SITE LAYOUT AND SECURTIY MEASURES AT ZAVOD 2, UPRAVLENCHESKIY/KUYBYSHEV

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP81-01030R000100430002-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
12
Document Creation Date: 
December 23, 2016
Document Release Date: 
November 5, 2013
Sequence Number: 
2
Case Number: 
Publication Date: 
January 6, 1955
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP81-01030R000100430002-1.pdf422.45 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT SECRET Tills material contains information affecting the Na- tional Defense of the United States within the mean- ing of the Espionage Laws, Title 18, U.S.C. Seca. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. 50X1 COUNTRY USSR (Kuybyshev Oblast) REPORT 50X1. SUBJECT Site Layout and Security Measures at Zavod 2, Upravlencheskiy/Kuybyshev DATE DISTR. 6 itg5 NO. OF PAGES 14 50X1 -HUM DATE OF INFO. PLACE ACQUIRED THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE, THE APPRAISAL Of CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 50X1-HUM 2, On page 11, paragraph 6, the worde Otdol and Tsekh have been correctly trans- literated, but they are incorrectly written in the Cyrillic alphabet on the diagram of the pass. SECRET 50X1 50X1 ? #X ARMY #X NAVY I #X I AIR VII I IARC 1 1 I 50X1 NOW Wadanolon dlifrIbution Indicated by "X", Mold dlotrIbvIlen by "*".) Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 // Declassified in Part - Sanitized Copy Approved for Release 2013/11/05 CIA-RDP81-01030R000100430002-1 'SECRET !XIXXIMUNNIONEMMEB 50X1 COUNTRY USSR (Kuybyshev Oblast) SUBJECT REPORT 50X1-H UM DATE DISTR.,' 7 Get -$141/ Site layout and Security Measures at Zavod 2, NO. OF PAGES 13 tipravlencheskirnuybyshev THIS IS UNEVALUATED INFORMATION NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO 50X1-H UM REPORT NO. 50X1-H UM ???????=1!??1inimill ' SITE LAYOUT 50X1-H UM 1. the following point& on\ layout sketbh of State Research Plant 7,4 known as Zavod 2, in Upralvenoheekirg0X1-H Klaybyshev, Ma (see page 13).1 of the buildings and sheds were - UM well-supplied with fire extinguishers, and each building had ac.fire watch guard and a fire alarm box which was activated by breaking the glass and pushing a button inside the box. Most of the buildings had supplies of water and sand on their roofs for use in case of fire, and several of the buildings had fire towers on top Qf their roofs. The Soviets were very fire conscious, and their fire prevention regulations were rigidly observed. Point 1 Large Workshop Hall This hall had concrete foundations, brick walls, and a curved steel girder roof which was covered with wood. The haill was 300-350 m. long x 80-100 in. wide x 7 in. high, and 1,2 m. to the top of its curved roof. It was said that this hall had been built in 1937-39 by technicians 50X1-HUN as a research plant for hydro-technical problems in connec- SECRET IIICIUMHXDINIBINZOBLEX Declassified in Part - Sanitized Copy Approved for Release 2013/11/05 : CIA-RDP81-01030R000100430002-1 Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 SECRET -2- tion with the building of a power plant which was to have been located on the Volga near Krasnaya Olinka. When . World War It came and plans for building the power plant were abandoned, the large workehoP'hall was used for menu- featuring 'weapons. Water tanks flied for hydro-teohnioar ? experiMents were'etill.in the basement, but! had been covered over with concrete. The'halliwae heated by wari air bliiiiers which were fed by the central heating plant (Point 2). There was a fire watch tower on the roof of, this building. this building were located the Sheet Metal Shop, which had previously included Workshop 3, the Manufacturing workshops 1-A and 1-44 .the Tool Making Work- shop 4, and the Small Parts Manufacturing Workshop 6. Along the walls iround these shops were glass partitioned offices which were used by various workshops and departments. Point 1-1 Lateral Wing of workshop Sall This portion of the large hall was two stories high and made of brick. /t had a slanting wooden roof covered with ?tarpaper. . The Sheet Metal Workshop 2 was on the ground floor. On the second floor were the offices of the Planning Department, Deadlines Section, Technology Section, Jig . Design Department, Archives, Chief Engineer, Chief Klee- ? trioian, and Chief Mechanic. Point 1-b Workshop Hall Extensions The physical description of this extension is the same as for Point 1-a above. On the ground floor of the eastern part were the smithy which was part of Workshop. 