AIRFIELD DIEN BIEN PHU NORTH VIETNAM

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T01471R001500080005-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 13, 2007
Sequence Number: 
5
Case Number: 
Publication Date: 
February 25, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T01471R001500080005-4.pdf495.6 KB
Body: 
Approved For Release 2007/11/13: CIA-RDP80TO1471 R001 500080005-4 U U[F Qjjn_uuW U AIRFIELD DIEN BIEN PIIU, NORTH VIETNAM 2123N 10301E 25 FEBRUARY 1966 PAGES PAGE / F COPY TF71 25X1 25X1 1. SIGNIFICANCE: THIS BRIEFING BOARD DEPICTS THE RESULTS OF A RECENT AIR STRIKE AGAINST DIEN BIEN PHU AIRFIELD. 2. LOCATION: DIEN BIEN PHU AIRFIELD IS LOCATED 0.5 NM NORTH OF DIEN BIEN PHU, JUST (VEST OF THE NAM YOUN (RIVER). 3. DIMENSIONS/FACILITIES (PRE-STRIKE): THE AIRFIELD FIAD ONE SERVICEABLE 4000 X 90 FT, NNW/SSE, ASPHALT AND LATERITE RUNWAY. FACILITIES INCLUDED A WEATHER STATION, THREE BARRACKS, ONE ADMIN- ISTRATION BUILDING, TWO STORAGE BUILDINGS, AND THREE SUPPORT BUILDINGS. 4. STRIKE DATA: DIEN BIEN PHU AIRFIELD WAS FIRST ATTACKED ON 02 JULY 1965 AND BOMBED SEVERAL TIMES DURING THE BALANCE OF THE YEAR. CUMULATIVE DAMAGE AS OF CON- SISTED OF AT LEAST TWENTY-FIVE BOMB CRATERS ON THE RUN- These now have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of i t Now Excluded from automatic downgrading and declasslficatlon TOP SECRET Approved For Release 2007/11/13: CIA-RDP80TO1471 ROO15OOO8OOO5-4 Approved For Release 2007/11/13: CIA-RDP80T01471 R001500080005-4 U vu k )L~VUIIL~ l! 25 FEBRUARY 196b PAGE 25X1 25X1 RECONSTRUCTION ACTIVITY AT THE AIRFIELD, NOT PRESENT INDICATED THAT THE SOUTHERN END OF THE RUNWAY HAD BEEN EXTENDED 600 FT, AND AGGREGATE HAD BEEN SPREAD ON A 300 X 90 FT AREA OF THE RUNWAY BEGINNING 1400 FT FROM THE SSE END. AT THIS TIME A TOTAL EFFECTIVE LANDING AREA OF 2100 X 90 FT WAS AVAILABLE AT THE SOUTHERN END OF THE FIELD. STRIKE DATA REPORTS THAT DIEN BIEN PHU AIRFIELD HAS BEEN STRUCK TWICE SINCE THIS TIME -- ONCE ON 06 FEBRUARY 190b WHEN THE TARGET AREA WAS ALSO SEEDED WITH DELAYED-ACTION BOMBS -- SET TO GO OFF AFTER EIGHT TO THIRTY-SIX HOURS; AND AGAIN ON 11/12 FEBRUARY WHEN TWELVE USAF AIRCRAFT EXPENDED SIXTY 750-POUND BOMBS ON THE RUNWAY AND SUPPORT AREAS. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the ff?te f issue Approved For Release 2007/11/13: CIA-RDP80T01471 R001500080005-4 PEER Approved For Release 2007/11/13: CIA-RDP80T01471 R001500080005-4 Approved For Release 2007/11/13: CIA-RDP80T01471 R001500080005-4 Approved For Release 2007/11/13: CIA-RDP80T01471 R001500080005-4 d uU O)WnK V PAGE 6. MISSION READOUTS: REVEALS THAT DUE TO RECENT RECONSTRUCTION ACTIVITY. REVEALS THA'T' THE 06 FEBRUARY STRIKE AGAINST THE AIRFIELD RESULTED IN LITTLE ADDITIONAL DAMAGE TO THE FIELD. SEVERAL NEW BOMB CRATERS ARE OBSERVED ON AND AROUND THE RUNWAY. REVEALS THAT THE STRIKE OF 11/12 FEBRUARY HAS RESULTED IN APPROXIMATELY FORTY NEW CRATERS IN AND AROUND THE AIRFIELD, RENDERING IT UNSERVICEABLE. TIIE MAJORITY OF THE DAMAGE IS CONFINED TO THE SOUTHEAST PORTION OF THE RUNWAY WHICH HAS BEEN UNDER RECENT RECONSTRUCTION. NO AIRCRAFT ARE OBSERVED ON THE ABOVE MISSIONS. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. 25X1 25X1 lop SECT ET Approved For Release 2007/11/13: CIA-RDP80T01471 R001500080005-4 Approved For Release 2007/11/13: CIA-RDP80TO1471 R001500080005-4 DISTRIBUTION: their use shoulO oe restncreo TO me panicui or ._.. ...r~.-- .~. -..- ...-" -- --"' ----- - only for. the reporting period as indicated by the date of issue. COPV.1_ DIRECTOR, NPIC NIT CHIEF S.u/ DD . U CHIEF RAS CSD - DIA - TCO/ARMY -7 TCO/NAVY g..._ IAD 9 PAG (AT 10 - NSB/RB/CSD These notes have been Prepared for briefing purposes only and should not be used for detailed analytical work. Approved For Release 2007/11/13: CIA-RDP80T01471 R001500080005-4 Approved For Release 2007/11/13: CIA-RDP80T01471 R001500080005-4 AIRFIELD' DIEN BIEN PHU,. NORTH V IETNAM, . 21-23N 103-01E