RUSTAVI METAL WORKING COMBINE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R006500430017-2
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
10
Document Creation Date:
December 14, 2016
Document Release Date:
March 28, 2002
Sequence Number:
17
Case Number:
Publication Date:
March 13, 1951
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 502.18 KB |
Body:
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017
CLASSIFICATION alla.i 1. +.:il_.u~'V /x 1 C L?tt~) L1 i'!v1ss i..-jLY
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
COUNTRY Us3a{ (Ceor.ax.an JSh)
SUBJECT IbuutFlvi -petal Combine
25X1A
25X1X
PtANY v r1s -[3 _ C)15YR{BUT10ioi
STATE
r
pit2 v^ FB9
Ai2M1Y " NO. --- --_____
REPORT NO.
CD NO.
DATE DISTR. I:z_ c?r.
NO. OF PAGES 10
NO. OF ENCLS. 4
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
1...
ected six furnaces. The foundations of this construction
were completed. One charging crane was also completed
with two others under construction. Two smokestacks were
at the northern side of the workshop. One collapsed in
the Sumner of 1949. For sketch of the open-hearth plant
see Annex Ton 4.
a., The location o: the plants under construction ww as pro-
viousl.y determined and is correctly recorded in this
report.
b. Being previously observed in an early stage of con-
struction, the plant Layout was not completely covered,
and, therefore, the attached sketches and le; ends are
definitely valuable, especially as Annex 1 is the first
sketch to give such drytailed information. ',' Ith most of
the plant Installations located northwest of the power
plant, and with this area closely observed by source,, it
Is assumed that the whole sketch approaches facts pnr-
ticularly as the location of the fain plant departments
such as rolling mill, open-hearth plant, and rover plan
corresponds with previous Information. '..rile earlier in-
formation reported modern conveyer belts connecting coal
bunkers and boiler house of the po,.er plant, this report
-?ives details on the modern coal bunters of that section
. ex 3)
c. The production of construction materials is still ac-
ceptable as true for late 1949. Since later information
did not indicate any operation of open?he:rth furnaces,
the second source must have mistaken a test in January
1949 for real operation,
..r ~lt s {t ~..1 3 1 .l 1 . .. 1 it...3 .. ? .....
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
CONF IDEI'JT I..aL~/C^7 ?Tri(T~R~ O1L/USy ~~OFFICIALS ONLY
V JS 1St:L INi-LJLLIGENCi AGENCY
D
4 l~~nnexo I~ Plant layout of the metal v orking plants
in Rustav .
2 9 Foundry
3. Coal dump
4., Open-hearth plant,
3-
CONFIDEI TI.siL/a()I`TI1CL/US OFFICI#.L ONLY
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
CONJ?IDEN'Li.AL/CO'.1;TROL/US GF'FICI/kLS ONLY
a L I SUG 99 AG UT
A Metal voiking combine
I Two-story brick building, 20 x 20 x 8 meters, occu-
pied by a firm. for electrical installations assigned
to construction work
2 Garages, 20 x 50 x 10 meters
3 Fitt in; shop and vulcanizing shop, 30 x 20 ; 10 meters
4 Concrete plant
5 Oxygen plant
Sawmill
Food depot
Four buildings under construction
9 Asphalt plant, 30 x 10 x 3 meters , workin on road
constructions in the ':lant since ebruartl 1 9
10 Carbol neurn tank
11 impregnating bath for railroad ties
12 Locomotive repair shop, not in oper,:tion
13 Tank construction shop, 70 x 5 , 0 x 13 meters brick
building, operating since the Sumer of 194b; tanks,
similar to railroad mounted tanks have been manu -
fact tired
14 Steam heating leant y 20 x 15 x 15 meters, three-story
brick building In operation since ,.arch 194 3,,
15 ilodei-making carpenter shop 50 x 25 x 12 meters, brick
building, in operation since the Summer of 1947
16 Food depot and fire department, 100 meter long brick
building
Building, under construction
(?i-17 IF i..'.TT I r'cL('i ( T T1 CL! i ,
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
'.0NPIDLYITIed,/CUiiTRO'L/ S O.FFICI LS U1 LY
CMk AL INTJ LLIGAJC.& AGENCY
D
25X1A
13 Forge forro-concrete structure, 100 x 40 x 13 meters,
operating since 1947
19 Foundry, for details see sketch NNoo 2
20 Adruinistration, 50 30 x 12 fr eters, three-starer
brick building
21 Mechanical workshops 130 x 80 x 20 ureters, :'erro-con-
crote building, in operation since the Sumer of 1943
22 Administration of mechanical ,workshop s 50 x 30 x 12
meters, three-story brick building, connected with a
roofed passage to No. 2 is
60 x 40 x 15 meters three-story
ressor station
Com
s
p
concrete building with 13 high pillars 25X1 X
0
24 Llectrical orkshop, long section 13 meters hi h with
basement 3 meters deer, short section 13 meters high;
operating since the Ia ,1. of 1948
Several stores and workshops
26 Coal dump with conveyer belt (for details see Annex 3).
27 i xcava.tions 40 x 40 x 10 meters g for oil tanks accor-
ding to 3ov: et engineers
Under rouand concreted canal, 220 cm wide s 2 meters high,
with three pipes s one 60 cm in diameter, the two others
24 cm in diameter, connecting the open-hearth plant to
the Kura River0 The canal has several ventilator shafts
(a)
29 - chainistration under construction; foundations completed
30 ;coking mill under constrt2ction, abort J,000 meters
10:1,g'' and 300 meter,'-,-3 o~ide
31 Transformer stat.o t 3o x 25 x 1w r-yoters s three-story
isa~m~r!r~ne!rt,c= rs.-'+~ciler.E?_ oporatit s,irrC?ctal"ax.fa7V' ~..!1a~
32 ? O ier ,slant, p-rtially in operation since '`ebrt:tar3r
1.949 cast section still ?under construction., with two
srnokestac~.s 4 mete-~?s high at the northern. side of
the building.