3, office' space for the Safety Engineer, rooms for the Telephone Section, and the Cashier's office. On the second floor4 was the office space for the Finance Section, the Admint .Section, and the Statistics Section. On the ". ground floor of the western part was the heat treating part of Workshop 3, including several electric ovens. On the second floor was the office space for the Plant Director and his staff, the Administrative Director, the Welfare Inspector, and the Shipping and Purchasing Department. Point 1-o West Wing of Large Workshop Hall This wing was of brick, two stories high, 35 m. long x ? .45m. wide. It contained one large hall which was two stories high. The hall contained the office space and small apparatus test stands of Department 23. Several of the small apparatus test stands projected outside the walls of the building. SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 50X1 Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 SECRET .3. Point 1-d East Wing of Large Workshop Hall Until summer 1953, the Carpentry and Paint Workshops were located on the ground floor. In summer 1953, the Carpentry Workshop was moved, and ovens for the Electroplating Work- shop were moved in. Parts of Workshop 39 such as the acid ovens, solution tanks, etc., were located on the second floor. Point lise Sind Blasting Shed This was a smill brick shed containing the sand blasting part of Workshop 3. Hydraulic Press Shed In 19534 a small bripk shed connecting Points 1-e and .1-b was built. A hydraulic press was installed which\ 1was used for manufacturing turbine blades. Point 1-f Point 1-g Air Compressor Shed A small brick shed was built onto the east wing of the large workshop hall (Point 1-d). The shed contained a diesel motor driven air compressor which supplied the entire zavod with compressed air. 'The pressure supplied was always 2-3 atms. (excess). Outside this shed were two compressed air tanks, each with 209000-309000 liters capacity. Point 2 Central Heating Plant The heating plant was a brick building, 10 m. high x 20 m. long x 25 m. wide, with an iron chimney 20 m. high. This plant was operated with coal and heated all the buildings of the zavod. The insulated pipes carrying the steam heat were laid directly in the ground for the older buildings and in concrete channels for the newer buildings. Point 3 Assembly Hall Building This building was made of plastered brick with a tarpaper roof. It was 40 m. long x 20 m. wide x 10 and 12 m. high. The middle portion of the building was the engine assembly hall 10 m. high. The ground floor of the two end wings was also part of this assembly hall. There was an over- head traveling crane in this assembly hall. On the second floors of the end wings, which were 12 m, high, were storage rooms for parts and various offices. In summer 19539 an annex was built onto the north side of this building. SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/11/05 : CIA-RDP81-01030R000100430002-1 50X1 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 - Point SECRET -4- This building was a restricted area and a special stamp on the worker's pass was required for admittance. 4 Material Storage 'Point .This building was a wooden shed,, 30 m. long x 10 m. wide' x 5 m. high. It was used seastorage point for engine material. It had a loading ramp leading up to it, so that trucks could easily unload. It was well-cohstructed and had a slanted roof Made' of wood and tarpaper. .Point 5 Scrap Area, This was an area 40 in. wide x 50 m. long, surrounded by a 2 in. high board fence. There was a crane in this area. The scrap consisted of old metal lying around the plant from previous work. Point 6. Electrical Workshop Building This was a small wooden house 15 in. long x 20 in. wide x 3 m. high with a wooden shingle roof. It contained Elec- trical Workshop 33 which had armature Winding machines, lathes, electrical test machines, etc. The house also contained several offices. . Point 7 Transportation Department. Fire Department, and Medical Offices This small house had the same dimensions as the electrical workshop building (Point 6). It had a partition in the middle. On one side were located the Transportation and ? .Fire Departments. , On the other side was located the zayoes Medical Office, which contained a first aid room, a waiting room, the dentist's office, and the doctor's office. Point 8 Storage Sheds These, three small sheds for material storage were 20 m. .long x 10 in. wide x 2.5 in. high. They were made of wood -with slanted tarpaper roofs. Light metals, plexiglass, rubber, steel., etc. were stored here. One shed held an office. Point 9 department 17 This was a two-story, white plastered