V-WEAPON ACTIVITIES, DEPORTATION OF ENGINEERS AT PEENEMUNDE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R000100820011-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
November 9, 2016
Document Release Date: 
December 15, 1998
Sequence Number: 
11
Case Number: 
Publication Date: 
November 12, 1946
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R000100820011-2.pdf101.95 KB
Body: 
Approved For Release 4 IA-RDP82-00457A @~-0A12a082 CENTRAL INTELLIGENCE GROUP INTELLIGENCE REPORT COUNTRY Germany/Russian Zone SUBJECT V-' aeon Activities, Ds 1. Landeeverw ltung 5chwerin> The Germans are used only in daytime al- though dismaxr,Uling often Was on through the night. There apparently is some confusion between those constructing and those dismantling. New scr ua f cr platforms, for instance? were taken and shipped by the dismantlers on night shift. Deportees include engineers Mathis, Hanisch, Pehie, and construction engineer Tolingyl (also received Tolingki). They were.confined to their homes on 21-22 October and shipped with their familit&s from Zinnowitz on 24 October. Two important engineers escaped on 30 October and we-e ndLreccptured. Peeenei de workers are attempting to escape every day, ;pecifyiwg' thy: ? Brit:shi Zoaa as t,icdx goa.l:4 laying of cables to platform seven, and the providing of electric current for a so.-called movable meteorological station with cover designation of initials F1S (Field teorological Station?). 2,, Simultaneous dismantling is proceeding fast. Some equipment, has al- ready been shipped via water from Peen flnde harbor,, and it is planned to ship specially heavy equipment and V-weapons in the sates' msnnerb Tracks were relayed between Werk Ost (mast Plant) and harbor b 3. Over l,00O German workers have been drafted since 20 October through the At Peene? Inde launching platforms seven and nine are in process of reconstruction and assembly with eighty experts employed. Work is ;ipso progressing eta V is " reea -apan" for platform seven., The "Brenn- wagon" is orda?ed to be ready within six months. Other jobs include install tiun of the electrical equipment for the " nnwa n", be Director of Central lnte?'_gence te; aS