KUYBYSHEV EXPERIMENTAL AIRCRAFT AND ROCKET ENGINE PLANT KRASNAYA GLINKA 2, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00556A000100440001-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
7
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 27, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
December 1, 1979
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00556A000100440001-7.pdf447.85 KB
Body: 
Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80T00556A000100440001-7 basic imagery interpretation report Kuybyshev Experimental Aircraft and Rocket Engine Plant Krasnaya Glinka 2, USSR (TSR) Strategic Weapons Industrial Facilities USSR Top Secret op Secret 25X1 25X1 RCA-09/0029i7q DECEMBER? 5Xa Copy 4 9 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Top Secret RUFF Kuybyshev Experim UTM COORDINATES NA ental Aircraft and Rocket Engine Plant Krasnaya Glinka 2 1 UR GEOGRAPHIC COORDINATES 53-20-53N 050-12-31E CATEGORY BE NO. COMIREX NO. DMAC. USATC, Series 200, Sheet 0165-17, scale 1:200,000 ABSTRACT TSR) This report updates three previous NPIC reports, 25X1 25X1 on Kuybyshev Experimental Aircraft and Rocket Engine Plant Krasnaya Glinka 2, USSR, and satisfies the basic reporting requirement for this target. Activity observed at the plant since =the information cutoff date for the most recent report, is discussed in this report. resulted in a net increase of 10,972 square meters of floorspace. The plant was enlarged by 6.5 25X1 25X1 25X1 25X1 LOA-1 ~SR) Construction activity at the plant during the reporting period, 25X1 hectares. As of the date of the latest imagery used in this report, the plant contained 152,063 25X1 square meters of floorspace with an additional 1,664 square meters under construction. This report de- scribes construction and production activity at Krasnaya Glinka 2 and includes a location map, an annotated photograph, and a table of mensural data pertaining to new construction activity. Kuybyshev Experimental Aircraft and Rocket Engine Plant Krasnaya Glinka 2 FIGURE 1. LOCATION OF KUYBYSHEV EXPERIMENTAL AIRCRAFT AND ROCKET ENGINE PLANT KRASNAYA GLINKA 2, USSR Top Secret RCA-09/0028/79 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Top Secret RUFF I Construction Activity 3. (TSR) This report updates three previous NPIC reports.'-' Construction activity observed at Kuybyshev Experimental Aircraft and Rocket Engine Plant Krasnaya Glinka 2 (Figure 1) between E resulted in a net increase of approximately 7,335 square meters of floorspace (Figure 2 and Table 1). Approximately 9,636 square meters of floorspace had been added and 2,301 square meters had been razed. Significant buildings constructed during this period consisted of an administration building (item 63), a water filtration building (item 61), a vehicle storage building (item 58), and four storage buildings (items 57, 64, 67, and 68). Other construction activity consisted of the modification of an engine test building (item 43) the addition of an administration/engineering section (item 29b) to a shop building (item 29), and the enlargement of the administration/engineering building (item 30a). The older section of this building (item 30) was undergoing refurbishment by the end of 1974. A shop building (item 26) with floorspace of 2,301 square meters was razed. 4. (TSR) Modification of the engine test building (item 43) consisted of the replacement of two cylindrical exhaust stacks with two exhaust silencer/ diffuser systems (items 43a and b). Each system consists of a pair of vertical exhaust towers, a 5-meter-diameter diffuser tube, and an exhaust port. Each exhaust port added 67 square meters of usable floorspace to the building. Each exhaust tower was at the top and 25 meters in height. Similar modification has been observed at six other engine research/production facilities in the Soviet Union.' 25X1 25X1 25X1 25X1 5. (TSR) Of 5,430 square meters of floorspace added during this period at Krasnaya Glinka 2, approximately 1,826 square meters were razed, resulting in a net increase of 3,604 square meters of usable floorspace. New buildings constructed during this period consisted of a shop building (item 66), a green- house (item 59), three storage buildings (items 62, 65, and 70), and six support buildings (unnumbered; Table 1). Other construction activity consisted of the modification of two engine test buildings (items 33 and 44), the addition of three shop sections (items 24a, 28a, and 29a) to their respective buildings, and the addition of two small annexes to a storage building (item 11). Also, six storage/utility buildings (items 1, 2, 4, 13, 22, and 27)' had been razed, and refurbishment of the administration/engineering building (item 30) was complete. 