REFERENCE: TELECON BETWEEN (Classified), 22 APRIL 1959
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP81B00878R000700010098-2
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
November 16, 2016
Document Release Date:
June 29, 1999
Sequence Number:
98
Case Number:
Publication Date:
April 24, 1959
Content Type:
LETTER
File:
Attachment | Size |
---|---|
CIA-RDP81B00878R000700010098-2.pdf | 86.81 KB |
Body:
Approved For Release 2000/04/18 : CIA-RDP81 B00878R00070001
25X1A
P.O. Box 232
Cambridge 38, Massachusetts
Apri 1 24, 1959
25X1A
Reference: Telecon between
Dear Dan;
requirement, we feel that Appendix 1 should be deleted in its entirety and
rewritten as follows:
22 April 1959
25X1A
During referenced telecon it was suggested that contract No.-
be renewed and effective until 31 December 1959. In view of the new
Z4 tat, Sk
The contractor shall furnish and supply to the Government
engineering services for the installation, maintenance and
servicing of Baird-Atomic Type 5111 Periscopic Sextants at
the following rates per man-month:
PCS, Domestic 25X1A
TDY, Domestic M
PCS is defined as assignment to a single location for a period
of sixty consecutive days or more.
The contractor shall be paid the applicable rates for con-
tractor personnel provided herein, while such personnel
are at work sites, in transit to or from different work sites,
and to or from work site and plant.
Transportation which is essential to the accomplishment
of required services shall be an allowable charge. Trans-
portation allowances shall be made for Contractor personnel
and their baggage and equipment from the Contractor's
plant to the site of work, at the site of work while on
official business, between sites of work and return to the
Contractor's plant. Transportation, where feasible, shall
be provided by the Government.
In cases where the Government does not provide such
essential transportation and the Contractor furnishes the
necessary transportation, this expense shall be an allow-
able item of reimbursement.
Contractor personnel shall be available for re-assignment
within the continental United States or overseas upon receipt
25X1 A 4..-.---
a(se 2000/04/18: 0700010098-
.2
'ej /3G
%i~~ T /
Approved For Release 2000/04/18 : CIA-RDP81 B00878R000700010098-2
of reasonable notice by the Contractor from the Contract-
ing Officer.
The rates are based on a normal 40-hour work week (8 hours
per day, 5 days per week). The field engineers shall adjust
their schedules to maintain a 40-hour work week. The
understanding shall be, however, that the field representa-
tives are on call 24 hours per day. In case the work schedule
cannot be adjusted to maintain a 40-hour work week, com-
pensatory time off will be given to the field engineers upon
their return to the plant.
The PCS man-month rates provide that the Government
release field representatives from duty on the following!
eight holidays: New Year's, Washington's Birthday,
Memorial Day, Fourth of July, Labor Day, Thanksgiving,
Christmas, and one additional holiday to be designated by
Baird-Atomic, Inc. The rates also provide that the
Government be billed for the holidays, sick leave not
to exceed one week and the annual two-week's vacation,
since the overhead rate does not include provision for
vacations, sickness or holidays.
The TDY Domestic rate is the same as the one negotiated under contract No.
BA-1832, dated 1 July 1958.
Sincerely,.