DESCRIPTION OF PECS THERMAL POWER PLANT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP81-01043R000900150009-3
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 13, 2010
Sequence Number: 
9
Case Number: 
Publication Date: 
June 25, 1957
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP81-01043R000900150009-3.pdf853.8 KB
Body: 
Sanitized Copy Approved for Release 2010109113: CIA-RDP81-01043R000900150009-3 50X1 -HUM Sanitized Copy Approved for Release 2010109/13: CIA-RDP81-01043R000900150009-3 Sanitized Copy Approved for Release 2010109113: CIA-RDP81-01043R000900150009-3 L 50X1 -HUM and in operation 1958, The scan for contr?uction of the netir station is secret, but the output ii needed for operation of uraiiu" mines. in the 50X1 -HUM Cooling. der for the old plant is a problem and i6 supplied from veils in t h e a ear Water for the near plant tail be taken from the Danube and brought tbtough 'underground pipes to the new plant 0 Water is cooled at the old plant. by two wooden Cooling t so 50X1-HUM sketch of the existing Pecs thermal per plant. C J~x, #4L Sanitized Corv Arroved for Release 2010/09/13: CIA-RDP81-01043R000900150009-3 Sanitized Copy Approved for Release 2010109113: CIA-RDP81-01043R000900150009-3 L 50X1 -HUM and in operation 1958, The scan for contr?uction of the netir station is secret, but the output ii needed for operation of uraiiu" mines. in the 50X1 -HUM Cooling. der for the old plant is a problem and i6 supplied from veils in t h e a ear Water for the near plant tail be taken from the Danube and brought tbtough 'underground pipes to the new plant 0 Water is cooled at the old plant. by two wooden Cooling t so 50X1-HUM sketch of the existing Pecs thermal per plant. C J~x, #4L Sanitized Corv Arroved for Release 2010/09/13: CIA-RDP81-01043R000900150009-3 Sanitized Copy Approved for Release 2010109113: CIA-RDP81-01043R000900150009-3 L 50X1 -HUM and in operation 1958, The scan for contr?uction of the netir station is secret, but the output ii needed for operation of uraiiu" mines. in the 50X1 -HUM Cooling. der for the old plant is a problem and i6 supplied from veils in t h e a ear Water for the near plant tail be taken from the Danube and brought tbtough 'underground pipes to the new plant 0 Water is cooled at the old plant. by two wooden Cooling t so 50X1-HUM sketch of the existing Pecs thermal per plant. C J~x, #4L Sanitized Corv Arroved for Release 2010/09/13: CIA-RDP81-01043R000900150009-3