STATEMENT OF WORK
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP81B00878R001400010124-4
Release Decision:
RIFPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
August 19, 1999
Sequence Number:
124
Case Number:
Publication Date:
May 7, 1956
Content Type:
OUTLINE
File:
Attachment | Size |
---|---|
![]() | 105.69 KB |
Body:
Approved For Release 2009/04/10: CIA-RDP81 B00878RO01400010124-4 f Z 2(/j-.
C0P'?j 0
EXHIBIT A
CMCC Doc. No. 1131X5.13
Copy / of 4
Page lof2
7 May 1956
The contractor proposes to supply:
1. Engineering services and materials necessary for the design,
construction, laboratory test, and operational flight test of a
production prototype of electronic System No. 4, designed to
meet performance requirements transmitted to this contractor
and developed in general accordance with the procedures set
forth in the accompanying technical exhibit. The work program
includes the following items:
A. Development of breadboard circuits of an entire
system consisting of:
(1)
(2)
(3)
eight (8) sweeping superheterodyne-type
receivers covering the range of 150 mcs
to 40, 000 mcs, inclusive.
two (2) antennas for each of the receivers
with means to obtain course DF informa-
tion by alternating periodically the attenua-
tion inserted in the output of each antenna.
Demodulation and analysis equipment for
each receiver to permit reception of ampli-
tude-modulated, pulse-modulated, and FM
signals.
(4) tape recording equipment to permit recording
of both AM and FM outputs of each receiver
and means to record continuously navigation
data (supplied externally), timing data, and
signal identification data.
(5) an indicator-camera unit available as an
"on demand'' device to provide a video record-
ing capability not provided by the tape recorder.
(6) a channel selector to permit interconnection
of the indicator-camera unit to an active receiv-
ing channel, with provision for lock-out of all
active receiver channels except the one connected
to the camera unit.
SECRET
Approved For Release 2009/04/10: CIA-RDP81 B00878RO01400010124-4
Approved For Release 2009/04/10: CIA-RDP81 B00878RO01400010124-4
J G %.-1\ G I
(7)
CMCG Doe. No. 1131X5.13
Copy / of 4
Page2of2
7 May 1956
a system-check unit to permit a periodic
"in-the-air" check of the functioning of the
entire system (approximately once every ten
minutes).
(8) all power supply equipment required by the system.
(9) establishment of requirements and specifications
for special preflight test equipment and Main Base
test equipment required for maintenance purposes.
B. A completely packaged prototype system, including all
units described in Items A-1 through A-8, of such mechanical
and improved electrical design as to be suitable for environ-
mental testing.
C. All environmental tests necessary to evaluate suitability
of the environmental model referenced in Section B above.
D. Any electrical or mechanical redesign required as a
result of equipment failure to meet environmental tests.
2. Informal monthly progress reports summarizing the work completed
during the reporting period in sufficient detail to permit evaluation
of the project activity. Delivery of reports will be made within
15 days following termination of the reporting period.
3. A Final Engineering Report presenting in detail the analytical and
experimental work completed, the results of all significant tests
and performance evaluations, circuit schematic diagrams for the
equipment units developed, and a complete description of operating
characteristics. Delivery of the final report will be made within
30 days following completion of the final equipment tests.
4. A proposal presenting the estimated costs and delivery schedule
for the required number of production systems will be submitted
to the contracting agency by 1 August 1956.
5. A proposal presenting the estimated costs and delivery schedule
for the special test equipment required for System 4 will be submitted
to the contracting agency by 1 July 1956, it being understood that
test equipment development will be scheduled to make such equipment
available concurrently with delivery of the first operational unit of
System 4 equipment.
SECRET