CLOSING OF CUBAN RAILROAD CROSSING

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R006100590013-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
November 16, 2016
Document Release Date: 
March 24, 2000
Sequence Number: 
13
Case Number: 
Publication Date: 
November 1, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R006100590013-0.pdf79.56 KB
Body: 
Approved For Release 2000/05/18; CIA-RDP82-00457R006100590013-0 25X1A COUNTRY SUBJECT PLACE ACQUIR DATE OF INFO. 25X1A 4,N~~~ta~uedr.u evav CENTRAL INT 6- REPO iI' NO, OMF?RMMTlO REPORT CD NO. V,egmmw Q QRussigm z=8)/?01aV-d crasa9mff 25X1X DATE DISTR. 1 Wavmbar 3.950 NO. OF PAGES I N I n~ 4 . TED BELOW) md 25X1 SUPPLEMENT( Ti REPORT NO. 10 y request of the Polish State Railroads (PKP) the border crossing point of auban (0 52/A 79) is to be closed affective 1. Septeraber 1950 since the railr.-ad bridce across the Lausitzer a'-'eisse in Ouben does not ..feet safety require"entso Traffic will be rerouted via Forst (0 52/A 77)a* 25X1A '00r": Tat,, 'it is not clear -,Lethe_: ~*ovh railro ridi;cs in :juben, raa .oly the :?crth and the &outh . ,rid?e. are to be closed. The ' ort:i :.,ridge 25X1 A vhicd was rebuilt in a .iakeshift way, probao1.y regaiYres a thorough overhaul0 The South Dride was reconstructed in :arch 19500 It is very o:,ab1e~y~tg that it should need g repair G ter such ao~short .i ime fJ The bri railroad across thp~e bjeissse Riy tl epb in Forst V is also an eniercency bricd.o which requires repair. 25X1 A 'h:c docwftent i3 hereby regraded to CCi.r E- 1,11' ;AL in accordance with the it:ter cf 73 October 1073 from tha Dircc.or of Central Intotligence to the Archiv'sst of tho United Stffito& Next Review Date: 2018 CLASSIFICATION Approved For Release 2000/05/18 : CIA-RDP82-00457R006100590013-0