NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

P-2 PLATFORM HIGH-PRESSURE BLEED PANEL-GROUND HANDLING

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP81B00878R000600030031-4
Release Decision: 
RIFPUB
Original Classification: 
K
Document Page Count: 
1
Document Creation Date: 
December 14, 2016
Document Release Date: 
January 3, 2003
Sequence Number: 
31
Case Number: 
Publication Date: 
September 7, 1960
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP81B00878R000600030031-4.pdf70.19 KB
Body: 
pprove or e ease - - ENGINEERING STUDY LOCKHEED AIRCRAFT GMP. CHANGE PROPOSAL 87 '' DATE 9-7-6 50 AFFECTS : WSPO ? PROJECT ^ NAME OF MAJOR COMPONENT PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE P-2 PLATFORM TITLE OF PROPOSAL P-2 PLATFORM HIGH-PRESSURE BLEED PANEL-GROUND HAVDIMID NATURE OF PROPOSAL: 1. Design and develop a ground handling panel assembly with bleed valves to be connected by high pressure hose to the existing bleed ports on the P2 platform ban rack selector valves. Panel to be designed for use with the Platform mounted either in the aircraft or on the G.H. cart. 2. Construct and test one prototype panel aesem. Unit to be tested at L.A.F.B. .3. No ser*rioe bulletin required. Bleed Panelassembliee to be ordered by Depot purchase requests. REASON FOR PROPOSAL To provide a ground handling panel assembly with bleed valves for eliminating high pressure surges during "sequencing# checkout of the P-2 Platform high pressure system. Adiabatic temperature rise due to high pressure surges has in some instances ignited oil vapors.in the system resulting in -a hasar oU8 condition and damage to the. gages and switches. ESTIMATED COST AND TIME INVOLVED ES ADDITIONAL FUNDING REQUIRED ESTIMATED COST FOR KITS OR PARTS $565.00 Prototype -- $4h2.00 ea (Production type C P (Based on mfg. of 6 ea.) ADDITIONAL FUNDING REQUIRED : None SM 21-19 ITEMS AFFECTED BY PROPOSAL SAFETY MISSION EFFEC- PERFORM- ANCE OPERATING PROCEDURE INTER- ? CHANGE- WEIGHT OR WEIGHT & TOOLS 8 SUPPORT . MENT MAINTE- NANCE PROCEDURE SERVICE LIFE FLIGHT MANUAL MAINTE- NANCE MANUAL TIVENESS ABILITY BALANCE EQUIP ^ E] 1:1 p 1 E] ?. El ^ 1:1 El EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT AVAILABILITY . WEEKS AFTER A 2QUA" LAO receipt of Purchase Requests. DISPOSITION OF SPARES AFFECTED NOW INITIATED BY APPROVED : WSPO Apj~kBved For Release 2003/01/30: IA-RDP81B0087600030031-4 a RDP81B00$78R 000 0031 A d F R l 2003/01/30 CIA PAGE 1 OF 1