NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

INFORMATION CONCERNING THE PI EFFORT ON THE CHINESE ATOMIC ENERGY PROGRAM

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP81T00990R000100070025-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 12, 2016
Document Release Date: 
June 18, 2002
Sequence Number: 
25
Case Number: 
Publication Date: 
March 28, 1963
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP81T00990R000100070025-9.pdf199.15 KB
Body: 
Approved FFelease 2002/08/14: CIA-RDP81 T00990R000100070025-9 I I SC-02393163-EH PID 51/63 28 March 1963 Copy - Mn1QRANDCIM FM: Director, NPIC FRfM: Chief, CLAIPID(NPIC) SUBJECT: Information Concerning the PI effort on the Chinese Atomic Ene~'gy Program 1. The following information has been compiled, at your re- qi est, reflecting the currently available photographic cover~Te of Chins., reports caw-)feted, and work currently in progress a. Large Scale Aerial Photogra2by - In 1962 a to the present time in 1963 .proximately 3516 of Mina (including Tibet and Hainan) has been covered by large-scale aeries 1 photography- Twenty-six ails on:s have been accauplished since January 1962. (Attacinent A). Immediate readouts (IPIR or SITSUM) have been performed on all missions. Detailed scans (ICI's) have been acccmplished on 20 of the missions, representing approximately 35% of the Chinese land area. An MCI pea not ,performed In several instances because of a short time interval between dates of can- parative photo coverage or because of camera malfunction. b. KEYHOLE Pho+tograpkosr - IM photography since August 1960 covers 85 to p of Cienunist Chico. Approximately 40% of this coverage is obscLred by scattered to heavy cl Muds ? Twenty-three K I missions have been occanpliahed during the period from August 1960 to December 3.962 (Attachment B). Mission Coverage Indexes have been accomplished on 16 (70%) of these missions. It is estimated that approximately 759 of China his been scanned in sane detail tbraigh accomplishment of ICI's in these 16 missions. c. Reports Completed - The following nu ber of detailed reports, arranged by category, have been produced since 1 January 1960 (not including IPIRa. MCIs or MM): N'P'IC CIA PID.,,_ Guided Missiles 10 Glided Missiles 16 Nuclear Energy 10 Nuclear ftergy 1T Other 5 Ooerat onal 33 Total 25 Other 1 Total 5 d. The following number of projects on China are presently Approved Fctr Release 2002/08/14: CIA-RDP81T00990R1 p ', 70025-9 Approved Release 2002/08/14: CIA-RDP81 TOO#OR000100070025-9 sC 02398-63/KEE Page Two NPIC d CTAA PID Gi-;.da Missiles 4 Guided Missiles 3 Ili; clear Ener 14. gy Nucle ar Energy 5 Total a Operat ional 1_fi Trrans . & Ind. 38 Total ZIT 2. Presently the detailed scanning phase embodied in the 1'1CI Is being innroved?"and it is hoped the bra : 7 crg of missions waiting for this process T-r.tli_ be cut to current inputs In addition selected so:a1- for u~c=i is categrries of installations till be undertaken on < rout .ne basis as -?dditional main?sourer becomes cvailcble. This should care i.etely rain'mize .wy failure to identify and analyze ? tgnific?.nt inat 21ctions as they : ,;.peer . 25X1A ILLEGIB Approved For Release 2002/08/14: CIA-RDP81 T00990R000100070025-9 Approved Fccelease 2002/08/14: CIA-RDP81 T00 LISTING OF z,L Ate: 000100070025-9 (' " "Z NUNN to 0;2.r, 46 ABM 53/63 28 March 1963 Readout 9009 18,19 Aug 60 QA MCI 9013 8,9,10 Dec 60 OAK MCI 9017 17-19 Jun 61 , OAK MCI 9019 8,9 Jul 61 , OAK MCI 9022 12 -14 Sep 61 , OAK MCI 9023 34,31 Aug 61, , QAK, MCI 1 Sep 61 9025 13-14 Oct 61 OAK MM 9028 16,17 Noy 61 , OAK MCI 9029 12-16 Dec 61 , OAK MCI 9031 27-28 Feb, 1-3 Mar 62 , OAK MCI 9032 18-20 Apr 62 , OAK MCI 9035 30 May - 2 Jun 62:' , OAK MCI 9037 23-26 Jun 62 , OAK, MCI 9038 28 Jun-2 Jul 62 OAK MCI 9039 21 Jul 62 , OAK MCI 9040 28-31 Jul 62 , MCI Completed, publication expected Ajri1 1963 9041 2-6 Aug 62 OAK OAK MCI in progress 9043 18-19 Sept 62 , OAK 9044 29 Aug-2 Sep 62 OAK 9045 30 Sep -2 4c:t 62 OAK 9047 5-9 Nov 62 OAK 9o43 24-29 Nov 62 OAK 9050 15-18 Dec 62 OAK Approved For Releb` 2002/88114: 'CIA-RDP81;T GROUP I Excludes' from automatic downgrading and declassificatlon Approved e_ Lease :2p02/08/14: CIA; RDP81;TO Attachment LISTING OF LARGE SCALE TRIAL PUOTOGUAPFtY Missi )n Date GRC-1,00 13 Jan 62 GRC-102 23 Feb 62 GRC 104 13 Mar 62 GRC-106 26 Mar 62 GRC-1:12 16 Jun 62 GRC 1J.3 20 Jun 62 GRC-1.]_5 26 Jun 62 GRC-1.L6 29 Jun 62 GRC-1.L7 30 Jun 62 GRC-1:L9 6 Jul 62 GRC-L 0 10 Jul 62 GFC-1