THE RTANJI COAL MINE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R006700870003-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
January 16, 2001
Sequence Number: 
3
Case Number: 
Publication Date: 
February 2, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R006700870003-4.pdf160.99 KB
Body: 
CLASSIFICATION C UPS. O'FICS~ars O NL Y 25X1A Approved For ReleaS DOID ERWRjy00457R1"3" MFORMATION -PORT COUNTRY Yugoslavia SUBJECT The Rtanj Coal Mine 25X1 C PLACE ACQUIRED DATE OF 25X1 A INFO. 25X1X CD NO, DATE DISTR. 2 FEB 51 NO. OF PAGES 2 NO. OF ENCLS (LISTED BELOW) SUPPLEMENT TO REPORT NO. The Rtanj coal mine is situated approximately eight kilometers south of Boljevac. The surrounding area is hilly and partially wooded. An over- head ropeway, approximately six kilometers long, connects the mine to its separation plant, which is located at Mirovo. A rough mountain road via Ilno and Boijevac connects the mine with Soko Banja. The mine is ad- ministered by its own directorate., which is located at the mine. and is directly subordinate to the Ministry of Mines of the Republic of Serbia in Belgrade. 2. The total 1949 output amounted to approximately 82,000 tons of stone coal with 40 percent ash content. The total monthly output for January 1950, was 10,000 tons. The entire output is consigned for consumption by the Yugoslav railroads. 4. Developments: 3. Factors limiting output: a. Shortage of manpower b.. Lack of machinery and equipment c? Inefficient management a.. A new drift has been built up to the Lestar district. b.. Construction of electric mine railroad. c