PART 1 - SCOPE OF WORK
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP81B00879R000100040127-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
5
Document Creation Date:
December 20, 2016
Document Release Date:
April 13, 1999
Sequence Number:
127
Case Number:
Publication Date:
April 28, 1998
Content Type:
REQ
File:
Attachment | Size |
---|---|
![]() | 226.66 KB |
Body:
Approved For Release 2007/07/25: CIA-RDP81 B00879R000100040127-0
Wall
Contract No. 17-32-27
1,,,-DM( To SCHEDULE
Emf
PART I - .COPE 'F 'JRK -----------------------------------
PART II - Dz;LI L,iRY ---------------------------------------- 4
PART III - E.JTI ATED COST k T FEE ------------------------- 4
PART IV - PAYT :JT.-) ---------------------------------------- 4
PART V - WAIVr.;h )F ZEQUTREMEWI 3 OF !ENE RAL Pi OVISIONS ----- 5
PART VI - 3F.CIAL ii:CIL;ITY ::..iTFtICTIONS ------------------- 6
F iIFIT "A'- ----------------------------------------------- 7
I'
o
y
n
I'MA
Stefift,
Approved For Release 2007/07/25: CIA-RDP81 B00879R000100040127-0
Approved For Release 2007/07/25: CIA-RDP81 B00879R000100040127-0
SECRET_ tract No. HF-32-27
PART I - SCOPE OF WORK
SCHEDULE
a. The Contractor shall supply the necessary qualified personnel,
facilities and material, and shall use its best efforts to perform a product
improvement program on the 73-C Configuration. These services shall include
but not necessarily be limited to the following:
(1) Engineering studies, designs, fabrication and assembly of
parts, components and assemblies and ground and flight tests
on Serial Number 4, 73-C Configuration, as outlined in
Exhibit "A" attached hereto and made a part of this contract.
(2) Engineering liaison at such locations as may be required for
the satisfactory completion of this contract.
O Complete optical elements for third 73-C Configuration.
b. In the performance of paragraphs a.(1), (2) and (3) above, Contractor
is authorized to use on a no-charge-for-use-basis the Government-owned tooling
and test equipment generated under Contract Yos. SC-21-54 and BC-200 provided
such use does not interfere with the purpose for which such tools and test
equipment were intended.
c. In the performance of paragraphs a.(l), (2) and (3) above, the
Government shall furnish as GYP the following:
1 ea. 73-C Configuration, Serial No. 4.
2 as.. 300" collimators with container.
2 ea. MARK I Hand Controls compatible with 73-C Configuration.
1 ea. Partially completed optical System for 73-C Configuration.
25X1
25X1
d. The Government shall furnish the necessary aircraft, personnel,
and all fuel and oil necessary to conduct the flight tests at the Govern-
ment-owned test site.
PART II - DELIVERY,3ii PPS16!'
Contractor shall complete all work called for under PART I above on
or before 31 J!ily 190A and submit a final written report of the results
of all tests conducted. Informal verbal reports shall be furnished to
the Contracting Officer upon demand.
PART III - ESTIMATED COST AND FEE
a. The estimated cost for the performance of this contract, exclusive
b. The fixed-fee for pe
PART IV - PAYMMTS
rformance of this contract is
a. In accordance with the provisions of Clause 4 of the General
Provisions of this contract entitled "Allowable Costs, Fixed Fee and
Payments," the Government shall pay the Contractor, as full compensation
for the performance of this contract, the fixed-fee as specified in
-4-
Approved For Release 2007/07/25: CIA-RDP81 B00879R000100040127-0
Approved For Release 2007/07/25: rCIA-RDP81 B00879.R000100040127-0
'VW SECRFJ tract No. EF-32-27
PART III above, and the Allowable Cost incurred by the Contractor in the
performance of this contract and accepted by the Contracting Officer as
chargeable in accordance with"Contract Cost Principles, Section XV, PART 2,
Armed Services Procurement Regulations". It being understood and agreed,
without limiting the generality of the foregoing, that the following
shall be considered as allowable items of cost hereunder when incurred
or paid by the Contractor and when necessary and required and used for
the performance of work hereunder:
(1) Expenditures by the Contractor for transportation of per-
sonnel directly engaged in the performance of work hereunder, plus reason-
able actual subsistence expenses.
