INCLUSION OF FORMER ITALIAN ELECTRIC POWER STATIONS IN YUGOSLAV NETWORK

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R004800020008-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 27, 2016
Document Release Date: 
November 19, 2013
Sequence Number: 
8
Case Number: 
Publication Date: 
April 27, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R004800020008-6.pdf70.25 KB
Body: 
.... 44 gl ("I ACCIPIrLITICINt ra?CP knI+YrnnT n r: Declassified in Part - Sanitized Copy Approved for Release 2013/11/19: CIA-RDP82-00457R004800020008-6 CENTRAL INTELLIGENCE AGENCY REPORT ONFO MA110114 PI1T CD NO. COUNTRY SUBJECT PLACE ACQUIRED DATE OF INFO: Yugoslavia ZAIFOEiti DATE DISTR. 27 APR 50 Inclusion of Former Italian Electric I Or PAGES Power Stations in Yugoslav Network NO.OFENCLS. I map (LISTED BELOW) SUPPLEMENT TO REPORT NO. 50X1 50X1 -HUM jj Tmo ITOCIMINFt COMMA 1{30.011411011Ancenco TIM NATIONAL DIMOND 1F TN! annta, STAINS Ct111110 TES DRAWN? OF Tin! CSPIONACIT ACT SO ? 0.5. C.. at AND 02. AIN AN SNOOD. ITS TRIDISOIS01011 0.1 THS IrEVELATIOD en IT5 CCWITTWFD in ANT 125t1INTO TO 4 UNAD1RONIZI3D PER5011 15 Pao, ,1112ITED PT LAT. FISPEDINICTION OF Into Paw tO P0.311101711, THIS IS UNEVALUATED INFORMATION 50X1 -HUM The Playa and Doblara power plants on the Soca River were turned over to Yugoslavia by the Peace Treaty with Italy. These plants were formerly operated on behalf of Italian industry, and it was therefore necessary to construct a highLvoltage transmission line to carry this power from the western to the eastern framework of power plants. Changes were also necessitated by the fact that electric power in Italy is of 42 cycles whereas it is of 5o cycles in Yugoslavia. 2. The high line, about 80 kilometers in length, was completed in October 1949, and carries power at 110 KV to Ljubljana, where a converter has been built to convert the frequency from 42 to 50 cycles. This document is hereby regtedea kr: CONFIDENT/AL in accordance with the letter of 16 October 1978 from the Director of Central Intelligence to the Archivist of the United State& Next Review Date: 2008 AIR CLASSIFICATION CONFIDENTIAL! RET/CONTROL ? U.S. OFFICIALS ONLY [ Document No Ch L Class. Auth.: Date: _ ------------ Declassified in Part - Sanitized Copy Approved for Release 2013/11/19: CIA-RDP82-00457R004800020068-6 50X1 Declassified in Part - Sanitized Copy Approved for Release 2013/11/19: CIA-RDP82-00457R004800020008-6 47UUNINUL U, O. UVrIUIALb UNLI CENTRILL INTELLIGENCE AGENCY Doblara and Playa hydro.-electric power stations on Soca River vAPAE litt`.1t 4. ;2 dmdik L i_j* ANA Legend: 1 - Dam for hydro-electric power station - Doblara 2 - Hydro-electric power station Doblara 3 - Dam for 4rdro-e1ectric power station - Playa 4 - Hydro-electric power station Playa 5 - Cement factory 6 - High voltage transmission lines 7 7; Tunnels for supply of water to turbines S ,RET/CONTROL TJ.S. OFFICIALS ONLY Declassified in Part - Sanitized Copy Approved for Release 2013/11/19: CIA-RDP82-00457R004800020008-6 50X1