THE MAVAG FOUNDRY AND FACTORY, DIOSGYOR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R006200740010-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 7, 2012
Sequence Number: 
10
Case Number: 
Publication Date: 
November 28, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R006200740010-5.pdf151.46 KB
Body: 
?~nrrzf.r.'-sn4.s. .-~..r~ti. 'r,~ ff%. 0 I! TT ~ii11C TAT, ()ETZ Declassified in Part - Sanitized Copy Approved for Release 2012/02/07: CIA-RDP82-00457R006200740010-5 CENTRAL INTCI Wg . - -:AGENCY REPORT INF R A REPORT CD NO. COUNTRY Hungary SUBJECT The I:AVAG Foundry and Factory, Di6egy PLACE ACQUIRED DATE OF INFO. ors 506, NrCONTAINSINPORIiATIOUSt? LCTtUDSHBflATIOUALDL'P6N9 tLU UNITED STATBD 15ITNIN TNR U A UNO op TI1E p5PIOWAU ACT CO 1). 0. C, 91 AND $2. A161111020. ITS OP STS COMTSSTS IN AMY MAW IEn TO ATN~CNAUTUORIX@D P614DON tS ROt III$ITED Of LAW. RSPA000CTION OP THIS FOUM IS PCOIUIPITRD. 50X1-HUM 1~ The I:AVAG Foundzy -and Factory at Di6egyl3r has its on work ors' sottlcraont equipped with ma-avexwrorks, hospital, etc., with a total of 60,000 inhabitants. 2, The plant is divided into two sectionr I, the Foundry (the "Old") and the Factory (the "IJew") They are able to operate either separate1 or to ether, and eac12 ass its own coal-fired electric pourer plants. As the pover plants generating 20,000 and 2?4,000 IV respectively) are unable to produce sufficient power, the hydro-electric rcn?ier station of Tiezaluc supplies the additionalxequ3.ranents by mean, of a long-distance cable. 3. Appro:cinatoly 20,000 workers are employed. Foundry. This is the original plant, and is Dade up of the Ikartin furnaces and rolling Dills a4 Production: rails, wheels; iron, steel, and armor plates; iron rods; nails. b.. Output of I;artin furnaces: 8 carloads of steel per 24 hours. `.,or?c is car- ried out in 3 shifts of S hours each. e. lectric power: sup41lied by the eastern poerar rlant, 20,000 IV! capacity. da '-Tatar: from the tans in the :uorkorst settler_arant, and discharged into Mahe Szinva brook. e.. Throe underground air-raid shelters, each for 1,200 individuals, have boon constructed in the foundations of the foundry. These. shelters '~avo concrete ,Falls, two nett ^s thick,, fu Four ujater tanks,, each of 100 cubic meters capacity, have also been built underground. In addition, space has boon provided for planning and con- struction offices, Main cashior's office and administration offices, CLASSIFICATION M . - _I-FBI Document No. -------------- Ho Change In Class. I] Derlassumcd Class, Changed To: TS S Auth.: 1C- Date: DY DATE DISTR. 20 NOV 50 N.Q. OF PAGES 2 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT O. THIS IS UNEVALUATED INFORMATION 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2012/02/07: CIA-RDP82-00457R006200740010-5 Declassified in Part - Sanitized Copy Approved for Release 2012/02/07: CIA-RDP82-00457R006200740010-5 C a 3L i 14 f?a~ A.;to ~C'r~iiC, . facto y0 The factory consists of t.v-ro parts. First Part a., ?Porkshop for the treatment of plates., b p Turning 2, athe raor'.zs01op for production of tnxn barrels. c a Poet station, capacity 24,000 K'J.. Tiro groups of boilers & crane tacks tiers installed in 1944 1945 u da Coal bunker (in front of the roucr station): caT city 100 track loads o ~ Uater: likewise cones from the l corkers y settlortont v Second Part: f~ This part is entirely soriarated from the .'i rst. it is the act al xn factory and a.-?srrysanition--tostiA1 station, :?rVch special caves in the gill-~ side for anrrntion. The terrain is vor