(2) Premium portion of overtime wages. Such overtime will be
kept to a minimum consistent with the overall objectives of the program.
(;) All costs which have been incurred by the Contractor on or
after 23 May 1958, in anticipation of and prior to the signing of this
contract, and which, if incurred after the signing of this contract, would
have been considered as items of allowable cost hereunder, will be accepted
by the Contracting Officer as costs under this contract.
(L) Research of an applied or developmental nature, provided it
does not exceed 5% of the cost of goods ranufactured by the Perkin-Elmer
Engineering and Optical Division, and further provided that such research
is not directed toward the development of purely commercial items or pro-
cesses.
b. The fixed-fee shall be paid in monthly installments based on
allowable costs incurred by the Contractor and approved by the Contracting
Officer computed at the same ratio that the total fixed fee stated herein
is to the total estimated cost stated herein, subject, however, to the
withholding provisions of paragraph (c) of Clause 4 of the General Provi-
sions hereof.
PART V - WAIVER OF REQUIREMENTS OF GENERAL PROVISIONS
Notwithstanding the requirements of any of the General Provisions of
this contract to the contrary, whensoever the Contractor, in performance
of the work under this contract, shall find that the requirements of any
of the clauses of the General Provisions are in conflict with security
instructions issued to the Contractor by the Contracting Officer or by his
duly authorized representative for security matters, the Contractor shall
call the attention of the Contracting Officer to such conflict and the Con-
tracting Officer or his duly authorized representative for security matters
shall (i) modify or rescind such security requirements or (ii) the Con-
tracting Officer shall issue to the Contractor a waiver of compliance with
the requirements of the General Provisions conflicting with such security
requirements. Any waiver of compliance with the General Provisions of this
contract issued by the Contracting Officer shall be in writing, except
that the approval by the Cont.-acting Officer of any subcontract issued
hereunder by the Contractor shall be deemed to constitute approval of waiver
of any clauses of the 'Jeneral Provisions in conflict with the stipulations
of such subcontract.
-5-
Approved For Release 2007/07/25: CIA-RDP81 B00879R000100040127-0
cong contract No. HF-32-27
Approved For Release 2007/07/25: CIA-RDP81 B00879R000100040127-0
*awe I%W
PART VI - SPECIAL SECURITY RESTRICTIONS
The Contractor shall not reveal (i) the specific nature or any
details of the work being performed hereunder or (ii) any information
whatsoever with respect to the department of the Government sponsoring
this contract and the work thereunder except as the Contractor is
directed or permitted to reveal such information by the Contracting
Officer or by his duly authorized representative for security matters,
and notwithstanding any clause or section of this contract to the con-
trary, the Contractor shall not interpret any clause or section of this
contract as requiring or permitting divulgence of such information to
any person, public or private, or to any officer or department of the
roverrment without the express consent of the Contracting Officer or his
duly authorized representative for security matters.
OR
Approved For Release 2007/07/25: CIA-RDP81 B00879R000100040127-0
Approved For Release 2007/07/25: CIA-RDP81 B00879R000100040127-0
SECREI SW
Contract No. HF-32-27
EXHIBIT "A"
1. Modify and align two (2) each Government-furnished 300" collimators.
2. Remount primary mirror in a newly designed three-point mount.
3. Provide stiff-arm support for "G" mirror mount.
4. Remove structure isolaters.
5. Provide instrumentation and acquire thermal data during flight test.
6. Conduct laboratory tests and, if determined feasible, provide foam
plastic on light covers.
7. Conduct studies and, if feasible, provide mechanical dampers on "H",
"I", and primary mirrors.
8. Remount shutter and gyro-sensor assemblies.
9. Provide means for cutting out eager drive motor, at least during photo-
graphic operation.
10. Assemble, test and, if feasible, utilize three-axis-position servo.
11. Stiffen stabilization solenoid mounts.
12. Determine feasibility of isolating configuration from mechanically
transmitted aircraft vibrations. If determined feasible, provide
crude means of equipment.
13.' Arrange and conduct flight test programs for modified system.
14 ~.o, a4b s I _ 17 n+w?,, ?. 46' s+,.w, Ns. 4
. Lwr----ff ;,--
16 . S-L 3
-7-
SFCWEi