JUETERBOG-ALTES LAGER AIRFIELD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R005700180002-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 15, 2016
Document Release Date: 
December 30, 2003
Sequence Number: 
2
Case Number: 
Publication Date: 
August 10, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R005700180002-5.pdf100.47 KB
Body: 
Approved For Rel" 1 1 V f 1/'1L00457R005701fX102-5 COUNTRY .REPORT NOQ TOPIC Jueterbor:--Altes Lager kirfield 25 ALUATION = ---PLACE OBTAINED DATE OF CONTENT, 26 June 1;,50 25)ikTE OBTAINED ~SkFERENCES _...~ PAGES 1 .ENCLOSURES (PSG. & TYPE) _____ _.? REMARKS Soviet Zone of -er aany CLASSIFICATION 10 August 1950 25X1 25X1 25X1 1. The Jueterbog-Altes Lager (11 52/11, 69) airfield was observed between noon and 12:40 p.m. on 26 June 1950. The field. was not occu.iod. 2. An Mr/ runway, about 1,250 x 45 meters Wns being constructed and almost the entire length was concreted. Taxiways were undep6onstruction at both ends of the runway where an area 15 to 20 meters wide and about 30 cm deep was being excavated o No installation of runway lights was observed. There were light poles over all the construction area and along the runway. 3. Construction sheds and narrow-fauge railway tracks rm across the entire landlrit; field o t nloadir ; facilities, with cranes, wore on the railroad spur track on the eastern edge of the field. Cement, crushed stones, gravel and other building materials were stored there. Ito /ork was done in threts shi.:'ts, Between 400 and 500 men, women and yo-an activists worked it the day shift, Six to eight concrete mixers were in use, Grading was being done on the southeastern section of the landing field by the "auunion-~.:ast-j'irm. The target elate for the completion was estimated to be 1 October 19500 reporteo y The 25X1 reported lento o .e runway, v=cn is rece veo or the Firs ime, is Comment. The construction of a concrete rumiky was previously to be completed at about the same tine. v.: c is received for the first time, is believed possible since construc- tion work at other airfields in the Soviet Zone of Coruna r is scheduled believed to be too short since the runway extends acrd-.s the entire landing field, about 1,400 meters, and the graded section west of the field. The length is therefore estimated at a minimum of 1,800 meters. Construction wor1c at night was previously reported. 25X1 Comment. The target date for completion of the construction work, This document is hereby regraded to CONFIDENTIAL in accordance with the letter of 16 October 1978 from the Director of Central Intelligence to the Archivist of the United States. Next Review Date: 2008 CONFIDENTIAL Approved For Release 2004/04/15 : CIA-RDP82-00457R005700180002-5