AGENDA SUPPLIERS MEETING - 12 DECEMBER '57 - 2:30 P.M. ELINT EQUIPMENT AND RELATED PROBLEMS SUPPLIER'S PLANT LOS ANGELES, CALIFORNI
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP81B00878R001400110075-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 9, 2016
Document Release Date:
May 24, 2000
Sequence Number:
75
Case Number:
Publication Date:
December 12, 1957
Content Type:
AG
File:
Attachment | Size |
---|---|
CIA-RDP81B00878R001400110075-8.pdf | 122.57 KB |
Body:
pproved For6Iease 2000/09/01 : CIA-RDP81 7.8 001400110075-8
u la 1 i T
SUPFLIB, S MEETING 12 December 757 2:30 P- M-
7- L1KIT EQUI tHi - LE+J4F AND RELATED FROBIMS
STJPPLIBp? e S PLAIT
LOS ANGELES, CALIFORNIA
To review and evaluate the overall status of Project ELI+T
equipment, including the capabilities of equipment, deliveries.
modifications still required, quarters, technical suppuyt, etc,
Particular attent=v on will be directed toward preparation: for
the 958 seasons op .rations to ins-L.ire maximum operational capa-
bility.
II REVIEW OF PROJECT ACTIVITIES 1 34 FLINT ARCH -- PROJECT DIRECTOR
III OPERATIONAL CONCEPT:
A. Location of operational bases, advance bases, types of
targets, indication of probable sortie rate, operational condi-
tions, etc.
E. Con position of detachments - personnel, equipmrent,
vehicles. etc.
C. Test Site o personnel,
program.
IV INDIVIDUAL F UIPMENTS
A. System I
equipment, vehicles, and test
Modification progress
Rambo pre-amps (? Tcv Band)
Ii.RB pre=amps ~P Band)
DOCUMENT NO.
NO CHANGE IN CLASS.
^ DECLASSIFIED
CLASS. CHANGED TO TS S
NEXT REVIEW DATE:
AUTH: HR 70.2
DATE:aZ'REVIEWERI_ 064540
Antenna systems (filters and crystals)
Transistorized System I 25X1 A
FAK and
7. Present and later utilization plans,
System Ill
1.
2.
3.
Revie. of Malfunctions
Results obtained to date; possible improvemmmWLs
Present and later utilization plans
Approved For Release 20901P /91 91A-RDP81 B00878R001400110075-8
Approved For IWease 2000/09/01 : CIA-RDP81 878R001400110075-8
2
C. System IV
1s? Review of yp s of r ,. 'a~nc ~.~sns and corr9ctionc.
2 Changes in eqn p ent or procedures to Improve
performance
3, Operational Si-latus.
4. Technical d 'ficultie .
3a Spare parts backup.
6. Technical support.
7. Status of ;103 and other FOG c bays
8. Re-work of 1101 and #1O2
D. System V
1. Disposition of old System V.
2. Status of new syste ns; presont and later ut ..Li z&-
Lion plans of new System, V
3. Technical s?rpport.
4. Spare pa is plus ~ 25X1 A
Systems VI
? , Progress of pr~~11i nar r d si gn stu ies
2. Use of transistorized Sy ,taem I components.
3. r Cporati onvl ~;,.5...
4. ecP" Band antenna.
5. ckclir.+ l support 25X1 A
6. FMK, and
7. Deta od info on pla.cei ivnt of Pv'oai porjentEi in th s
vehie e 1`l.e-i bility of use.
.1' . Three channel data reduction e