Approved For Release 2009/04/10: CIA-RDP81 B00878R001400010009-2
SAPC 'A 16, y g
25X1
25X1
NOV 18 1957
L.UB3ECT; Contract A-101, System IV Costs, Increase
Dear Dans
reference is made to R-W letter CIIICC Doc No. 151x5.756 dated
4 October 1957, your control number, 20205.
Referenced letter outlined the increase in costs of producing
;system IV, its Test Equipment and Instruction Guides. The costs
allocated to FOG are as follows:
Unit Cost
Item Quantity and Fee
System IV 5
System IV Test Equip. 2
System IV Handbooks 12
System IV Test Equip.
Handbooks 6
Total Cost
and Fee
It is our understanding that the contract, as amended by Amendment
Nos. 10 and 13, obligated or a total of
as a result of the above increase is 25X1
for the items set forth above. Therefore, -tne ner increase
In view of the foregoing, you are authorize to obligate from
already transferred to your office, the additional increas of
Please advise if the above agrees with your computations.
Approved For Release 2009/04/10: CIA-RDP81 B00878R001400010009-2
Approved For Release 2009/04/10: CIA-RDP81 B00878R001400010009-2
4 February 1958
CMCC Doc. No., 151X5. 964
Copy _ of z
Page 1of
Contract A-101 presently specifies one prototype and one
production model of the System 4 test set for requirement. 1 and.
two production models for requirement 3. On September 26, 1957
we shipped an improvised configuration of, the System 4 test set
to accompany the two System 4's shipped at about that time. This
test set was put together on a rush basis with concurrence from
Headquarters and was made up of laboratory and field test gear
then in use by our engineering personnel.
Certain functions which are incorporated in the production
version of the test settwere omitted from this improvised set.
Programming test equipment witch. -to quite necessary was not
included because it was not available, at the time of shipping. There
are certain other less important functions which were omitted and
which we now believe should be covered in this test set. Accord-
ingly, we recommend that a mndification kit be prepared and
shipped to supplement the improvised test set. We are presently
preparing a proposal covering the items that comprise this initial
test set and the proposed supplernent.and will forward it for your
approval. With such modification we believe this original test
set will be adequate to serve as one of the two test set required
by Customer No. 1.
We now plan to deliver the prototype System 4 test set for
project use and to send the two production units to FOG.. One of
the production units has been cancelled on the basis that the
improvised set already shipped would serve in its place. Part
of the funding for this production set can be used to cover the cost
of the improvised unit; the remainder of the funding will be surplus.
We will give you a reconciliation of these proposals andfunding when we
forward the cost estimate for the improvised test set.
Sincerely.
0
Bob,
omcu E? M-
1N0 CW~CL ~'x ^LASS.
ta ~~' "b 4 p y `w
Approved For Release 2009/04/10: CIA-RDP81 B00878R001400010009-2
Approved For Release 2009/04/10 CIA-RDP81 B00878RO01400010009-2
Approved For Release 2009/04/10: CIA-RDP81 B00878RO01400010009-2
SENDER WILL CHECK CLASSIFIC/ iN TOP AND BOTTO
UNCLASSIFIED CONF'TTh NTIAL ECR
CENTRAL INTELLIGENCE AGENCY
OFFICIAL ROUTING SLIP
TO
NAME AND ADDRESS
INITIALS
DATE
2
Pro ect Contractin Officer
3
4
5
6
ACTION
DIRECT REPLY
PREPARE REPLY
APPROVAL
DISPATCH
RECOMMENDATION
1
COMMENT
FILE
2
RETURN
CONCURRENCE
INFORMATION
SIGNATURE
Remarks :
D WE AE T RN TO ER
F OM: NAME, ADDRESS AND PHONE NO.
DATE
2/10/58
UNCLASSIFIED CONFIDENTIAL
\,,SECIEEV