HIGHWAY BRIDGES OVER THE ODER AND NEISSE RIVERS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R005700600009-1
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
April 18, 2011
Sequence Number: 
9
Case Number: 
Publication Date: 
September 15, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R005700600009-1.pdf163.35 KB
Body: 
Sanitized Copy Approved for Release 2011/04/18: CIA-RDP82-00457R005700600009-1 eNWZ-Q0F WWMEV ^ ^P% CLASSIFICATION ./CoI TRoL -- U. S, OFrIclr~s o:z! CENTRAL INTELLIGENCE AGENCY COUNTRY Germany (Russian Zone) SUBJECT Highway Bridges over the Oder and Neisse Rivers PLACE ACQUIRED DATE OF INFO. 2Jirk7 GIiJC$$S#13RtPISkttiS~.IFiFtlR~k:10F:JY:r~d?HCrIAiG t`&1#F:fIT[OPSk6SDu'F#PJSt< or THY Of2MP ST. .CS WITH111 'kLU MITAUIRI. OP THE ESPIONA00 ACT so O. S. C.., at 4UV 820 88 &fiMaUH6? ITS YRk$9010SIOd 02 THR REVELATION O WS COi'ITrsT2T6 IN AM 4" MR TO AU UPIA YEiOTUXED FM ON TS 'Rq-. OVAIWO Sy aiSC[.. i d>ii DUCvDm G -mm FORM W ARGH1C1YED. Convent. This Soviet request for submission of a report on the REPOR DATE, DISTR. 15 September 1950 NO. OF PAGES 2 NO. OF ENCLS. 1 (2 pages!) (USTED BELOW 50X1 SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION the status and planned maintenance work of the highway brides along the Ocrn.an-Polish bordero u-k coax. n o?ord.er bridges The 50X1-HUM Soviets apparently attach great importance to the availability of adequate fire fighting equipment at bridges since this point is dealt with at great length for every bridge mentioned, Some of the existing bridges are not listed. It is not clear tether they wore intentionaly omitted or whether reports on there were not requested by the Soviets since they are destroyed. These bridges include the -"der River bridges in Schwedt, t?euglietzen, Neu- 50X1-HUM ruednitz and Fuerstenberg and the c eisse River bri,:'ges in Gube_, Gross ' dente he following convents pertain to bridges Ile ervorflutbruecke, bridge across the flood area of the Oder "iver, at Iuestrin-Kietz (0 53/V 66), is on National Highways No 1 and 111, which run from ' erlin to Danzig and 'Warsaw via uestrin (0 53/V 66) o It is a steel structure resting on four concrete piers. It is 90-meters long and has a carrying capacity of 60 tons. Slight damages were repaired. The bridge across the Oder River in Kuestrin is also on National Highways No 1 and 11I. but on terra. to held b-,- the Poles u Details on this bridge were previously reported , The emergency bridge 50X1-HUM over the Oder River near Frankfurt (0 53/V 63) was built 300 meters do-?m- stream from the former highway bridge which was destroyed, It is a wooden structure with a roadway 8 meters Zvide. The old Oder River bridge in z= ran-_furt is on .National h ighwrays No > and 167 which run from Berlin to 3reslau via Frankfurt. It is still destroyed. It had eight spans, each 30 meters long. It is planned to rebuild it in its original form, using the bridge piers that remain. The superstructure of the bridge is to be of steel or reinforce(,'. concreted The reconstructOd.:bridge .All possibly have a movable spah 65 meters long to allow boats to pass,. Since the funds allocated :' or the reconstruction of the bridge were cut from two million to five h .ondre seethe piers and abutm-+- ? CLASSIFICATION /CONTROL - U. SS. OFFICIIALS ONLY _ _ srATF raAVY i sae.,. .._,~..,. .R...... DISTRIBUT1014 4IdtAY.. +? 1AIR # IX I F131 INFORMATION D NO. CONFIDENTIAL In accordance with the I I This document Is hereby regraded to - _ .....w. ,..vuiyc~iov Iv III" I Lla.e. Archivist of the ittatas_ ` 1 Un ed S Sanitized Copy Approved for Release 2011/04/18: CIA-RDP82-00457R005700600009-1 CONFIDENTIAL Sanitized Copy Approved for Release 2011/04/18: CIA-RDP82-00457R005700600009-1 UM LUa /OOP ROL -m U.S. OFFICIALS ONU be built this year, the reconstruction of the bridge proper being postponed until 195ii. Clearance work for the reconstruction of the piers is now in progress, The bridge near Bademeusel is can the Autobahn from Berlin to the Upper Silesian industrial area via Breslau. It was repaired as an emergency bridge. The bridge acrossthe Neisse River in Goerlitz is on National Highways No 6 and 11$ which run from Dresden to Liegnitz via Goer- litz? It has been reconstructed as an emergency bridge. E 1 I a+t?I 11 r'~Ql~t,~ OFFICI L S OT L Sanitized Copy Approved for Release 2011/04/18: CIA-RDP82-00457R005700600009-1