DEVELOPMENT OF WATERWAYS WITHIN THE FRAME OF THE SIX-YEAR ECONOMIC PLAN
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R003700320012-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 20, 2016
Document Release Date:
January 12, 2006
Sequence Number:
12
Case Number:
Publication Date:
November 22, 1949
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 114.62 KB |
Body:
tr r.
i,i.!?t7~JIf'fldil ,iii I I 1. 4 A
C . Approved., F~AIe 2-004598-03 i ~7 tJ&
INFORMATION REPORT
.OUN'' R?Y
.:UB,'ECT
PLACE
ACQU'RED
DATE OF INFO,
1Mt9
DOCUKEKTCOKYAttS6fmPODtlntlONAFP2CYISOTdIINATiC 8LaeVEQDe
OP THE QICITIID STATIM WMIn THE C1220110 01, TITS YSP1ONAbS ACT EQ
D. 0. C? Of AND 32. AD Asffi1DII9. ITS TDAKSHtASfO!4 OS SWE Q6VILATION
OF IT:' COIJTOW" to "V MANW5II YO AK SAASTP.OfRZKD PIM500 IS PQO.
whit D by LAT/. IJDPIODOOTI0C OP TDIS FORA IS pnnlSITBD.
CD NO..
NO. OF ENCLS.
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
1, The Six-Year Plan includes extensive projects for the develop?ent of inter
corrmunications in Poland, with ':1arsaw as the center. The Fro jects, which,
25X1 according; to Or, S. Kowaleski (Under Secretary of State) will cover 22,000
Ins. of rivers and canals at present not navigable, may be divided into
four rain tasks:
Development of 7ateroays within the
Frane of the S Lx-Year Economic Plan
a. Bast-'Jest Y to ys
1) This will run from the 3astern j rontier alon+7:
a) The River-Bug
b) The River Vistula
c) The Bydgoszcz Canal
d) The River Notee
o) The laver Uarta
f) The River Odra, thence to
g) The navel. Canal in Cermny
2) It is planned to exrloit Poland's peog'aphical position to secure maxi-
-mm transport for coal, iron ore, -,rain, tinter, oil, stone, etc. by
the dovolopnent of the above watormy. It is expoeted that the ggr-otr-
ing volume of goods e=h-jam od hnt~,een the 110?R and. Central and 'Iestern
Buropo =sill follow this route.
b. i1orth-Cou ? k ter av
This will follo=.r the river Vistula, connectinrr the flandonierz district
(whore, in accordanc? with the Plan, a large industrial center for the
r.tetallurgical, cow ent, and electro-technical industries will be developed)
'sith the Baltic. In the first stage of the dovelopnent of the irat^rt-xay,
the goods will be transported in bangs of a capacity of not ^ore than
600 tons. After re-,xlation of the e,)urso of ttlo river am! dredging ?x)rk,
it will be posaiblo, to use 1,000 ton bargan.
c . flo th-F,ast ' Tastez*? the
1) Canal r-uteo:
Document No.
NC CHANGE in Class.
^ DECLASSIFIED
0/6
Class.
C:iA JT D TO:
D'.)A Mc,-.j, 4 Apr 77
25X1
Approved For Release 2006/02/02: CIA-RDP82AOO4 7
700320'0 2 3
Date; 2 3 MAY 1978 B
R
lLTh t3 0A
25X1
NO. OF PAGES 2
DATE DISTR. 22 ';tov 49
Approved For Release 2006/02/02 : CIA-RDP82-00457R003700320012-7
SEC /COiJROL - IL S. OFFirIAI.S ONLY
CENTF.AL L rELLIrr7CE A?ZCY
-2-
25X1
a) River Pisa ) will connect the Maury district with Central
River farew) Poland.
b) Augustow Canal) will connect Augustow Forest with industrial
River Biobraa.) center--.
2) The dovelopnent of these waterways would make possible the more
efficient exploitation of the northern and eastern areas,, which
are predominantly tiz:iber producing and agricultural. These water-
trays will also be of Importance to the Bialystok industrialare?t.
d. Const ctjpn ogre Canals
The Canal ti:ould start, at Zeran (north of 11arsaw) on the River Vistula
and join the River Bug at Zegrzo, its purpose being to shorten the
Bug Nare,w-Vistula route,
SECRET/COP7TR0L -- 11. S. OFFICIALS O11LY
Approved For Release 2006/02/02 : CIA-RDP82-00457R003700320012-7