JOCHN FOUNDRY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00047R000400430002-7
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 15, 2016
Document Release Date: 
July 25, 2002
Sequence Number: 
2
Case Number: 
Publication Date: 
May 13, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00047R000400430002-7.pdf132.69 KB
Body: 
App TVVe J-Fts al /03 ' 8 82-00047ROOfAQ - I h.. I INFORMATION REPORT CENTRAL INTELLIGENCE AGENCY REPORT NO. CD NO. 25X1A COUNTRY Poland DATE DI STR . /3 MA Y 1 954 SUBJECT "LTochta " Foundr y NO. OF PAG E S 3 25X1 C PLACE ACQUIRED NO. OF (LISTED BEL EN OW) CL S I. DATE ACQUIRED BY SOURCE DATE OF IFORMA.TTON 25X1A TNIN 000UM[0T LONTAINN {NIOANATIOM APILCTINO TNl NATIONAL D/IIM1t 01 TNL VNITLO 1141~f1 O/TNIX TN{ M[4MINN OI TI TLt 19. ![f TI OMf 113 AND 7911 Of TN{ V.S. C90 t. A! AMI*DIO. ITS TAANOMI2110M ON N1TL? LATION Of IT/ CONT1005 TO 0L AIC5 IIT LY AN VOAVTN4NI210 I(0{ON 10 /AON111T{D 1Y LAO. VOL M1NN00VCTION 01 1.11 VOID II IMOAt II010. SOURCE SUPPLEMENT TO REPORT NO, THIS IS UNEVALUATED INFORMATION 25X1X a sketch of the ".oche;" Foundry /Sea Enclosure A7 25X1 X to which the following legend applies. (The locUion of the bull8.irgs gn the eketo1a Are Lgrrec Tho s stanoe hot `ien thri are approxiin tc). Z 1. Administration bs i3aing ard guard houao of brick conat~uction, 3 floors in height and dimensions of 30 x 15 meters. 2. Model construction and experimental 1aborrtory, 3 floors high of brick construction and approximately 15 x 15 meters in site, Machine shops and mills, one floor in height of brick construction, and approximately 35 x 20 meters. Blacksmith shop, one floor of brick construction, 15 x 15 meters. showers and y r?=ls, oa~o s..Me mar, 10 ter 10 x P9 Rt, 6. Passage way of brick construction, Sowidrytof brick construction approximately 30 motors high and 150 x 50 motors in size, This building had one crane of 10-ton capacity and war distinguished by three large chimneys approximately 8 meters above the roof, It also contatnedi (A)-large "Siemens" furnace; (B) large "Siemens" furnace j (0) small, electric furnace; and (D) casting area, 8. Loading and unloading docks and storage area, attached to the foundry. 9. Residential area. 10. Palace "Jochn" Z$alstial home built by former owner of Jochn founds 7. CLASSIFICATION CONT NTIAL DISTRIBUTION ARR EV 3 LAST PAS : F=Lh."I t :UKU CT & ARZA CODU Approved For Release 2003/03/12 : CIA-RDP82-00047R000400430002-7 Approved For Release 2003/03/12 : CIA-RDP82-00047R000400430002-725X1 A CONFIDENTIAL -2- The Jochn foundry was built in 1930 and is located on the main street of Lodz on the eastern edge of the city across the street from-the "Plac Wolnosczi" /Free Square]. When in full production the foundry employed 750 persons who worked two shifts, one beginning at 3 A.M. and the other at 8A.M. The foundry manufactured machine tool parts for lathes and drill presses. Most of the products were used in Poland. Some, however, were shipped to Germany. In 1943 and 1944 the firm also began manufacturing furnace parts. -end- ENCLa6t. E (A): Sketch of the "Jochn" Foundry. 1-6/71o.12 4-12/74o.12 55M CCNF:II'IAL )ES Approved For Release 2003/03/12 : CIA-RDP82-00047R000400430002-7 Approved For Release 2003/03/12 : CIA-RDP82-00047R000400430002-7 CONFIDENTIAL ENCLOSURE "A" SKETCH OF TEE "JOCHN" FOUNDRY RADWANSKI ULICA ULICA PIOTKOWSKI "Palace" Jochn Downtown Lodz 25X1A D Cargo & Raw Material Gate Approved For Release 2003/03/12 : CIA-RDP82-00047R000400430002-7