ACTIVITIES IN THE RUSSIAN ZONE METAL INDUSTRY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R004700170010-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 4, 2011
Sequence Number: 
10
Case Number: 
Publication Date: 
April 19, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R004700170010-8.pdf119.89 KB
Body: 
CI-A,;SIF1CATI0N . Ir7lrkllfl.es^ ?;)",T' ,r ?- -iT. -nr.s -- 50X1-HUM Sanitized Copy Approved for Release 2011/02/04: CIA-RDP82-00457R004700170010-8 iNTFLL?FAX Y CENTRAL INTELLIGENCE AGENCY REPORT MFO ATIO REPORT CD NO. COUNTRY Gerrlar (Russian Zone) SUBJECT Activities in the Russian Zone 'etal Industry PLACE ACQUIREI DATE 0F INFO. TRIO DOCUUENT CONTAINS IWPOAUAT10d1 APPECTINO THU WATIONAI.OG'PENOE OF TUN URITED STATES WITHIN THE &BEANIPIO OP 7110 ESPIONAOZ ACT 80 U. S. C.. 21 AND 32. AS ANSHOED.. 1TS 1OA11E1 OSIOU OR THE OEVEIATIOU OP ITU COUTONTO IX ANT NASESO TO AN OUAUTHORIZGD PERSON IS PRO-TED DY LAG. OEPAODUCTION OF T121S P035 IS PROIUDITED. CONFIDENTIAL DATE DISTR. 3.9 t,P R 50 NO. OF PAGES 1 1 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION The entire copper production at Freiberg is being turned into copper sulphate. The-production of refined copper could still be greatly increased if raw ma- terials amore available. Plants for the refining of copper exist at Ilsenburg and In the IHtttten!.erk llayser.v At Ilsenburg activities are at present nainly res- tricted to the rolling of shoat iron and steel. 20 The lead works Tfuldenhtitte and IIalsbrftcl;ea are smeltin' 1500 tons of lead per month. quipmont at both plants is considerably out of date. Rail contact, is also very bad at these r-lants and they are spread over such a large area that during the various molting processes the ore cools badly. Lead is being mined at the Beihilfo shaft near Freiberg at the rate of 100 tons per nonth. The shaft was completely dismantled in 1945/46 but has now been re -equirred with a new plant 0 ich produces a concentrate of 70 percent purity. 3. The Gar-an-controlled production of re--smelted silic from scrap natal, amounts to 3,000 tons per annum for the entire Zone. No fine or, rolled zinc is being produced at present. /+. Three shafts at Freiberg. are the main sources of tin for the Zone. They are the Altonber , ah?.aft, producing; ores of 30 - 1,0 porcenttin content. ; the. Ehren- frineA.err.dorf shaft, producing; ores of 20 - Y) rercont tin content ; and the Sadisdori" shaft, producing ores of 40 - 50 percent tin content .' Tin ores mined at Freiberg 1? th high bd .Truth contents aro. processed by electrolysis. Thca rlant works ti with 1.6 electrically heated sulphide of sodium baths. This rroceos takes three tireolcs and produces a fine tin of 99.6 -- 99.8 percent purity, The capacity is ton ton^ per month. At rrosent eight tons per month are being rroduced. 5. An antinony plant with capacity of 20 tons per nnonth has been set up at Schloiz and is now in operation. The only aluminum plant in the Zone is located at Bitterfold. It oroducsc 400 tons per rionth. AtteT mts are now being made at Bitterfold to utilize the clay deposits at I3ran3ie near Leipzig by processing with sulphuric acid and chlorine. The corrosion-proof equipment required for this purpose will be produced with the aid of rhenium from the Hettstedt rlant once production there is under ay. li-waersc.nonewerae, r ii?ssstr. 914-1L CLASSIFICATION S kTACOIrR0L - zt,_-. 0 STATE ARMY Document No. --__---------------- CONFIDENTIAL I No Change in , _1 r_j Declassified h aant .i R 1+1 Date: D 1 --- -50X1-HUM Sanitized Copy Approved for Release 2011/02/04: CIA-RDP82-00457R004700170010-8