INCLUSION OF FORMER ITALIAN ELECTRIC POWER STATIONS IN YUGOSLAV NETWORK
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R004800020008-6
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 27, 2016
Document Release Date:
November 19, 2013
Sequence Number:
8
Case Number:
Publication Date:
April 27, 1950
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP82-00457R004800020008-6.pdf | 70.25 KB |
Body:
.... 44 gl ("I ACCIPIrLITICINt ra?CP knI+YrnnT n r:
Declassified in Part - Sanitized Copy Approved for Release 2013/11/19: CIA-RDP82-00457R004800020008-6
CENTRAL INTELLIGENCE AGENCY REPORT
ONFO MA110114 PI1T CD NO.
COUNTRY
SUBJECT
PLACE
ACQUIRED
DATE OF
INFO:
Yugoslavia
ZAIFOEiti DATE DISTR. 27 APR 50
Inclusion of Former Italian Electric I Or PAGES
Power Stations in Yugoslav Network
NO.OFENCLS. I map
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
50X1
50X1 -HUM
jj Tmo ITOCIMINFt COMMA 1{30.011411011Ancenco TIM NATIONAL DIMOND
1F TN! annta, STAINS Ct111110 TES DRAWN? OF Tin! CSPIONACIT ACT SO
? 0.5. C.. at AND 02. AIN AN SNOOD. ITS TRIDISOIS01011 0.1 THS IrEVELATIOD
en IT5 CCWITTWFD in ANT 125t1INTO TO 4 UNAD1RONIZI3D PER5011 15 Pao,
,1112ITED PT LAT. FISPEDINICTION OF Into Paw tO P0.311101711,
THIS IS UNEVALUATED INFORMATION
50X1 -HUM
The Playa and Doblara power plants on the Soca River were turned over to
Yugoslavia by the Peace Treaty with Italy. These plants were formerly
operated on behalf of Italian industry, and it was therefore necessary to
construct a highLvoltage transmission line to carry this power from the
western to the eastern framework of power plants. Changes were also
necessitated by the fact that electric power in Italy is of 42 cycles
whereas it is of 5o cycles in Yugoslavia.
2. The high line, about 80 kilometers in length, was completed in October
1949, and carries power at 110 KV to Ljubljana, where a converter has
been built to convert the frequency from 42 to 50 cycles.
This document is hereby regtedea kr:
CONFIDENT/AL in accordance with the
letter of 16 October 1978 from the
Director of Central Intelligence to the
Archivist of the United State&
Next Review Date: 2008
AIR
CLASSIFICATION
CONFIDENTIAL!
RET/CONTROL ? U.S. OFFICIALS ONLY
[
Document
No Ch
L
Class.
Auth.:
Date: _
------------
Declassified in Part - Sanitized Copy Approved for Release 2013/11/19: CIA-RDP82-00457R004800020068-6
50X1
Declassified in Part - Sanitized Copy Approved for Release 2013/11/19: CIA-RDP82-00457R004800020008-6
47UUNINUL U, O. UVrIUIALb UNLI
CENTRILL INTELLIGENCE AGENCY
Doblara and Playa hydro.-electric
power stations on Soca River
vAPAE
litt`.1t
4.
;2
dmdik
L i_j* ANA
Legend:
1 - Dam for hydro-electric power
station - Doblara
2 - Hydro-electric power station
Doblara
3 - Dam for 4rdro-e1ectric power
station - Playa
4 - Hydro-electric power station
Playa
5 - Cement factory
6 - High voltage transmission lines
7 7; Tunnels for supply of water
to turbines
S ,RET/CONTROL TJ.S. OFFICIALS ONLY
Declassified in Part - Sanitized Copy Approved for Release 2013/11/19: CIA-RDP82-00457R004800020008-6
50X1