REQUEST FOR REINSTATEMENT OF VARIOUS RACKS RECENTLY CANCELLED UNDER CONTRACT A-101 WITH THE RAMO-WOOLDRIDGE CORPORATION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP81B00878R001400030047-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
January 27, 2000
Sequence Number: 
47
Case Number: 
Publication Date: 
March 27, 1958
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP81B00878R001400030047-8.pdf79.68 KB
Body: 
Approved For F, (ease 2000 ET CIA-RDP81 B0+0878RO01400030047-8 S.APC-25708 CopyJ-of 6 27 March 1958 MiMORANDUM FOR: Project Director VIA Project Director of D and P FROM Project Contracting Officer SUBJECT Request for Reinstatement of various Racks recently cancelled under Contract A-101 with The Ramo-Wooldridge Corporation Reference (a) SAPC-25776, dtd 25 Mar 1958, attached hereto 1. A meeting was held on 25 March 1958 to discuss the above subject in view of limited savings now indicated by the Contractor. 2. The racks in question are discussed separately below: (a) G, J Racks - The Project Communications Officer, by Ref.(a), has stated that the elimination of this combination of racks from Base B would create more difficult conditions for System 4 checkouts and would preclude duplication of the tape originals. The following cost information was received from the Contractor: Unit Cost - G Rack - $16,661.73; cost to complete 2 cancelled units - $7,767.00. Unit Cost - J Rack - $7,538.29; cost to complete 2 cancelled units - $376.00. Recommendation: It is recommended that the 1 cancelled G and the 1 cancelled J rack be rein- stated for Base B in view of the small Cost involved and the possible opera- tional benefits to be derived therefrom. (b) E Rack - The savings resulting from the cancellation of the 2 E racks amounts to $1815.00; the unit cost per rack is $9,206.89. Recommendation: It is recommended that the 2 E racks be reinstated in view of the limited savings and the operational benefits which could be derived therefrom at both Base B and C. Approved For Release- !~/01 : ,P81 B00878R001400030047-8 ak - 2 - Approved For Release 2000/09/0'1-, CJA-RDP81 BW878RO01400030047-8 (c) H Rack - The savings resulting from the cancella- tion of the 2 H racks is $3,481.00; the unit cost of each rack is $14,639.22 Recommendation: It is recommended that an H rack be reinstated in view of the limited cost savings and the need for the unit for duplication of System 4 tapes at Base B. 3. The Contractor has been advised that the Project no longer desires L racks. However, since 3 units have been shipped or are awaiting shipment, the savings on this rack will be negligible since FOG has also cancelled its L racks. 25X1A 25X1A 25X1A Project Commo 25X1A 25X1A A ng ELINT Staff Officer APPROVED: RICHARD M. BISSELL, JR. Project Director Approved For Release 2000/09/01 : CIA-RDP81 B00878RO01400030047-8