TUNGSTEN MINE AT PECHTELSGRUN TO BE TESTED FOR PITCHBLENDE CONTENT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R000600690010-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
November 9, 2016
Document Release Date: 
December 18, 1998
Sequence Number: 
10
Case Number: 
Publication Date: 
June 23, 1947
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R000600690010-3.pdf87.69 KB
Body: 
Sanitized - Approved CENTRAL INTELLIGENC,E GROUP INTELLIGENCE REPORT COUNTRY Gery/Rusaian Zone SUBJECT Date: B 0 -4 2 AAuth 2 DDA REG. 763 01908. CHAN x TO : TS 0 DECLA ?IED no Chi in Class. Doc rat No. aff his document contains information rig the national def,)nse of the United the Espion tes within the meaning of 32 as amended' DATE: 25X1A6a f F0. DIST. QZ_june 19,7 PAGES Act 50, U.S.C. 31 and Its transmission or the revelation o manner to an unauth prohibited by law. ed person is CLASSIFICATIOM SE _`P 25X1A6a Tungsten Mine at Pechte1sgrOn to be Tested for Pitchblende Content 25X1A6a Gyp 10 March 1947,-Lt. Col m Kogan of the SMAD Mining Division told an official (name and title not given) of the German Central 63 Administration for Industry that the tungsten mine in Pechtelsgrun (K33) was to be omitted from the Administration`' s production plan:: A Soviet uni took over the mine, excavating was halted, and Soviet en inee -s b e a n to make arrangements to determine the presence of Pitchblende ., During 1946, the Pechte lsgr{ln mine produced ten to twelve tons per montth of tungsten concentrate. Five additional tons per nonth were produced by two other mines in 'the area, at GottesbE -5, (K31) and Bergsegen (unlocated) a These two mines are still in operation and have not been requisitioned to date by the Russians for trim particular purpose? Sanitized - Approved For Release : CIA-RDP82-00457R000600690010-3 is contents in any