CONSTRUCTION COSTS OF THE KHERSON AND ODESSA CRACKING PLANTS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00047R000400460004-2
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 23, 2016
Document Release Date:
April 23, 2013
Sequence Number:
4
Case Number:
Publication Date:
May 24, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 129.7 KB |
Body:
11..,
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr2013/04/23 : CIA-RDP82-00047R000400460-004-2
CLASSIFICATION CONFMENTIAL U
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
COUNTRY USSR
Ii
?
DATE DISTR. ...471-Ivlay 1954
SUBJECT Construction Costs of the Eherson and. Odessa NO. OF PAGES 2
Cracking Plants
PLACE
ACQUIRED
DATE
ACQUIRED BY SOURCE
DATE OF INFO
TNI, DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL OLPC000
OP TWO UNITED $$$$$$ 9 WITHIN THE MOANING OF TITLE 139 SECTION* /33
AND /SG, OF ONE U.S. CODS, Al AMENDED. ITS NNNNNN ISEION OR RIFE.
LATION OF ITS CONTENTS TO OR RECEIPT *Y AN UNAUTHORIZED PERSON IN
PAOHISITED ST LAI. THE NEPRODUCTION OF THIS FORM If PU0191017E0.
50X1
50X1
50X1
NO. OF ENCLS.
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION'
50X1
50X
I. The Kherson'Cracking Plant was built during the period 1935-1937.
The refinery was of a standard type and
50X1 . Vas one of the earliest modern refineries in the OSSR. The Odessa Cracking
50X1 plant was identical to t4e.Kherson installation.. Therefore, the information
presented below on the Kherson refinery is also applicable to the Odessa
50X1 plant. Another construction trust built another cracking plant of the same
type. it was located at Kerch. there was also
50X1 one ottir?,?IP:Eryinsk. The rough sketch below
layout of the Khereon Cracking Plant.
about
nerson por
Also used by
tankers
2 M
puliAP station
not to scale, indicates the
"neftekhranilishe"
(oil tanks)
about K M
nort of the city
about
about
550 M
Pipeline (covered)
storage tanks pot Very ropy)
for avgas..The avgas left by
ship or rail..
CLASSIFICATION CONFIDENTIAL
about
3/4
KM
most
no oil
tanks
here
Air EV
_ ORR EV
.???????
.?.
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr2013/04/23 : CIA-RDP82-00047R000400460004-2
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr2013/04/23 : CIA-RDP82-00047R000400460004-2
CONFIDENTIAL
- 2 -
The equipment of the Cracking plant consisted primarily of pipes, filters,
and pumps, There were few buildings - the mechanical repair shop, pump station,
steam power station, and office. The-buildings were of brick. A. brick wall,
about three meters high and topped by broken glass and steel, surrounded the
plant.
2. Because the Kherson Cracking Plant was of a standard type, the cost of con-
struction of the other refineries mentioned above was the same. The cost
would have varied no more than 10%, and any difference would have been occasioned
by adjustment to local conditions, such as varying transportation costs.
3. The total cost of the Kherson Cracking Plant was approximately 23 million
rubles. This figure covered all items, including equipment and pipelines. The
construction work (straitelnii raboti) cost about five million rubles, which
was included in the total cost. "Straitelnii raboti" included earth excavations,
the railway spur line, and construction of the pump station, earth and concrete
foundations for the "neftekhranilishe" (oil tanks), mechanical repair shop,
steam power station, office, and quarters for the VOKhR. The men who acted as
ards and firemen at the plant were referred to as members of the VOKhR
ennizirovaniya Okhrana-militarized guard). In addition, two or three apart-
ment buildings for the plant's workers and other employees were under con-
struction about two kilometers south of the refinery. Each apartment building
had three floors and was to cost about 550 thousand rubles each. This sum was
also included in the total cost of the plant.
50X1
.
50X1
In regard to preparation o e s el e ec
processes o a re ne y ?o not require any particular levelling of a site. The
cost of such items as ditches and foundations was included in the cost of
raboti.",
50X1
- end -
1+6/735.533 224N
1+6/735.54 224N
11-12/735,54 224N
11-12/735.54 224N
11-12/735.54 I27N
11+12/735.54 544N
1-6/735,54 244N
1+6/735.54 I27N
I-6/735.54 544N
CONFIDENTIAL