6. (TSR) Two cylindrical exhaust stacks were added to an engine test building (item 33) The first stack (item 33d) is 13 meters high with a diam meters. It is connected to the engine test building by a diffuser tube and is between to the south. The second stack (item 33c) is 20 meters high with a diameter of It is connected to the engine test building by a diffuser tube and is 11 meters south of the test building. A second engine test building (item 44) was also modified during this period. The modification was similar to that of the previously discussed engine test building (item 43). However, only one exhaust tower was constructed, rather than a pair of towers. The new silencer/diffuser system (item 44a) consists of a single test building, and a exhaust tower, an exhaust port which adds 96 square meters of floorspace to the engine diameter diffuser tube. Plant Enlargement 7. (TSR) Krasnaya Glinka 2 was enlarged on three separate occasions during the reporting period, resulting in the addition of 6.5 hectares of land area. The plant was enlarged between when the partially fence-secured northern plant area was secured by a wall (Figure 2). The second time was between when a fence was constructed to secure the new water filtration building (item 61). The third time was between when a wall and fence were built to secure the new underpass which had been created when the new administra- tion building (item 63) was constructed. The fence in the west-central plant area was then replaced by a wall which was built approximately 15 meters west of the old fenceline. 8. (TSR) As of Krasnaya Glinka 2 consisted of 70 significant buildings and structures (three under construction) with a total usable floorspace of 152,063 square meters. Completion of the three buildings (items 56, 60, and 69) presently under construction will result in approximately 1,664 additional square meters of floorspace, for a total of 153,727 square meters at the plant. A second exhaust tower (item 44b) was also under construction on that date. This tower is 5 percent larger than the one constructed at the engine test building. -2- Top Secret RCA-09/0028/79 25X1 25X1 LOA] 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Top Secret RUFF I Construction Activity 3. (TSR) This report updates three previous NPIC reports.'-' Construction activity observed at Kuybyshev Experimental Aircraft and Rocket Engine Plant Krasnaya Glinka 2 (Figure 1) between E resulted in a net increase of approximately 7,335 square meters of floorspace (Figure 2 and Table 1). Approximately 9,636 square meters of floorspace had been added and 2,301 square meters had been razed. Significant buildings constructed during this period consisted of an administration building (item 63), a water filtration building (item 61), a vehicle storage building (item 58), and four storage buildings (items 57, 64, 67, and 68). Other construction activity consisted of the modification of an engine test building (item 43) the addition of an administration/engineering section (item 29b) to a shop building (item 29), and the enlargement of the administration/engineering building (item 30a). The older section of this building (item 30) was undergoing refurbishment by the end of 1974. A shop building (item 26) with floorspace of 2,301 square meters was razed. 4. (TSR) Modification of the engine test building (item 43) consisted of the replacement of two cylindrical exhaust stacks with two exhaust silencer/ diffuser systems (items 43a and b). Each system consists of a pair of vertical exhaust towers, a 5-meter-diameter diffuser tube, and an exhaust port. Each exhaust port added 67 square meters of usable floorspace to the building. Each exhaust tower was at the top and 25 meters in height. Similar modification has been observed at six other engine research/production facilities in the Soviet Union.' 25X1 25X1 25X1 25X1 5. (TSR) Of 5,430 square meters of floorspace added during this period at Krasnaya Glinka 2, approximately 1,826 square meters were razed, resulting in a net increase of 3,604 square meters of usable floorspace. New buildings constructed during this period consisted of a shop building (item 66), a green- house (item 59), three storage buildings (items 62, 65, and 70), and six support buildings (unnumbered; Table 1). Other construction activity consisted of the modification of two engine test buildings (items 33 and 44), the addition of three shop sections (items 24a, 28a, and 29a) to their respective buildings, and the addition of two small annexes to a storage building (item 11). Also, six storage/utility buildings (items 1, 2, 4, 13, 22, and 27)' had been razed, and refurbishment of the administration/engineering building (item 30) was complete. 