brick building with a tarpaper roof which.housed Department 17 - Materials. Testing and laboratories. It was 40 in. long x 20 in. wide x 10 in. high. It contained several workshops with materials testing machines, such as bending machines and pulling machines, plus regular workshops with lathes; milling SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 50X1 Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 PEClitT -5- machines, etc. .The building also contained an organic Chemistry laboratory, an iUorganic,chemistry laboratory, a,thermo-electricity libOrktory9 and office space for the engineers. :There was a storeroom in.the cellar and a fire' watchtower wis located on the roof. Point 10 pitod Entrance and Gultrd.House . . . -tiflain entrance to the zavod was through a wooden house, 10 m; long X 3 m. wide x 2.5m. high, with a slanted tar- paper roof. The building was in three parts. The weet side was an office for the watch officer of the day, a weapons storage point, and a guard room. The east side housed the .regular guard commandantand zavod pass issuing office.. The middle of the building was divided into' two channels ihrough which the workers entered the zavod area. Between the tiro channel's there was a small island, from which the panes were given out. The recipient then showed this pass to the guard at the end of the channel and, was permitted, to enter the zavod. At the end of the doe passes were also surrendered at this point. ' Point 11 Ametylene.Ga3 Generating Plant This was a small brick building, 12 m, long x 6 m. wide x 3 m. high with an iron plate roof. This.buitlding housed a large.anetylana .gas_generator. Pipes fed the gas under pressure.to the various shops and teat stands of the raved. Point .112 Storage Sheds These were two' or three small wooden; sheds which were tined to store steel plates and scrap eletal. One ot the sheds had a press machine to press the scraps together. The surrounding area (Up to Point 13) was enclosed by a simple two or three strand wire fence and contained scrap heaps. Point 13 Curved Wooden Building This building had a log frame, covered with boards. It had a rounded wooden roof, with overlapping rounded.shinglee. It was 100-120 in. long x 35 in. wide x 3 m. high at the sides and 0 in. high in the middle. Along the lengths of,both wal1s were glass partitioned offices for the Technoiogy !apartment, offices for the OTK9 a storeroom, a spare parts room, and a deg room for the workers. About two-thirds of the main body of the hall was occupied by Workshop 5 with lathes, milling machines, eco. The remaining one-third wag occupied by the Welding machines of Workshop 2. A large hydraulic heat press, used for forming various en- gine parte, was also' located in this building. 8 E C RE T Declassified in Part - Sanitized Copy Approved for Release 2013/11/05.: CIA-RDP81-01030R000100430002-1 50X1 Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 - SECRET -8- 50X1 Point 20 Water Puglia= Station The water pumping station wee a One story brick building, 20 m. long x 8 m. wide x 3 m. high, With a flat tarpaper roof. It was completed in summer 1953: It contained electrical pumps which pumped the water coming from the water brakes up to the coohng tower (Point 20a). The pumping station had not been put into operation prior to June 1953. This station and 50X1-HUM fhewster:cooling tower (0oint.20a) were built by forced laborers. The entire area was surrounded by a board fence. .Point 20a rater Cooling Tower The water Pooling tower was made. of logs, ibeuf-25 Mt long. x 10 m: wide x...18.S. high. It was built at the:iaMe time as the pumping eiatiOn (Point 20). The water was pumped to the top of the tower, from which it trickled down and was collected in a basin at the base of the tower. ..Be- tween the water pumping station and the cooling tower ,(Points 20 and 20a), there was a water storage basini 12 m.-long x 12 m. wide x 5-8 m. deep. . Point 21 'Temporary Tanking Station This temporary -tanking station supplied the test stands. .It. hid two 20,000 ,liter tanks for kerosene. It also had r. three 1=Tel-two-in operation and one in reserve, which were located above the earth: This area was not fenced in: no protective earthworks around the tanks; 50X1-HUM however, red-buckets, ewes, idd water and sand containers were on hand.. The area was well-illuminated .at night. t . Point *22. Test Stind Suildinie(rOrpue.22) ? This building, which was called Korpue 22-and which pont.- , - -teined permanent Test Stands 1-4, was finished in summer .