IMPROVEMENTS IN THE RAILROAD SYSTEM

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R005100730007-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
April 3, 2001
Sequence Number: 
7
Case Number: 
Publication Date: 
July 11, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R005100730007-2.pdf181.13 KB
Body: 
CONFIDENUAL CLASSIFICATION ? CO1IFI C0172110T, -1J. OBtlICIALO MT.117 Approved Fogitirtaterva hicivdbmwirdt,2_00457RetWift9.071=M 8 FORMATION REPORT CD NO. 25X1A COUNTRY Hungary SUBJECT Improvements in the Railroad System 25X1 C PLACE ACQUIRED 25X1A 25X1X DATE DISTR. 11 JUL 30 NO. OF PAGES 2 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO. 1. The political sectlon of the Hungarian Railways Directorate has received an order from the Pusdan Transport Command * that the Miskolc-Budapest and G-1545116-Vac-41ungarlan frontier lino must meet the requirements of a line of the first class This is. the chief reason for the work Which is being done on this line. 2,, The principal traffic between Budapest and Csap flows along the aehony- Tiyireffhaza-Debre;en-Budapest line. On this line there are two large bridges, one on the Tisza et Zahorgand one at Szolnok. In case of war both bridges would constitute ,lerioue hazards. The Russians have decided to avoid using this line and have fixed upon the line Csap-Satora.3.jaujhely-Miskolc-liatvan- Budapest aa a sunatitete, since here there are no river hazards. Use of this line up to the present has been prevented by damage caused by the war. Also, the reconstruction of the double-track line between Iliskolc and Budapest was completed only at the t.Ind of last year. The political section has threatened the responsible officials with reprisals if the entire project is not completed by the end of 3121100 In connection with the question of the supply by railroad of the areas to the west of Budapest, the railroad bridge south of Budapest is also a serious hasard. In order to avoid crossing the Danube, the line Budapest-Vac-Ersekujvar- Bratislava, which is a &ouble-track line, may be used. This line from neap through Miskolc to Budapst and then from Budapest through Vac and Bratislava to Vienna is of the first class, with rails of 0.3 and 44.3 kgoimeter and is capable of carrying even very heavy cars with an axle pressure of twenty tons. 4. The two sections Itiskole-Mapest and Budapest-Bratislava have been linked by means of the suburban ercular line at Budapest. Since in ease of war passage through Budapest varfat easily cause difficulties, the line GBd51.1.8- Veresegyhaz-Vac was reactivated in l94.9. This is the line which was destroyed by the Germans in 3.944 its part of the reconstruction work, this line was also slated to receive firat-clags installations, but the line has not as yet been double-tracked. It is now bo5.ng put into first-class condition. Ilith this line the Russians have at their disposal a direct rail line from Csap to Austria which does not have to cross a river and which does not touch Budapest. CLASSIFICATION NV C C e CONFIDENTIAL Document No. 7 STATE NAVY NSRB -7. Kr 4. 1....1 ARMY AIR A FBI jOrmunoN 1111Mil' L Approve This document is hereby regraded to CONFIDENTIAL in accordance with the letter of 16 October 1978 from the Director of Central Intelligence to the Archivist of the United States wciu Rag*stA2P361A/26? CIA-RD ? Da 82-00457R005100730007-2 ApprovetCHRIPIDIMIALCIA-RDP82-00457R005100730007-2 ????????? coma- LIAL/bonnoL 13. 'm OFFICIALS ONLY 25X1A LITITILIGUICE AGE7TCY -2- - 5. The importance of this linking consists also in the fact that it relieves the section from Budapest to Szolnok and thus facilitates surply from the south, partly by the line Brasov-Cluj-Oradea Mare and partly by the line Brasov-Teius-Arad. By the transfer of the burden of traffic to thelliskelc line, the plan for the reconstruction of that section of the Debrecen line Which lies between KL.Ajszallas and Debrecen, and which man totally destroyed during the mar, has been pushed into the background. 7. The line Budapest-Miskolc has also enormous importance with regard to in- ternal Hungarian traffic, since the great industrial eetablishments of Diosgy8r and Ozd are linked with the capital by it, In order to increase its capacity? it has also been decided that this line will be the first to be electrified, especially the section bet,..yeen Budapest and Hatvan Where the rising terrain presents great difficulties in the hauling of heavy trains of goods, especially since the 2000 ton system has been introduced, 8. As to recent movement of goods trains of 2000 tons, all published statistics are so inaccurate that they cannot be taken into consideration at all, 25X1X Co: Allegedly situated on the second floor of the Railways General Directorate, CONFID2,7,71! AL/CONTROL .riFFICIAL'7 ONLY Approved For Wm 9wONIPIDENT ir82-00457R005100730007-2