SUMMARY SOVIET BLOC TRANSPORTATION REPORT FOR SEPTEMBER 1962

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A065400430001-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
9
Document Creation Date: 
December 23, 2016
Document Release Date: 
July 15, 2013
Sequence Number: 
1
Case Number: 
Publication Date: 
November 8, 1962
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A065400430001-8.pdf265.31 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/07/16: CIA-RDP80T00246A065400430001-8 ? *CENTRAL INTELLIGENCE AGENCY owi.4 This material contains Information Sting the National -Defense of the United States within the meaning of the &pie U.S.C. &ma 710 and WPC the transmission or revelation of which in any manner to an unauthorized person is p CONFIDENTIAL NO FOREIGN DISSEM 50X1-HUM COUNTRY Soviet Bloc SUBJECT DATE OF INFO. PLACE & DATE ACQ. Summary Soviet Bloc Transportation Report for September 1962 REPORT DATE DISTR. sag/ NO. PAGES REFERENCES FIELD REPORT NO. 50X1-HUM 50X1-HUM 50X1-HUM THIS IS UNEVALUATED INFORMATION. SOURCE GRADINGS ARE DEFINITIVE. APPRAISAL OF CONTENT IS TENTATIVE. the summary Soviet Bloc transportation report for September 1962 Information is given on international traffic relations and transpor- tation in the USSR. Czechoslovakia and Poland. \ 7 Distribution of Attachment: ORB: .esia Army Air ctig`i : -Retention Copy #2 : Retention Copy #3 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 5 14.3 2 1 CONFIDENTIAL NO FOREIGN DISSEM 50X1-HUM STATE ARMY #X NAVY X Allt NSA I#x I DIA lxi _X (Note: Washington distribution Indicated by "X": Flad distribution by "*".) 50X1-HUM? INFORMATION REPORT INFORMATION REPORT 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2013/07/16: CIA-RDP80T00246A065400430001-8 _ Declassified in Part - Sanitized Copy Approved for Release 2013/07/16 : CIA-RDP80T00246A065400430001-8 ? Vdeg Frt" a a., z u u ?-c. . NO FORET.GN DIESSIDTATIOK 50X1-HUM ' ? Trangiortation(Sumnari for September 'l262 1, International Traffic' Relations Fifty students of Dresden .Trade School for Trmnspor ation on "exchance procram" at Polish State Railroads?. Apart fro b permanent representation of Polish Railroads ? in 1(03colds. nuch representations also 2vailable-in-i4ast Berlin and Vv.:cue,' ? Warsaw - Presto RR line to be operated 'electrically from mid-1964 ono' II 0 USSR Traffic performances durinG.first nix months of, 1962. Norm for tonnaGe of trains on. individual 1dt stretches4` Planned construction of Abakan-;Slpdyanka (Lake Baykal). RR. line with branch line to Kyzyl (Tuve. Ropublic)0. / Train operations on Carpathian stretch of Lwow-Chop line; completion of electrification of total line impendinG. 1 RR stretchem under construction and scheduled to be operated with alternate current. HI. Czechoslovakia Workers of Czechoslovakian ?State Railroads delected for "developinc countries"44.,. Truchinc of coal shipments because of eontiniancishortaGe of rollinG stock. .4 Polish and Rumanian freiGht cars returned from.CsechOsiovakia. A total of 40 condole cars of German.fedoral: Railroads made available to Czechoslovakian State railroads daily. Podolinoc - Orlov-Plavec line to he completed aheeil-of, schodulc, hy late 19640 , , Repair of electric locomotives in arrsa-. because of chortaGe of technicians. ' NO FOREXGN DISSEMI; aTION ,50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2013/07/16 : CIA-RDP80T00246A065400430001-8 Declassified in Part - Sanitized Copy Approved for Release 2013/07/16: CIA-RDP30T00246A065400430001-8 ? ? ITO FOREIGN DISSEITTNATION 0 Six-axle dump cars for tipping toward . either side preduced by Tatra car plant in Studenka for USSR. ? ? . IV 0 Poland, ? Rolling :stock continuously in short supply. Laband?aeydebreck RR. stretch openeC to electric traffics becinning 2.0 July 1962. - Special depressed center .flat cars completed for shipping transformers frot.: USSR. S-E-C-R-E-T NO FOREIGN DISSETaNATION Declassified in Part - Sanitized Copy Approved for Release 2013/07/16: CIA-RDP80T00246A065400430001-8 Declassified in Part - Sanitized Copy Approved for Release 2013/07/16: CIA-RDP80T00246A065400430001-8 NO FOREIGN DISSEIIIITATIOU I. International Traffic Relations 1. ExChance of ',;a.st Garman and Polish Students