* 1951. Test Stands 1 and 2 were also finished at this Test.Stend 3 was finished at the beginning of 19524 and . Teat Stand 4 was finished in May-June 1953. This building ? was a restricted area. :Point 23 Test Stand Buildinc This building, which held Test Stands 5 and 6, was made of concrete and brick with a slanted concrete roof. The walla were 600-700mm. thick, and the foundations were of extremely heavy construction. The building was roughly finished and Test Stand 5 was in operation in fall 1952; Teat Stand 6 SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 SECRET -9- was in-operation in fall 1953. Pipes, cables, etc. were laid in an underground shaft. Parallel to this shaft was a tunnel for'personnel which led to Korpus 22 (Point 22). The main difference between this building and Korpus 22. was that here the gas exhaust channels were laid parallel to the.earth,-while in Korpus 22 the exhaust gas channels were led up into the air9 thus also causing more vibration. This building also was of much more massive construction. In it were a small assembly room with a propellor-bal- ancing bench, personnel; officegp and measuring cabins. It was a restricted area. Point 24 New Tanking Station The new tanking station was started in the fall of l'52. It was almoet finished in summer 1953 and pro ably was completed by fall 1953. The pumping 50X1 HUM blinding, built of brick, was 6-8 m. high, had a frontal length of 14-16 m.9 and"had a radius in the rounded section of 15 in. It was recessed 1.5-2 in. in the ground. The building held at least 12 electric pumps; the type was unknown The circular wall consisted of a solid 50X1-HUM bank 'of windows.' In the earth opposite these windows were imbedded five of six tanks; however, excavations had . .been made for additional tanks. ? .Each tank had approxi- mately a?50,000 liter dapacity. From the center.of the top of each tank, two or three pipes jent to the. side, down the 'side, along'the ground where they were later covered with earth, and to the corresponding pump within. ? the pumping building. If the tanks have been covered over with earth for fire protection or concealment Point 25' 50X1 they would project perhaps one-half 50X1-HUM meter, above the earth. The pumping station was located on a gradual slope, below the level of the test stand buildings. Underground pipes led from the pumping station to the test stand buildings (Points 22 and 23).? The pumping station was to replace the older two pumping stations (Points 17 and 21). A group from Bezymyanka did the construction work on the test stand luAlding. and the new tanking station (Points 23 and '24). Source is positive that the construction people had some connection.with Bezymyanka plant, although most of them lived in . ? Kuybyshev. The construction group was .made up of Soviet Any engineers and. civilian 'workers. A road was also built leading directly to the pumping station; previously, tank cars had only been able to drive as far as the kerosene Storage point (Point 17). ? High Teneion Lines The high tension lines ran from the lines connecting Kras- SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 . 4... ?. ? BE -10- -naya Glinka and ZUybyshev to the transformer station (Point 19). They were carried by 14,15 ft. high wooden towers. point Yi6 Rousing Area. ? This was a housing area 'called qUarter 2 which was made Up mostly of wooden 'block heeses.:.: It was occupied- pri- ? , :lazily by workerefrouflavod 2. - 4(110 27 Club Building? This two-story wooden building, 18 m. long x 20 m. wids.x 14 mo high, was located opposite the entrance to the plant. It had a wooden shingle saddle roof. It contained a club' room, a movie .room, and i library. laine. 28 Watch Towers andGuard Reuses The watch tower. were 4-5 m. high and were occupied by one euard at a tile. (The towers have. been Accurately pin- pointed on thesketch on page 13 and are indicated by boxes with diagonal lines 'through them.) They were all equipped with searchlights and telephones for communicating with each other as' well is .with 'the guard house at the main entrance (Point 10). The guard houses (indicated by. ' boxes with crossed lines on page 13) were small wooden sheds which served the same general purpose es the towers, however' they guarded restricted sections within the sand area. 29 This fence was 564 in. high and surrounded the plant area. Three or fOur strands of barbed wire, directed outwards, were atop the fenoi, which was of boards. Directly inside thelence was a 3 m. wide strip of sand, which in turn was followed by a three or four strand wire fence. The sand strip was checked each morning and evening by the guard officer of the day for footprints, and similar markings. Lights on poles inside the plant area illum- inated the fence after dark. ? Point SMITE miasma psioaI Security and Entrance Proeedurem 4., The plant was surrounded by a high board fence (Point 29). There were !three .entrances (indicated by A, DI and 0 on page 13 ). A was the main personnel entrance (Point 10). B was the vehicle entrance but also,w48 used for personnel during rush hours. 