CONSTRUCTION COSTS OF THE KHERSON AND ODESSA CRACKING PLANTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00047R000400460004-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 23, 2016
Document Release Date: 
April 23, 2013
Sequence Number: 
4
Case Number: 
Publication Date: 
May 24, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00047R000400460004-2.pdf129.7 KB
Body: 
11.., Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr2013/04/23 : CIA-RDP82-00047R000400460-004-2 CLASSIFICATION CONFMENTIAL U CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT COUNTRY USSR Ii ? DATE DISTR. ...471-Ivlay 1954 SUBJECT Construction Costs of the Eherson and. Odessa NO. OF PAGES 2 Cracking Plants PLACE ACQUIRED DATE ACQUIRED BY SOURCE DATE OF INFO TNI, DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL OLPC000 OP TWO UNITED $$$$$$ 9 WITHIN THE MOANING OF TITLE 139 SECTION* /33 AND /SG, OF ONE U.S. CODS, Al AMENDED. ITS NNNNNN ISEION OR RIFE. LATION OF ITS CONTENTS TO OR RECEIPT *Y AN UNAUTHORIZED PERSON IN PAOHISITED ST LAI. THE NEPRODUCTION OF THIS FORM If PU0191017E0. 50X1 50X1 50X1 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION' 50X1 50X I. The Kherson'Cracking Plant was built during the period 1935-1937. The refinery was of a standard type and 50X1 . Vas one of the earliest modern refineries in the OSSR. The Odessa Cracking 50X1 plant was identical to t4e.Kherson installation.. Therefore, the information presented below on the Kherson refinery is also applicable to the Odessa 50X1 plant. Another construction trust built another cracking plant of the same type. it was located at Kerch. there was also 50X1 one ottir?,?IP:Eryinsk. The rough sketch below layout of the Khereon Cracking Plant. about nerson por Also used by tankers 2 M puliAP station not to scale, indicates the "neftekhranilishe" (oil tanks) about K M nort of the city about about 550 M Pipeline (covered) storage tanks pot Very ropy) for avgas..The avgas left by ship or rail.. CLASSIFICATION CONFIDENTIAL about 3/4 KM most no oil tanks here Air EV _ ORR EV .??????? .?. Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr2013/04/23 : CIA-RDP82-00047R000400460004-2 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr2013/04/23 : CIA-RDP82-00047R000400460004-2 CONFIDENTIAL - 2 - The equipment of the Cracking plant consisted primarily of pipes, filters, and pumps, There were few buildings - the mechanical repair shop, pump station, steam power station, and office. The-buildings were of brick. A. brick wall, about three meters high and topped by broken glass and steel, surrounded the plant. 2. Because the Kherson Cracking Plant was of a standard type, the cost of con- struction of the other refineries mentioned above was the same. The cost would have varied no more than 10%, and any difference would have been occasioned by adjustment to local conditions, such as varying transportation costs. 3. The total cost of the Kherson Cracking Plant was approximately 23 million rubles. This figure covered all items, including equipment and pipelines. The construction work (straitelnii raboti) cost about five million rubles, which was included in the total cost. "Straitelnii raboti" included earth excavations, the railway spur line, and construction of the pump station, earth and concrete foundations for the "neftekhranilishe" (oil tanks), mechanical repair shop, steam power station, office, and quarters for the VOKhR. The men who acted as ards and firemen at the plant were referred to as members of the VOKhR ennizirovaniya Okhrana-militarized guard). In addition, two or three apart- ment buildings for the plant's workers and other employees were under con- struction about two kilometers south of the refinery. Each apartment building had three floors and was to cost about 550 thousand rubles each. This sum was also included in the total cost of the plant. 50X1 . 50X1 In regard to preparation o e s el e ec processes o a re ne y ?o not require any particular levelling of a site. The cost of such items as ditches and foundations was included in the cost of raboti.", 50X1 - end - 1+6/735.533 224N 1+6/735.54 224N 11-12/735,54 224N 11-12/735.54 224N 11-12/735.54 I27N 11+12/735.54 544N 1-6/735,54 244N 1+6/735.54 I27N I-6/735.54 544N CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr2013/04/23 : CIA-RDP82-00047R000400460004-2