P-2 PLATFORM HIGH-PRESSURE BLEED PANEL-GROUND HANDLING
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP81B00878R000600030031-4
Release Decision:
RIFPUB
Original Classification:
K
Document Page Count:
1
Document Creation Date:
December 14, 2016
Document Release Date:
January 3, 2003
Sequence Number:
31
Case Number:
Publication Date:
September 7, 1960
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 70.19 KB |
Body:
pprove
or
e
ease
-
-
ENGINEERING STUDY
LOCKHEED AIRCRAFT GMP.
CHANGE PROPOSAL
87
''
DATE 9-7-6 50
AFFECTS : WSPO ? PROJECT ^
NAME OF MAJOR COMPONENT
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
P-2 PLATFORM
TITLE OF PROPOSAL
P-2 PLATFORM HIGH-PRESSURE BLEED PANEL-GROUND HAVDIMID
NATURE OF PROPOSAL:
1. Design and develop a ground handling panel assembly with bleed valves to be
connected by high pressure hose to the existing bleed ports on the P2 platform
ban rack selector valves. Panel to be designed for use with the Platform
mounted either in the aircraft or on the G.H. cart.
2. Construct and test one prototype panel aesem. Unit to be tested at L.A.F.B.
.3. No ser*rioe bulletin required. Bleed Panelassembliee to be ordered by Depot
purchase requests.
REASON FOR PROPOSAL
To provide a ground handling panel assembly with bleed valves for eliminating high
pressure surges during "sequencing# checkout of the P-2 Platform high pressure
system. Adiabatic temperature rise due to high pressure surges has in some
instances ignited oil vapors.in the system resulting in -a hasar oU8 condition and
damage to the. gages and switches.
ESTIMATED COST AND TIME INVOLVED
ES
ADDITIONAL FUNDING REQUIRED
ESTIMATED COST FOR KITS OR PARTS $565.00 Prototype -- $4h2.00 ea (Production type
C P
(Based on mfg. of 6 ea.)
ADDITIONAL FUNDING REQUIRED :
None SM 21-19
ITEMS AFFECTED BY PROPOSAL
SAFETY
MISSION
EFFEC-
PERFORM-
ANCE
OPERATING
PROCEDURE
INTER- ?
CHANGE-
WEIGHT OR
WEIGHT &
TOOLS 8
SUPPORT .
MENT
MAINTE-
NANCE
PROCEDURE
SERVICE
LIFE
FLIGHT
MANUAL
MAINTE-
NANCE
MANUAL
TIVENESS
ABILITY
BALANCE
EQUIP
^
E]
1:1
p
1
E]
?.
El
^
1:1
El
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT
AVAILABILITY . WEEKS AFTER A 2QUA"
LAO
receipt of Purchase Requests.
DISPOSITION OF SPARES AFFECTED
NOW
INITIATED BY
APPROVED : WSPO
Apj~kBved For Release 2003/01/30:
IA-RDP81B0087600030031-4
a
RDP81B00$78R 000 0031
A
d F
R
l
2003/01/30 CIA
PAGE 1 OF 1