0 was used as a temporary entreat's, ISORE.T ? ???? Declassified in Part -Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 50X1 )eclassified in Part - Sanitized Copy Approved for Release 2013/11/05 : CIA-RDP81-01030R000100430002-1 %SECRET for vehicles vehicles only, while construction in the new test stand areas (Points 22 and 23) was going. on. 3. Personnel, upon reporting at the plant, told their pees numbers to the guard at the Main entrance. The guard, after checking- the Person ? against his photograph, issued the pass.' The person then proceeded .into the zavod proper, after showing the pass to a guard just as he entered. On many Occasions, the specialists exchanged passes to see if the guar were really alert. They found that the guards usually were alert and noticed the discrepinCiee. The patsies had to ?be shown to gulids again when a worker entered a restricted area such as the test stand area, the 00 building, and Wodkshop 1. In addition to the usual restricted areas, any area 'could be declared restricted if a State' Test was to be run in it. ' 4. When the workers arrived at their specific offices and workshops, the passes were dropped into a box'for. that purpos e located at the door. The time and attendance people closed the box and took it away at ? Working time so that it was immediately apparent who was late or miseing. ?)asses 5. Passes it the plant were the same in format for all, workers. . The passes were reissued each year, usually in January or February, and ? all workers were photographed each year for this purpose. Visitors to the plant had to report to the pass issue office (Point 10), where a temporary pass was issued. 6. The pass itself was paper glued into a calico folder. The pass had the words 'Otdel (Section) and Tsekh (Workshop) and blank liner printed on it; all other data were written in ink. The pass picture was 'printed so that one corner was left blank, over which a stamp was affixed. The size shown, however, is approximately accurate. 50X1 50X1 -HUM Ot9eab I 4 14,Q,Xe. C - 1 2 , 'Workers Nan. 0 0 (... .... 0 ,,, 4, SL9na.ThurP. \:" ? ot..? ......... SECRET naninssified in Part - Sanitized Copy Approved for Release 2013/11/05 : CIA-RDP81-01030R000100430002-1 Declassified in Part - Sanitized Copy Approved for Release 2013/11/05 :ACIA-RDP81-01030R000100430002-1 ? SECRET -12- 7. In order to gain admittance to a restricted area, a special stamp was needed in the lass. This was usually a circled number which had no relation to the .respective section number and which was changed' from year to year. A workman working in a certain restricted section would have the number valid for that section stamped twice on his pass. If he occasionally had business in another restricted section, he had the number valid for that section stamped only once on his pass. However, when visiting the second restricted section, an additional paper was needed to supplement the stamp. Thie pass iyitem for restricted areas was introduced during the beginning of 1953. Por those workers who had to work during evening or un- usual hours, a list of names was provided the guards, or another special stamp with a signature across it was' necessary. Guards S. estimated number of guardenmployed at the plant to be 80-100 persons, equally divided between nen and women. The guards had no special Uniforms. They were armed for the most part with carbines. The. hours of guard duty varied accohling to the time of the year-and the. weather. In the wintertime, for example, airuard Would have an outdoor post for one hour, whereas in the slimmer he: WOuld_heve the-same post four to six hours. 'Theguarde seemed to ?. be on- duty for 24 hour periods, during which time they alternated between -indoor and outdoor posts and rest periods. Comments SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 50X1 50X1-HUM 50X1-HUM? 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1 IAR 20 202 0 26 w .5? ,07 0 I R 0 o o oo oo o o r cZ 0 0 0 0 0 ? 0 01 0 lb , ? 0 0 lb la 1 sAtti Nits&-, P 0 00 R 0 0 0 0 2 ) 29 0 r 0 50X1 ta.esi- 20 27 SEC RET SITE LAYOUT OF ZAVOD 2 UPRAVLENCHESKIY/KUYBYSHEV Declassified in Part - Sanitized Copy Approved for Release 2013/11/05: CIA-RDP81-01030R000100430002-1