PERSONNEL AUTHORIZATIONS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP81B00879R001000090166-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
October 25, 2002
Sequence Number: 
166
Case Number: 
Publication Date: 
August 28, 1962
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP81B00879R001000090166-3.pdf153.9 KB
Body: 
Approved For Release 2002/11/14: CIA-RDP81B0087&Q01000090166-3 SECRET OXC S M copy ;f at 2 8 AUG 1962 MZMORANDlfJ1 YOR Acting Assistant Director, OSA BJZCT; Personnel Authorisations 1. In the above request for increased personnel authorization for the Office of Special Activities Is the requirement as presently sees the Orations Division. This request has been given ewe! reefui study and is designed to meet the operational concept for alt of the programs, as they are presently envisioned In this Division. A. to the IDEALIST Branch we have asked for additional people because future commitments of this program seem to be on the Increase rather than of a diminishing nature. As you well floe: the past year has produced more ZD.CAUST sorties than those of any ad by fewer people than ever before. year since the conception of the project yet these missions CORONA Branch the addition of the LA.'' ARD program a first mission forecast for fate February. necessitated the request for additional people. d with urgent requirements which are far beyond the capacities to the fact that the OXCART Branch is grossly over- The OXCART program is the most serious of our require- of present staffing. Examples of urgent requirements which must be accomplished new are feasibility studies of operational concepts, development of a mission planning capability, development of command and control concepts, facilities, and procedures. These are but a few of the many complex and time-consuming tasks to be accomplished in date future. At present, the OXCART Basch manning does net provide the Agency with a capability to plan, direct, and control sloes. In short, unless emergency actions are taken at once we will not be in a posture to maintain operational control of L_J Approved For Release 2002/11/1SE P81B0087 -161000O9OTh 25X1 fU~~~~w Approved For Release 2002/11/14: CIA-RDP81 B00879J 01000090166-3 SECRET S. onveertlaag the Control Center Into a complete 5 the capability of manning 24 hours a day yet to be defined we may have to ask for additional #-. White the Office of the Division Chief has not been Increased appreciably It is felt that a modest increase must be granted to gsarante . best managerial supervision of the Division. 7. The entire operational concept for the Office of Special c ,vitteas must be given review and final decisions should be reached that will determine the role the Agency is to play in clandestine r issaance operations and the degree of guidance of policy that 11 is going to establish for the national Interest. Until this decision is re ached a finite concept of operations and the personnel require- vs, e e cannot. be made. Therefore. I strongly recommend and would be most appreciative of your efforts in obtaining approval for this for the Command Post will be forthcoming. In y exist for manning this duty position on a fall 365 When this point in time Is reached a request for . As the OXCART program becomes operational our desire to improve our operational briefings, we have a which is the minimum number acceptable to do OXCART program becomes operational and the brief- low of the urgency of this situation. SIGNED 25X1A It. Colonel Acting Chief, Operat cc: .A/ADM N C A/ODI (28 Aug 62) Distribuation: # 1 - Addee #2 - OSA/ADMIN #3 - OSA /OD #4Appr #5 - ?}SA/RB U ns Division. OSA r Release 2002/11/ iDP81B00879R001000090166-3