KRASNOKAMSK POWER PLANT (TETS)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R007600240012-3
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 14, 2016
Document Release Date: 
February 8, 2002
Sequence Number: 
12
Case Number: 
Publication Date: 
August 13, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R007600240012-3.pdf464.77 KB
Body: 
CENTRAL`. INTEL ,IGENCE,AGENCY RE 8 ' d; TI REPORT CD N0, WRY USSR (Molotov Oblast) - -- - c+sac ?rInITI Kras oka ' ,k Power Plant z..(trE'I) ?. Approy rke1ease 2002/08/08: CIA-RDP82-00457R?ff 68F2jM8t,% 3 =. ._, A. R 1 se : RjQ0JQ~' :j0*IA-RDP82-00457E NC~a; CENTRAL' INT:EL..IG NCE..AGENCY REPORT 1 IN I F I REPORT co*. COUNTRY USSR (fitelotov Oblast) = EGT Krasnokanv k Power Plant W'.k`S) 25X R4 \ `:'' -St I ?" 3, l ! ton in half. I~rasnokaf3k, k.50-O2PIv ,a~3 as jtjvor, on the main road wi'iien runs in a rLS7 ~r1-~ws~,uua~ u~.a_v.,, >? ?, leax ' `a otov and about ' 20 km r r' b ' yLie' pi.-KJUAU V J.GJtt b/J. vaav -Z>Y s -Steam (about 1 km,, south of the power rl r' - steam and. hot after are piped. The steam and bui:idings tor f a y ac an se jai Conduits into the paper I i E?n 1.200 to 1.500 m tivest of the IGa.rtia X34 C3} ;tt vast by aorthoa;t from Kawan.: fi `stor underway chring the war,) The aid turbine `build ng babl y struction was pro was ;just finished and e 4u.1- rpa after 1945 _-It he construction-25X1A of t new turbine building was still going on, and the a ssemb] ing ? of, the f urbiries had begun, There are apparently no plans for other buildings. Informant assumes the a quipu.ent was installed rnd that the 25X1 A new turbines are in operation, Management of construction and of the plant is in the hands of a civilian .director of Jewish births Commissions composed partly of military persons inspect the plant at infrequent intervals,, 'a,"dismantled German power plant or n.ew^ reparaT?1ons c~~~,a u~rt as n ~* jtrt~ti m. i a modern German machinery, ap',;rently"either from a, dQsCri .7t3.6n of tliC various installations follow'. contains large hoi.Ler$ ror operaT,.i-oa v-L W I V :S W ;CAJ.W vua . . .. - I- __ ... .,..w ..e, ov.a nna,ncxrr$.ed with ApprovedFor. Relese 2002/08/08: -CIA-RD NC 0 OF PAGES DATE DISTF . 13 AU 51 NO. OF ENCLS. (LISTED BELOW) No C h n ~ In2Clads. j 4 024 Iyfass, 1 I UAW Auth.: HR 70.2 . 25X1X 'T'f~aan orta: t'! 03 A spur leads from the coal bunkers to the main line 3h-canting locomotives belorVri.ng, to the .Governme.nt'opaerra.ted railroad;, 'fir Release. 2002/08/08: CIA-RDP.8200457R00760O24O0 C NT'itAL INT.-,LLi.GuNC:, AG N CY l,arg.e :rdll._ north: of and adjacent tol -lies on the same road which passes the power plant 1 . across. from, the petroleum loading station,, breaci.;bake?9 south of and adjacent toad rah ch p saes thei power plant. area., 2, Sketch of power plant area. l :hot water pipe lines also extend into the toran, The steam pipe lines have a diameter of epproxirnatoly lm,. The snitch installations are located in the old power installation:, There i a h.iT h stone smoke b? The new power installation, about 1120 x 35 m and 30 r n,. lies only a fea =tern north of the old power installation.. construction of the ne:a building was about complete, and the installa- tion of machine units was begun,, A large A unit as to be installed, e,? The open transfgrnier installation lies in the southwest:-corner of the, area and occupies a space about Eta x 30 m, The garage,which measures approximately 40 x 6 in, is located near the entrance on the north side of the installation area, There Is space . for 10 to 15 trucks. Adjoining the garage to the aaest.ls a storage area for building, nater:i: Is and boxes of ne installation e,uil~n Brat. Various shops are located in smell. au diary kauin- including.the forme, ,?,ijch lien north of the ne,-i po,.aer builda.n:, and the machine shwp, rahLch lies in the ea.,stesrn port of the .Lnst,a.l_laati.on aria. ff?,, Coal bunkers are north jest of thy; insteiiation area. Co,, %l cars are unloaded by means of r:ioveablo bridge-crane equipment,,, The coal is conveyed from, the bins to the boiler installations, by inerans of a for-- . carding-belt device? 2.5X1X 25X1X` Production 1nforants unable to give the capacity of the turbi.rxf generators. ,were engaged in foundation and construction :4ork A large part of the current is transmitted, to` the paper-cellulose factory (reportedly the. second largest factoryof: its hind in ~uropean Russia). The power plant also supplies the to,~ ' of hresnokarask. aa,th electricity, In additions' the plant supplies the paper factor ,pith steam and hot rooter, . . done b7, f'ersar iel. 25X1X The construction crear about 120 in number, 25X1X There were 30 speci,alistsJ 83 to 12 hours on sine la-shift projects,) :aa ur't;y' " Facto y g,~aard consists of militia in blue uni.formsfi Guard duty and ,rate control are carried out by Installation employees:a' Guard>`duty is stra.ct