NEW KLEMENT GOTTWALD METALLURGICAL WORKS IN KUNCICE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00047R000200480009-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 27, 2016
Document Release Date:
April 1, 2013
Sequence Number:
9
Case Number:
Publication Date:
February 20, 1953
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 219.2 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr2013/04/01 : CIA-RDP82-00047R000200480009-7
COUNTRY
SUBJECT
PLACE
ACQUIRED
DATE
ACQU I RED
Dili OF I
CLASSIFICATION SECRET/SECURITY INFORMIX=
CENTRAL INTELLIGENCE AGENCY REPORT
INFORMATION REPORT
Czechoslovakia
New Klement Gottwald Metallurgical
Works in KUncice
MmMVIIOMM.
THIS :MOCUMANT CONTAINS INFORMATION, .ArrteTINI TNC NATIONAL OKFONSA
OF TN! UNITIO S t SSSSS AITN(N'TNA,AIRANINO OF tItLA IN, 'ACTIONS 793
AND 714, OP THE 0.1, CODE, AS AMINDNO: ITS TRANSMISSION ON RCVS.
LATION OF ITS CON TO OR ACCAJF7 SY AN UNAUTNORIZOO PARSON IS
FRONISITtO SY LAN. TNA R OOOOO UCTION OF THIS FORM IS PROHISITCO,
CD NO.
50X1
DATE DISTR. ckf) Feb 1953
NO. OF PAGES 1
NO. OF ENCLS. 1
(LISTED BELOW) (A) 2 pages
SUPPLEMENT TO
REPORT NO.
50X1
THIS IS UNEVALUATED INFORMATION
50X1
L?
Many divisions and departments of the new Klement Gottwald Metallurgical Works
in KUncice are still under construction and only the following are in operation
at the present time:, the main power plant (partial operation), the rolling
mill which produces various sizes of steel thbes? the steel mill and blast
furnaces which operate in three shifts.
2. The plant make, tubes of 20 centimeter diameter at the rate of seven freight-
car loads during each 24-hour period. All of the tubes are marked for export
to the USSR.
3. The power plant supplies electricity for all the divisions and departme ,s
in operation. Equipment for the power plant and transformer station was built
by the Electrical Works in Prague. The plans for the complete electrical net-
work are kept in the main office of the power plant and the key to this office
is in the possession of Mr (fnu) Bradac, chief of the Electrical Works in
Prague who is probably an engineer supervising plant construction workers, Coal
is supplied by the OKD mines in Ostrava and water by the plant'e awn voter
works,
The director te
50X1
there are soot 50X1
lu?vvy worxers including construction personnel, at the plant at the present
time, only a small portion of the employees are Communist
Party members as the majority is hostile to the Party and does not attend meet-
ings. Although CP propaganda efforts which are broadcast over the plaat,s 50X1
public address system are very strong, employees are highly dissatisfied and
hope for an early change in the political situation. In May 1952 the explosion
of a Martin furnace was explained as sabotage on the part of the employees.
5. The plant has its own guard and workers.' militia.
-end-
ENCLOSURE (A): Sketch of the new Klement Gottwald Metallurgical
Works (WEKG) in Kuncice with Legend.
CLASSIFICATION SECRET/SEMITIC INFORMATION
STArd
y
V,V1;`1
DISTRIBUTION
MR EV
-R
npriassified in Part- Sanitized CopyApprovedforRelease @ 50-Yr2013/04/01 CIA-RDP82-00047R000200480009-7
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr2013/04/01 : CIA-RDP82-00047R000200480009-7
ENCIASURE (A)
Page -1-
SECRET/SECURITY INFORMATION
NEW METALLURGICAL WORKS OF KIEMENT GOTTWALD (KG) IN KUNC ICE
11.......
12.......
13.......
15..0.000
Machinery division located in a number of buildings.
Three blocks of wooden barracks,
(A) 30 one-story, tar-paper roofed barracks, 30x10 meters each.
(B) 30 barracks (same as A)
(C) 30 barracks (same as AL)
These barracks accommodate employees of the plant, as well as administrative
offices, workers' council and the police.
Railway station of the Czechoslovak State Railroads in Kuncice. A part of this station
has been built recently.
Old railway station in Kuncice.
Old flour mill.
Main power plant.
(A) An eight-story concrete building, 200x150 meters, fully equipped.
(B) Ground work for new building, 200x150 meters.
Rolling mill for the production of steel pipes. A concrete plant, 400x451:12 meters,
in which steeltubes 20 meters long and 20 centimeters in diameter are produced.
Two cooling towers: steel construction, 45 meters high and 30 meters vide
New buildings under construction. Many excavators at work.
Steel mill.
(A) A concrete plant, 150x50x35 meters,. Place of Martin furnace explosion on 1 May 52
(S) Ground work for new rolling mill, 150x35 meters.
Transformer for rolling mill. A three-story brick building, 30x20 meters.
Source of electric power for blast furnaces. A two-story concrete building, 30x20 metem
Blast furnaces in use.
(A) Main blast furnace.
(B) Six other furnaces.
Three steel towers, 40 meters high and 30 meters wide.
A reservoir of steel construction: 8 meters high and 60 meters vide.
50X1
50X1
SECRET/SECURITY INFORMATION
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr2013/04/01 : CIA-RDP82-00047R000200480009-7
Declassified in Part- Sanitized Copy Approved for Release @50-Yr2013/04/01:CIA-RDP82-00047R000200480009-7
DUAI
ENCLOSURE (A)
Page -2-
SECRET/SECURITY INFORMATION
LEGEND (CONTINUED)
Main- line of the Czechoslovak State Railroad.
17.. .-..-. Newly built railroad track through the plant.
10.. Nev commuter railroad station.
Three-story brick building, 400x100x100 meters.
(A) ground work for a new building, 250x150 meters.
note:
50X1
In the original text some buildings are described as "zdena"; they may mean that the building
is made of bricks or concrete. This word is thus being translated into English as a
building" unless unless it seems to be more accurate to describe the building as a concrete bt:iiiiingj
SECRET/SECURITY INFORMATION
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr2013/04/01 : CIA-RDP82-00047R000200480009-7