7? 8. Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246AO53000370001-2 Next 2 Page(s) In Document Denied Iq Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246AO53000370001-2