MEMORANDUM FOR: EA/DCI FROM: DIRECTOR OF CENTRAL INTELLIGENCE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP81M00980R001400090056-7
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 16, 2016
Document Release Date: 
December 7, 2004
Sequence Number: 
56
Case Number: 
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP81M00980R001400090056-7.pdf165.08 KB
Body: 
Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090056-7 accelerating the proposal at CIA. Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090056-7 Side A 0 tit :ORNDUM FOR: EA/DCI FRQMM: Director of Central Intelligence SUBJ Cr: Tell that man, DD/A Registry me some more data about the CIA/DIA building that the basic study has no specifics on why it is going to take longer to build the DIA building if CIA is in it. Bolling We'd like to have a little table that shows'the date for starting design, completing design, the date for starting, environmental approvals, A:CFC approvals, the date for starting construction, completing construction for the DL4 building at CIA and.at Bolling. I'd like to see the dates for terminal occupancy for how long; and then his recommendations on how to propose of the present DIA buildings that would be vacated when they move into the new building and which ones of those can be extended,.' Approved Fo( Release 2004/12/22: CIA-1DP81 M009R001400090056-7 Tell him I' d like to know at what stage the design for the DIA building is; they -have designed a building several ti.-ms according to my understanding,, but each time k1either the price or the size of the building has changed. Do they have anything in hand today that really suits the building they are going to talk about constructing at Bolling with fiscal '79 funds. Ask him also if they have to get any Capital Planning Commission environmental impact statements or other approvals for Bolling just as they do for construction at CIA. I a suspect if the building is changed any at Bolling they have to go back and get all those things over again, and I feel confident they don't have a Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090056-7 Approved 4 Release 2004/12/22: CIA-RDP81 M0040R001400090056-7 him to pick up all the arguments he can for why it ought to be built at building already designed for Boiling. Beyond that, tell CIA instead of the ones he has done in the other direction. I want to see the pros and the cons; all I got was the cons in his study. Approved For Release 2004/12/22 : CIA-RDP81 M00980R001400090056-7