6. (TSR) Two cylindrical exhaust stacks were added to an engine test building (item 33) The first stack (item 33d) is 13 meters high with a diam meters. It is connected to the engine test building by a diffuser tube and is between to the south. The second stack (item 33c) is 20 meters high with a diameter of It is connected to the engine test building by a diffuser tube and is 11 meters south of the test building. A second engine test building (item 44) was also modified during this period. The modification was similar to that of the previously discussed engine test building (item 43). However, only one exhaust tower was constructed, rather than a pair of towers. The new silencer/diffuser system (item 44a) consists of a single test building, and a exhaust tower, an exhaust port which adds 96 square meters of floorspace to the engine diameter diffuser tube. Plant Enlargement 7. (TSR) Krasnaya Glinka 2 was enlarged on three separate occasions during the reporting period, resulting in the addition of 6.5 hectares of land area. The plant was enlarged between when the partially fence-secured northern plant area was secured by a wall (Figure 2). The second time was between when a fence was constructed to secure the new water filtration building (item 61). The third time was between when a wall and fence were built to secure the new underpass which had been created when the new administra- tion building (item 63) was constructed. The fence in the west-central plant area was then replaced by a wall which was built approximately 15 meters west of the old fenceline. 8. (TSR) As of Krasnaya Glinka 2 consisted of 70 significant buildings and structures (three under construction) with a total usable floorspace of 152,063 square meters. Completion of the three buildings (items 56, 60, and 69) presently under construction will result in approximately 1,664 additional square meters of floorspace, for a total of 153,727 square meters at the plant. A second exhaust tower (item 44b) was also under construction on that date. This tower is 5 percent larger than the one constructed at the engine test building. -2- Top Secret RCA-09/0028/79 25X1 25X1 LOA] 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Top Secret RUFF Production Activity 9. 0 Kuybyshev Experimental Aircraft and Rocket Engine Plant Krasnaya Glinka 2 is a major Soviet aircraft engine research and development (R&D) facility. It has been identified as the location of the design bureau of N, D. Kuznetsov and as a prototype production plant for both turboprop and jet engines.' The large size of some of the engine test cells suggests that Krasnaya Glinka 2 may also be involved in the design of rocket engines,' although no photographic evidence of such activity has been obtained. Observations of aircraft engine shipping containers at the plant, the best indicator of plant activity, were rare during the reporting period. However, at least 12 NK-8 (the engine for the TU-154 CARELESS and the IL-62 CLASSIC) containers were observed on The NK-8 engine is produced at Kuybyshev Aircraft Engine Plant 24 which is 7 nautical miles south- southeast, The NK-12mv (engine for TU-95 BEAR, TU-114 CLEAT, and AN-22 COCK) and the NK-144 (engine for BACKFIRE and TU-144 CHARGER) are also produced at Plant 24.5 It is likely that Kras- naya Glinka 2 is involved in the testing/modification of these engines as well as of the NK-8. 25X1 25X1 (TSR) All applicable KEYHOLE imagery of suitable interpretability acquired from 25X1 25X1 MAPS OR CHARTS DMAC. US Air Target Chart, Series 200, Sheet 0165-17, scale 1:200,000 (UNCLASSIFIED) DOCUMENTS 1. NPIC. F I RCA-09-0008/69, Kuybyshev Experimental Aircraft Engine Plant Krasnaya Glinka 2, 25X1 Nov 68 (TO P SECRET 2 Al 2. NPIC. BCA-09-0002/70, Kuybyshev Experimental Aircraft Engine Plant Krasnaya Glinka 2, 9 Y1 25X1 3. NPIC. 1, Kuybyshev Experimental Aircraft Engine Plant Krasnaya Glinka 2, 25X1 Oct 70 2bAl 4. NPIC. PIR-009/74, Modified Exhaust Systems At Soviet A ircraft Engine Test Facilities, Feb 25X1 74 (TOP SE CRET 2 Al 5. DIA. DDB-1923-2A-78-SAO, Foreign Aircraft Production Communist World (U), Dec 78, p 9 25X1 (TOP SECR ET 2 Al COMIREX J02 Project 290046DJ (S) Comments and queries regarding this report ar Pact Forces Division, Imagery Exploitation Group, NPIC, e welcome. They may be directed to -4- Top Secret RCA-09/0028/79 25X1 25X1 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7 Top Secret Top Secret Sanitized Copy Approved for Release 2010/05/27: CIA-RDP80TOO556A000100440001-7