ECONOMIC INFORMATION ON ALBANIA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R006200170012-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 14, 2016
Document Release Date: 
November 28, 2000
Sequence Number: 
12
Case Number: 
Publication Date: 
November 9, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R006200170012-6.pdf75.36 KB
Body: 
COUNTRY Albania CONTROL U. S. OFFICIALS ONLY -- Approved For Re 00457----27 SUBJECT Economic Information on Albania PLACE ACQUIRED DATE OF INFO. 4. 25X1A ~yN DATE DISTR. 9 Nov 50 NO. OF PAGES 1 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO 25X1 X REPORT NO. Text~ du'Y 1. In Tirana., a factory is being constructed for the use of the Stalin Textile Combine. It will be situated 3 kilometers south of the city. Construction was begun in. 1948 under the supervision of a Soviet ILLEGIB engineer. In May 1950, several of the buildings had been completed, ILLEGIB and machinery., brought from a dismantled plant r will be provided by 'the Seli when in operation, will genera PMAMATION. REPORT GD NQ. electricity for the city of Tirana as well. A sugar factory, which now has a daily production of about 7,000 klograms, has been constructed at Maliq. Between 100 and 150 workers are employed. ILL E G I construction of the now single track Pe girl-ETl2asan cted to be completecompldeted. In May 1950, two tunnels in the neirly 3 one was 1,,000 meters and the other 1ex~tf~ ~tAp Lake .2 Reclamation The. reclamation project at, Lake Maliq h succeeded in diverting the waters of the lake through a 3 kilome- r canal to the Devoli River, The. project was begun in 1946; in December 1949, feeder canals leading to the main canal were still under construction. At the head op1he canals a dyke has been constructed to regulate the flow of r. Built of reinforced concrete, it is 50 meters long and has eight water gates. The reclaimed area is to be used for the cultivation of beets and potatoes, the former to be used for the sugar factory under construction in the town of Maliq. Document No= ---- - ------------- Elo aw- W;4' - Il al~a~ ___'LI U -%_-_---