MOSCOW - SEREBRANY BOR TEST STATION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R004600120003-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
November 16, 2016
Document Release Date:
February 11, 2000
Sequence Number:
3
Case Number:
Publication Date:
May 4, 1950
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 152.88 KB |
Body:
TMTEUI. ax 41
Approved For Release 2000/05/18 : CIA-RDP82-00457R00460
CLASSIFICATION SLC' T/COI TROL U.S. OFFICIiILS 0111
CENTRAL IN :LLIGENCE AGENCY REPORT N
I N F R AT I O 9 REPORT CD NO.
42- 0 516 f
COUNTRY USSR (Uzoscow Oblast) CONFIDENTIAL DATE DISTR. 4 may 1950
SU3JECT Moscow - Serebrany for Tort Station
PLACE
ACQUIRED
25X1A
RETURN TO CIA ItBRAit
DATE OF
INFO. thy 1945 - 25 October 1949
25X1X
a. 13oilerhouse (A 7) x: now structure; sic to eight furnaces, gas fueled.
Source laid the l d m; . Two steel smokestacks completed in October 1949.
b. Transformer stations (A 6 and A 15). A 15 without and . 6 with attached
small open air transformer pant.
c. Four-story building (A 4), workshop with a few metal Yiorking machines on
ground floor.
d. "Fountain" (A 13) (was called so by PWWa), stone structure,, 2 meters high
and 6 motors in diameter. A thick tube, which branched out in several pipes,:
protruded from this cylinder. The installation did not seem to be completed.
and otherz by buses. t.7any of them had allegedly been awarded the Stalins
Prize.
About 500 mostly well dressed men, some of whom arrived by passenger cars
CONFIDENTIAL
CLASSIFICATION S 'RET/CONTROL-U
STATE j T AVY NSRB DISTRIBUTION
ARMY L xJ AlR of
This document h. -c y regraded to
CONFIDLN ;'t .Ed rdance with the
letter of i^ (7. ?-'-.er 1978 from the
Director intelli ence t th
Approv dr4 ISRelea 126Q 4QiJ18 : C A-
Next Review Date: 2008
SUPPLEMENT TO 25XJA
REPORT NO.
ja2gtim:
Sao Annex.
2, Plant bgtsllatioias
See Annex.
DesiaMti( of Test Static :
Laboratory, Rocket Research Institute, and Atomic Research Laboratory. All
three dosi tions were learned from Soviets.
4. Data on ?__st.S t. ,,,p: (flgtu?es and letters in parentheses refer to attached
skateh)....
NO. OF PAGES 3
NO. OF ENCLS.
(LISTED BELOW)
Approved For ReleiK~Kd&6~Mt-Y4?A P 6 'R004609g~Q~03-9
CET TRAL IN ELLIGENCE .AGENCY
25X1A
25X1A
as The report supplied by a different source and ,group of interrogators
generally confirms a previous repcwtd* he attached sketch x4hioh was drama
from memory is, as to the layout of the installations? at variance with the
sketch attached $o the mentioned roporh. A thorough check of both Oke ches
rsvealod that they represent the same p1a)x?
b? The lnforn Lion . that %VD officers are on Ord duty at the plant support3
the im, ssion that the work being dono there is top secret and subject to
special security measures a
I Arm: Moscq $einebrany Bor Testing Station
T/COR ROL -U,S OFFICIALS ONLY
6U. ag haur?a:
From 8 am. to 5 p.m., but usually up to 8 p.m.
7o 13t:
None
8. quktd c,,, jj% ;
14VD officers,., no EM.
Approved For Release 2000/05/18 : CIA-RDP82-00457R004600120003-9
Approved For Rele sWd6vf/G'9A-Wf
r CENTRAL 3` J LL TaiE AGENCY
"Laborats R
Fence
Uowrn
Administration building
Factors bui31,ng
Former dwelMmg house
Tx anforner station,
Bo:ilerIlouoe of xabor to installatloza
Building, presumably seat of x anagnment
Building,, lab=to y or medic=al station
Gamp
Low- hall-liko build
Hal -liko build xg
F;Founte,u" Hall-like workshop
R004609ARq~03-9
B V.llas
a Children, P home
D Gao pipelim
E co pipeline being laid
F Now sottlpm zr build s
o Clap No '7435A VT
/I
3 Camp No 7435/L5/II
3 "Factory"
I buildings of con$truotion f irrra
L Roads leading to Lead '"aIxonaoy groo.i Objort A to Lorain rad ;basso 0A$ miler,
c .RoL 4r.s. 'ICXA ONLY
Approved For Release 2000/05/18 : CIA-RDP82-00457R004600120003-9