Within the framework of an "exchana procran".v fifty students of the Dresden Trade School for TransPertation were trained at the'operating installations of the Polish State Railroads (PKP) between 16 July and 12 Aucust 1962, in particular on modern train stomdnc and telecoamnication devices and automation, 2. Reresentations of the PKP and the State Notor Trans2prt CE3Y-Tai Pra;:ue and East Berlin In addition to the Termancnt reDreselAations of the PKP end the PM3 established ,in Noucow in June 1962, such re)resentations have aliecedly also been established in East Berlin and Th.:e.ne. 50X1-HUM 3, Electric Operations to De;in on,'Zarsaw - Pratte Line in 1964 ? ? In accordance with the aGreeLent reacee between Czechoslovakia and.Polandv wor:.: on thc Ketovico- Olmuoti (Olomouc) stretch is to be accelertee to the effect t::at tic total - Procne will be , opened to electric traffic in mid-19'61;. II. USSR Railroad Trans-)ortation 1.. Operational Data Six lionthe of 1962 a, Treffic,Performances in First '(1) Preicict traffic inclucAnc electric and opa billion t/km Diesel traction 490 billion 'Om (2) Freic:ht volume . . 1v020 billion tons (3) Converted to electric operation in 1962 275 kilo=ters (4) Converted to Diesel operation 672 kn. :o tors NO FOREIGN DISSMINATION Declassified in Part - Sanitized Copy Approved for Release 2013/07/16: CIA-RDP80T00246A065400430001-8 Declassified in Part - Sanitized Copy Approved for Release 2013/07/16: CIA-RDP80T00246A065400430001-8 NO FOREIGN DISSEMINATION - 4 (5) Total electrified RR.net 16,023 kilometers (as of 1 July 1962) (6) Total dineelized RR net 51,055 kiloteters (as of 1 July 1962) (7) Electric locomotives supplied (includinG licht locomotives) 299 units .(3) New lines completed 507.6 kildmeters (9) Second tracks laid 104.6 kilometers .(10) Equipped with dispatcher towers (11), Equipped with automatic block installations 245 kilemoters 111 kilometers b. Norm for Tonnace of Trains on Individual Lines Tho standard weiht of a frei:.ht train is as follows' on followinc; RR stretches: the (1) Cherepovec'- Volkhovetro (on the VoloGda - Lenincrad line) 4,f?,3o tone (2) Volhhovstro - 1;armansk (flurmansk Line) 5,260 tons (5) Lonincrad - Uovosoholniki: (LeninGrad - ) Oraha line) Irkutsk - Slyudyanka (Transsiberian 3,000 ?one, (5) Majlotralc) Moscow - Smolensk, 5,000 tone,, .1000 tons (6) Smolensk - Brest Litovsk 2,0CM tons 2. Railroad Net To relieve the .Transsiberian Macistrale, a. 1,100 kilometer RR line will be built from Abakan (South ',Abel-tan Macistrale) to Slyudyanka (on Lake Baikal). Simultaneously, a branch line will be built fro:.. this line southward to Kyzyl, the capital of the Tuve Republic. Kyzyl is the center' of rich bituminous coal, iron ore, nonferrous motel and ' asbestos mines. S-E-C-R-E.T NO FOREIGN DISSEEINATION Declassified in Part - Sanitized Copy Approved for Release 2013/07/16: CIA-RDP80T00246A065400430001-8 ? ? Declassified in Part - Sanitized Copy Approved for Release 2013/07/16 : CIA-RDP80T00246A065400430001-8 NO FOREIGN DISSEMINATION 5 - FreiGht trains running on the electrified Hihachevo Lavochne (Carpathian lits) stretch have been hauled by two electric locomotives since the introduction of the sunner titetable (27 May)* The electrification of the Huhachevo Chou and the Lw6w Stryl stretches will be co2p1eted within the next few . weeks* After the conversion of the 300 hiloneter,Luhw. Chop lino it is intended to introduce a standard weicht of 5,600 tons for all freiGht trains from theJ)dnets Basin; heavy rails of type R.65 will therefore be laid on the total line* Electrification The-followinG RR stretches under construction are to be operated with sir:en-phase alternatina current: (1) Bryansk Maloyareslavets (Bryansk - Moscow line) (2) Ryazan - Michurinsh (NoScow - Maki line) (3) Rostov - LihhayaResosh (Rostov - Voronezh line) (4) Kavkatshaya - Minoralinye Vody (Rostov-- Baku line) (5) Syzran Povorino a Kupyansk (Kuibyshev Penza Lishi direction to Kharkov) ? (6) Abakan - Taybhet (South Siberian MaGibtrale) ? (7) Vladivostok \Tsurish (Eastern end stretch of the Transsiberian HaGistrale). III* Czechoslovakia Railroads . I. Personnel At the Cechoolovahian :';tate Railroads (CID), particularly in the operational