33
Mess hall
34. Building under constri .ction
114.1EZ _ I,1 L1 .A 1 .1 IJ: 1i3k/ U~..:' U. I~.....-..a... e'~1r~.:~ (. fl.~..,.E.
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
CAQ0 FIDs:,1TIa L1CC,%J` X)L?U 0, FILL O" 0.41Y
35 Blast furnace, foundation and framework coLpleted by
September 1949, aaith two sets of three air heaters
36 Warehouse and office of a constru.,tion firm
37 dater rese:.'voir
38 Building under constriction
39 A' Administration of open-hearth plant
40 Open hearth plant under coret ction, Jith three smoke-
stacks at the northern side
4]. Open workshop, roofed .;ith corrugated sheet-x etal
42 Steel fr..mes with wooden floor, 50 x 50 meters
43 Lime plant under construction
B PW Camp No a 7181/2
C PIT Camp Noe 7181/3
D Soviet labor camp
E Barracks and apartrr.dnt olockao
JUI~iN'IDEi;TI:L~/CL?3TItUL-US I3 'i'ICIALS U I: Y
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
CONNFIDENNTIA.%L,ICOI`;TROLJUS OFF IC
Cr NU iL IN,TELLIGiNJE AG Cy
I'M
,f# 06 L Y
Foundry s Ferro-concrete structure, 140 x 100 x 25 metes
pith one furnace, in operation since 1940,
1 Ore dump
2 Coal dump
3 Two cranes
4 Two sand pits
Sand drums
6 Sand rider
?7 b onveyor belt
3 Two sets with three preheaters
5" Three cast furnaces, one in operation
10 Store with finished pieces
11 Store
12 F`a el of stand dump.
13 Two cranes
14 4irea wre castings are polished
15 Liectrical tt1tLn'., furnace with two electrodes, ,p'r'oduc-
tion of steel
16 Preheater under construction
3.7 Repair shop
13 Transformer station
19 Two spur traces
Production of, iron ,'_,;yids 2 x 2 meters, t a.per?ed tubes 6 cm
thick, 120 cm long vary.~.o.g from SC to 40 cr., in d.3 ame era,
i-.i :._ . \ -'"6"a .i?. ? ~`~ f~' 1 II ,, yy`` {" 't-?F? AFB I. `,. `? ot.TL
aAu .A..4S ~-, 3. t .v 1J .:. ILJ..dV 4..%III 1
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
r _. aLa~
COI FID1Jl`a IfsL/COI TaROL/U':7 O?' t1.1 I(I.~ ~+ +
C.C "3MIL ~.eJ ~`J 111IC.~n~ h AG,91CY
a, Three coal pits ti ith. tl ree conveyor belts transporting
the coal to another conveyor belt at the southern end
of the pits
h. Two railroad tracks betrieen the pits for coal. shipments,
--8-
COY3a. L+`TaiAL/CO;~'ROL/'UT
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
CONFIDENTIAL/CONTROL/US OFFICIALS ONLY
C. d` t L I:N'1',y;LLxG IC& AGAZICY
A Open-hearth plant
I Administration, four-story stone bu:lding, 40 x 20
meters
2 Mixing shop, iron structure, 200 x 50 x 33 meters
on concrete pillars,, covered with corrugated sheet-
metal, the sides are not completely filled, subdivided
into several bunkers, presumably for coke, lime and
pig iron,,
Two railroad spurs two 15 ton cranes and two 30-ton
cranes are available.
3 Open-hearth shop, 200 x 60 x 22 meters, with
a. Two open-hearth furnaces, completed in January
1949, and space for two additional furnaces, furnace
capacity 100 tons.
by Enlargement for the fifth and sixth open-hearth
furnace, foundations completed
a. Two smokestacks, 82 meters high, upper half sheet-
metal, lower half brick. The smokesack to the south-
east collapsed in the uummer of 1949.
dp Section with concreted spouts and casting troughs
with two-ton capacity supported by heavy iron carriages.
Cranes were to be installed
e,, Two railroad.eonneotions
4 `Workshop, 50 x 50 x 22 meters, iron structure with metal
walls, without roof, two railroad connections for loading
of slag
5 Assumed casting shop steel structure, 150 x 40 x 22
meters. The side walls are only 5 meters high, The shop
has two 15-ton cranes and a railroad connection
6 Concrete foundation, 130 30 Meters, to have concrete
pillars for a crane installation
-9-
C,OIIiFIi)1;I'TI.;iL/COs:Ti-,OL/US OFFICIALS ONLY
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2
COTiri'IDI,,I41I.tL/CON P-,OL/U-1 OFF ICI LS "I'DiLi~
Ca#'I liAL 11,MLL Lt r+IC a-uACY I
7 Scrap crushing installation tinder construction
B Steel structure shop 100 x 50 meters, with 30-ton
sv ing crane; the building also houses the office of
the construction firm
C P Camp NO. 7181/1
D PIN Camp No. 7181/3.
lal~~`F:'IDLJ2=P~? eh `s/:J1Js v'} 7 OL/U OFFTC1 " ? ONLY
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457R006500430017-2