PROPOSED CIA/DIA COLLOCATION/CONSOLIDATION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP81M00980R001400090016-1
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
6
Document Creation Date: 
December 16, 2016
Document Release Date: 
November 29, 2004
Sequence Number: 
16
Case Number: 
Publication Date: 
August 1, 1978
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP81M00980R001400090016-1.pdf252.36 KB
Body: 
Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090016-1 1 AUG 1978 MEMORANDUM FOR THE RECORD FROM: Deputy ie?,eal Estate and Construction Division, OL SUBJECT: Proposed CIA/DIA Collocation/Consolidation 1. On 31 July 1978, G. Carter Baird of the House Appropriations Committee called requesting the following information by close of business the same date. a. Confirmation that the last sentence of the DCI note (Executive Registry stamp dated 16 May) concerning the breakdown of components for the pro- posed DIA building should contain the abbreviation "DIA" rather than "DDA," and b. The total SLUC figures for all overt Agency buildings in the Metropolitan Washington Area (AIWA) other than those at Headquarters. 2. With the concurrence of the Director of Logistics and Mr. Ed Sherman, Office of Legislative Counsel, I advised Mr. Baird as follows: a. The DCI note referred to above did contain a typographical error, and the abbreviation should read "DIA" rather than "DDA." Confirmation of this was made by Secretary to the Director of Logistics, in telephone conver*ation with of the DCI office who in turn confirmed it wit who had signed the note for the DCI, and b. Fiscal Year 1977 SLUC costs for the MWA buildings total $17, 0,g79h&0G1ji Ing $9,661,162 for the Headquarter, , P n ngP Photography, and Motor Pool Buildings leaving a total of $7,669,631 for all QCT rd~,r buildings. cc: OLC (Ed Sherman) Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090 A-1 Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090016-1 PROJECT SUMMARY CIA/DIA COLLOCATION/CONSOLIDATION (as of 7 July 1978) In early September the Director of Central Intelligence and the Secretary of Defense discussed the possibility of either collocating or consolidating the proposed new DIA headquarters. facility at Langley with CIA rather than at Bolling Air Force Base, as currently planned by DIA. To that end, a representative of the Office of Logistics and a representative of the Defense Intelligence Agency prepared, during September, a joint staff study which concluded that DIA should proceed with construction at Bolling as planned. This conclusion was based on the belief that the DIA project would be delayed several years if collocation or consolida- tion at Langley was undertaken. The DCI in early October rejected this study requesting that more detailed consideration be given to the advantages which would acrue from the project and that additional con- sideration be given to means by which approval and construc- tion times could be decreased to the point that no delay in overall project completion would result. Another paper was prepared by Agency representatives (without DIA participation) which delinated in great detail the advantages which would result from the proposal and further indicated that the pro- ject-could be completed without delay provided two conditions were met. First, approval for the Agency to contract directly on a negotiated basis with a single firm for both design and construction would be required so that both could proceed con- currently rather than consecutively as presently planned by DIA, and; second, direct participation by the DCI and possibly even the White House would be required to obtain Congressional approval. and funding and local governmental approval within a maximum of 9 months. The DCI accepted this revised study and, in early Novem- ber, provided the study to the Secretary of Defense for his consideration. The DCI further urged that the Secretary of Defense proceed in the direction of collocation or consolida- tion. Subsequently, DIA. representatives requested and obtained detailed briefings from the Agency based on which they could prepare a response from the Secretary of Defense to the DCI on his proposal. No response was forthcoming. Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090016-1 Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090016-1 CIA/DIA COLLOCATION/CONSOLIDATION (Continued) In January 1978, construction funding for the proposed DIA building at Langley was apparently deferred 1 year by the President removing one of the key objections, i.e. con- struction delay, which the Secretary of Defense had to the project. The DCI and Secretary of Defense resumed an incon- clusive dialogue about the construction, but on 4 May the Deputy Secretary of Defense officially advised the DCI that he planned to proceed with construction at Bolling AFB based on cost, anticipated delays, and a desire not to create the perception of joint analytical centers. During May the DCI requested and received additional data which would allay the concerns of the Secretary of Defense, and presumably this data was discussed with the Secretary of Defense in their periodic meetings. Specifically, the DCI requested and received additional data on cost savings which would result from-consolidation and on what DIA elements could be "peeled off" and put elsewhere so only the basic analytical elements would come to Langley. This latter option had been explicitly suggested by the Secretary of Defense. On 7 July, advised the CIA focal point officer of discussions he was having with House Appropri- ations Committee staffers on the project and the fact that these staffers would be contacting CIA on the project. Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090016-1 Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090016-1 7 September 12 September 14 September 15 September 19 September 21, 22 f 27 September 12 October End of Week of 11 October Chronology DCI/Sec Def discussion re proposed DIA Building. DCI comments: (1) building smaller and (2) locate at Langley. A/DDA tasked to prepare paper. designating Note fml to DCI forwarding July Feasibility Study for new construction at Langley to Consolidate CIA (external). Memo to DCI fm Sec Duncan asking for feasibility decisions with 3 weeks and Memo fm DCI to Duncan designating Memo to DCI fm McMahon re use of MILCON funds. Further questions re July Feasibility Study fm DCI. Feasibility Study submitted pros and cons. ecommended: (1) DIA continue as planned and (2) Future - more coordinated planning. 0 concurred. withdraws concurrence because although recommended DIA proceed, arguments not strong enough and opens door for "CIA Takeover" per m (DIA Comptroller). Note sent en m to DCI relating above. MFR re 0 conversation giving more info on withdrawal of concurrence. get more.info. Memo and comments fm DCI re study--terrible, etc. Requests more info. withdrew fm study. Letter fm DCI to Duncan saying dissatisfied and have I I regroup and Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090016-1 Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090016-1 Chronology (continued) 19 October 21 October 25 October 3 November 10 November November 5 January 20 January February/March 20 April 27 April 4 May 9 May May 23 May May 31 May Telecon w4 cl He will help get certain info, when rea y, and will not expand study w/o DCI and DOD direction. We propose having specialists examine DIA ops and he refuses until directed. Note fm DCI asking why we haven't completed getting new info. Memo to CIA reps asking assistance on study. McMahon got DIA to cooperate on new study. New study completed and forwarded. Ltr fm DCI to Sec Def forwarding new study and urging consolidation. I Series of meeting for DIA officers on new study. DIA construction at BAFB deferred FY-79 to FY-80 by President. DCI and Sec Def inconclusively discuss pro- posed collocation. DIA still massaging new study. DCI request on duration and steps required for.construction at Langley. Response Memo to DCI fm'Sdc Def saying DIA is going to Bolling AFB. ~C Memo to DCI on cost savings for consolidation Oral request fm DCI re what components planned for building and what could be span off. Response. Oral request fm DCI re additional clarification on 23 May memo. Response Approved For Release 2004/12/222 . CIA-RDP81 M00980R001400090016-1 Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090016-1 Chronology (continued) 31 May Request fm DCI to look at it from DIA's point of view and suggest components for collocation. Response. Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090016-1