RADAR DEVELOPMENT AT FUNKWERK KOEPENICK
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80T00246A053000370001-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
August 5, 2010
Sequence Number:
1
Case Number:
Publication Date:
March 9, 1960
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 136.92 KB |
Body:
Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246AO53000370001-2
COUNTRY East Germany
REPORT
- - - - - Radar Development at Furikwerk Koepenick DATE DISTR:
DATE OF
INFO.
PLACE &
DATE ACQ
Radar Devel.opmort at Fur_):uerk Y:oeperlck
50X1-HUM
One of the three zero-series installations is located on board
the ILTEOR, which made a trial run to Leningrad in mid-Tune 1959.
Another 50 installations
of this type are under construction at an , e-rlin-Gberschoene-
weide.
department of Funkzwerk ;;oepenick is again attempting to negotiate
.
-.
`+.
hina an
with VZ1F1unis
50X1-HUM
installations are being built to be connected to a :soviet
gyrocompass.
of the
ion
S
d the Soviet
t C
' KSA 4
Repair work of the model installation which had already been sold was
,pother tq ting of the installation
to be completed by mid-,sane 1959-,,t
was scheduled to follow at Funkwork -oepenick.
3. :SSA
During 15 and 30 June 1959, the model installation was in Stralsund
for weather testing. On this occasion, only minor defects appeared.
"Trt"gal "flu ust 1959; `dBdeZtipMdnt'- Cage ?ieK 8f ran 'reached.
l.t has not been decided what type of picture
tube is to be used for the construction of further inetallations.The
prototype.. installation has a Valvo tube (Al 22 - 10). Fur :werh
::oeneniek proppsed tho development of a tube with electrical
specifications corresponding to those of the. Valvo tube.
X * aav rr.w.y
~a...
X AAM I #A
P4H+ x NSA
9 MAR 196'
Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246AO53000370001-2
Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246A053000370001-2
Magnetrons
The telecomatumleation plant (work fuer Fernmeldewesen WF) in Berlin-
Oberechoeneweidt is to develop a magnetron for the installation KSA 6
and FBR l which is olailar to the 2-J-55 Valve tube. 50X1-HUM
Personnel Matters
t
ECM Depart_ men of 30 S ctor y,r.Behwn ; XQ,eWn
On 31 May 1959, departmen ,chief Fleischer retired. Dipl. Phys.
(braduate physicist) PED member, not active, became his
successor. About two or- roe years ago, he finished i1 studies
and went to Funkwerk Kenick, at first to the LC sector.
W
('lashacen became successor of laboratp y chief i,aeser, ,-;ho was
relieved of his..post. > -J
Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246AO53000370001-2
Under type designation B 23 0 3, Funkwerk Erfurt meanwhile supplied
several comparable sample tubes.. The tubes are statically focused. The
chemical aWmposition_ of the one'-component screen (Einkomponenten-
schirm) was developed in a laboratory that is not. subordinate to RFT
(Rundfunk- and Fernsehtechni.k).
4. KSA 6
The KSA.-6 to a 3,ation is the ? prototype of True 'i4otion installations.
Development stage K 4 is to be achieved in late 1959? Series
production will 'not be started until late 1960.. Later on, it is to
replace the KSAA3 installation. In addition to the KSA 6, the KSA 5
is to operate as a small-size installation.
The device is at present under development. Starting early July 1959,
designs for the construction of a model installation will be
transmitted to the workshop.
6. Traffic Radar
For testing and operational problems, some installations are built on
laboratory scale. In the future, only a small number of
installations will be built. It remains a research problem.
7?
8.
Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246AO53000370001-2
Next 2 Page(s) In Document Denied
Iq
Sanitized Copy Approved for Release 2010/08/05: CIA-RDP80T00246AO53000370001-2