MARIBORSKI OTOK POWER PLANT, MARIBOR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R002500640012-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
November 9, 2016
Document Release Date: 
January 29, 1999
Sequence Number: 
12
Case Number: 
Publication Date: 
March 31, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R002500640012-5.pdf168.5 KB
Body: 
OUNTRY ?JBJECT : ACE -3,CQUIRED CLASSIFICATION 25X1 A2g Sanitized - ASOMAtcltrTIKIFOLIMPAOWYRDP82-14@i4?471RIMM= INFORMATION REPORT CD NO. SWIM* uuNFIDENTIAEATE DISTR. 31 MaR 1949 rariborski Otok Power Plant, raribor NO. OF PAGES 2 Yugoslavia 25X1A6a )ATE OF INFO. Der-46er 1948 25X1X6 25X1A2g I NO. OF ENCLS. 1 ch'- LUSTED BELOW SUPPLEMENT TO REPORT NO. The Uarioorski Otok hydro-electric plant, situated 630 eeeere free, the village fe7 Kamniea on the Drava River, is one of the smaller 15,000 Ka power plants Lo be completed by the Republic of Slovenia according to the Five-Year Plan The Germans began construction on the plant between 1941 and 1945, as a part of the LEVI combine (Aleen-Elektrowerke A.G.)e After the war the plant MIS taken eeer by DES (Drzavne Elektrarne Slovenije), but since 1946 the power plant has come under the jurisdiction of ELZAP-(Pardjetje za Elektrifikacije Zapada - Project for Western Electrification ,which has its headquarters in Zagreb, &ZAP is responsible for all power plants, overhead power lines, and major else - erica' installations in Slovenia., The Maribor branch of the Gradis tionstruction firm continued work on the Mari? borski Otok plant9which was begun by the Germans according to the Saufer System, Leading technicians in the operation were Engr. Vladimir PIPAN and Enpr. SEVER., Lack of qualified mannower retarded the progress of construction, but in 1947 1,100 workers, including 400 German PW9s,were employed in the operation, and the main installations were completed by the spring of 194P, According to an early plan, three turbine units with vertical axles and 110 Kva vertical generators were to have been installed. These are partly completed but are used at minimum capacity, since the original plan has been altered and the units are to be rebuilt. In the turbine rooms there is also an exciter motor a generator switch (generatorsko ucinke`ernostikalt), and pr^tective and alarm devices. Nhen the turbines and generators were mounted in 1947r and 1948, various spare parts were supplied by J. M. Voith, St. Poelten, Austria, which had also supplied the original machinery. Locks for flood-gates were produced by the Factory for Screw and Bridge Construction in ?aribor. Some parts for the penerators, left by the Germans, were made by AEGeUnion in Vienna. The generators were mounted by the state firm Rade Koncar, formerly Juposiemens, of Lagreb. The first turbine unit was put into operation in June 1948 and has a potential outpUt of 20,000 Kva. Activation of the other two units has been postponed until the summer of 1949. All three units will have a total output or 60,000 Ky. 4. Plant identifications NuMbers of buildinrs and installations correspond to those on the attached map., CLASSIFICATION STATE NAVY itkr4MY # AIR )CNSR13 FBI Illis-4 cument Is _hereby re ta to the CONFIDE TM! CONFIDENTIAL in accor. I e with the NO a letter of 16 Oct& 978 from the Director of C Intelligence S Archivis e United States. eview DateSanitiZed - Approved For Release : CIA-RDP8 Date'' '- .1 Y: DISTRIBUTI 21 ...,????????.11 Documatit-No, 01 s C Sanitized - Approved For Release : CIA-RDP82-00457R002500640012-5 tommiso CENMAL INTaLIGENCE AGENCY .4a 25X1 A2g No 1 Reinforced concrete dam with three towers. The dent is 18 meters high. Na. 2 Sineleestory, stone office buildinr with a tile roof. No, Single-story, stone garage 4th tile roof. No. 4 Tile-roofed switch house, connected with the dam by a tunnel. No, 5 Open-air transformers (Prostozracna naprava). No- 6 to 8 Single-story, tile-roofed work shops. 5, The Mariborski Otok lant distributes its current into the Fala power net. (see map), A generated current of 110 Kv is transformed to 65 Kv0 before it is fed into the Pala line, but this is a temporary arrangeraent; a new 110 Kv line has just been completed batmen Dravograd and Mariborski Otok, Another 110 Kv line between Velenje and Mariborski Otok is planned, out work on the project is being delayed by shortages of insulators and switches. According to the Five-Year Plan, the power plant and all overhead lines should have been finished in the firet half of the five-year period, out progress has been thearted by shortages of supplies which must be obtained abroad. 6, Key Personnel: ? Engr, Anton VORSIC, director; 45 year" Te;e1; 1.75 in tell; fair complexion, VORSIC was a Christian Socialist before the war, and belonged to the Christian leftist club narjan. He was an ardent member of the OF during the war, but is now disillusioned and moderate. Teehnician Bruno PETROVEC, deputy director; 35 years of age, born at Maribor. He is an araent adherent to the TITO regime, and is pre- sumably a Communist. COlkAL Sanitized - Approved For Release : CIA-RDP82-00457R002500640012-5