MERSEBURG AIRFIELD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R006800550006-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
March 10, 2011
Sequence Number: 
6
Case Number: 
Publication Date: 
January 4, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R006800550006-8.pdf101 KB
Body: 
Sanitized Copy Approved for Release 2011/03/10: CIA-RDP82-00457R006800550006-8 5UX1-HUM ..a.._~._.a.~, .,.~ ,~.~..~ CLASSIFICATION. COUNTRY 0arraaxnv (Soviet ,one) --,-------REPORT TOPIC I~3r r c~trrat~rr EVALUATIO'i DATE OF CON DATE OBTAIN REFERENCES PAGES REMARKS -.ENCLOSURES (NO. & TYPE) This document is hereby regraded to CONFIDENTIAL in accordance with the letter of 16 October 1978 from the Director of Central Intelligence to the Archivist of the United States. Next Review Date: 2008 CLASSIFICATION DATE PREPAREE IL d: nWs rv 1951 CONFIDENTIAL 1. i shed with a roof and a loading ramp were being built at the railroad spur on the northern section of the Xersnburg (Iva 52,/'D 91) airfield on 3.1 November 1950. Rail oad cars with shipping tickets reading "Ilalle-Mersoburg'Faere unloaded at the ratu_a. T =se cement covering an area of i0c1 c1.5 to 2 meters, was stored in the shed. The cement was unloaded frc u the railroad cars; he shed was to be en1argad. !`: watchtower which was un- occupied was recently erected on the tm torn edge of the field. .soviet soldiers erected a telephone line 6 meters high from the southwestern corner cf the field, over the ordnance de?ot and the barracks area, toward the tovni. 2. 'ore building material, particularly loose cement, wa.!i unloaded between 13 and 27 Novomber, One power shovol and about five con- veyors were on the field. A power line led from the spotlights at the firing range across the field to its northeastern corner. The fence on the southern edge of the field was moved about 50X1-HUM 10 meters toward the south. had to keep e,uuu _ .Laborers ready . or wor a .ie airfield, in E-W runway 2 km3 long was alleged- ly- to be constructed. The K,iawndorf (1.1 52/1. 91) community had to relinquish 350 acres of land, the .exact location oi' ali-ch, how(- - 1-HUM could not be determined, Comment, The arrival of cent in- dicates that the construction of a concrete run way is planned. The construction work has apparently not yet started, 50X1-HUM Sanitized Copy Approved for Release 2011/03/10: CIA-RDP82-00457R006800550006-8