services, workers are to be listed at present , for future employLent in "developing countries". The fact that the RR adnini:.trations are very reluctant'in this matter confirms the:reported continuous dhortaGe of personnel in their administration areas* The tiauber of railrondben lirAted is apparently not very larGe* S-E-C-R-E-T NO FOREIGN DISSEHETATION ? Declassified in Part - Sanitized Copy Approved for Release 2013/07/16: CIA-RDP80T00246A065400430001-8 ' Declassified in Part - Sanitized Copy Approved for Release 2013/07/16 : CIA-RDP80T00246A065400430001-8 _ _ _ _ NO FOREIGI1 DI25EITINATION 1 2. Operational Situation I a. As a result of tie difficulties in nakinG RR cars avail- able, the cities of Pilsen (Plzen) and.Klattau (Klatovy) will haul the enuivalont cif 1,500 cars of coal by motor vehicleo of Statc'Hotdr Transport (CSAD) from the Falkonau (Chr66einc)t lignite mines over an average distance of 90 kilometers, : This kind of coal haulage will be introduced in all 'jest I Bohemia, because the shortage of RR cars has furthe:50x1 -HUM otevicmIted in Aut:ust. 11 . b.: As in the procedinG year, the Polish State Railroads and the Rumanian Railroads (GF1Whave asked for a speedy return, of their freight cars employed in - 50X1-HUM Czechoslovrkin simultaneously increasing the hire chres Ap in the preceding year, the German Federal Railroads make available 40. Gondola cars daily to Czechoslovakia on request by the CSD. 3. Track Construction The standard-rauge line under construction between 50X1-HUM Podolinec and Orley-Piave? (DV 9060) will be complett;d by late 1964* i.e.* a' year 'ahead of schedule. 4. Rolling Stock a. As a result of the shortage of technicians and. of replacement parts for the maintenance and repair of electric locomotives, there are considerable arrears in the repair of locc:::otivest, b. The Tatra car plat in Studenka is producing six-axle dump cars for tip-ling toward either side.. The. cars are being built in conformity with Soln.ot designs. They have a load capacity of 96 tons; their permissible speed in 100 km/h. $-E-C-R-E-T NO FOREIGN DISSENT-NATION Declassified in Part.- Sanitized Copy Approved for Release 2013/07/16: CIA-RDP80T00246A065400430001-8 Declassified in Part - Sanitized Copy Approved for Release 2013/07/16 CIA-RDP80T00246A065400430001-8 NO FOREIGN DIEiSEIIINATION IV. Poland Railroads 1, 0,,orations The increasing difficulties in making froight cars available exc.:characteristic of the seasondAs in-the , preceding year, theTKP asked for the quickeSt? possible return of their freight cars employed in Czechoslovakia, There is also a considerable shortage of passenger cars, because renairworh has been. in arrears for a- long ' time. . . . 2. Electrification ; a.- The 32 kilometer LabandiNorIobrock stretch; having boon completed fairly on sehedule,.was nut into, ' regular operation on 20 July 1962. Thus; a aceond ? :electrified connection has boon established. between Gleiwitz (Gliwice) and Oppoln (Opole). Present traffic with. electric locomotivee is limite& to, freight trains,. while passenger traffic with electric locomotives is to begin with the - introduction of the winter timetable (October 1962)0 b. The 79 kilometer. Kutno. Konin and the 55 ? kilometer Podloce - Tarnow stretches, scheduled to be completed in 1962, are expected to be nut into operation in the late fell. 50X1 -HUM 3. Rollins Stock. The construction of two-unit special depressed banter flat cars of type 606-Z,?desicaed in Posen (Poznah)? in the spring of 1962, was completed at the NCNSTAL Steel Constructions Factory in Chorzow; in August 1962. ? The four four.-.eXle swivel trucks of the car Were Supplied by ZNTIC in Oppeln. Theicar has an empty weight of 93 tonb and allows for speed of. 80 km/h, It is. changeable to broad-gauge axles and is. to transport transforters.of up or: the ? 50X1 -H UM USSR to Tuorchau (Turoqzow) NO FOREIGN DISSEEINATION Declassified in Part - Sanitized Copy Approved for Release 2013/07/16 : CIA-RDP80T00246A065400430001-8 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2013/07/16: CIA-RDP80T00246A065400430001-8 le# 40 Next 9 Page(s) In Document Denied e Declassified in Part - Sanitized Copy Approved for Release 2013/07/16: CIA-RDP80T00246A065400430001-8