KRASNOKAMSK POWER PLANT (TETS)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R007600240012-3
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
3
Document Creation Date:
December 14, 2016
Document Release Date:
February 8, 2002
Sequence Number:
12
Case Number:
Publication Date:
August 13, 1951
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 464.77 KB |
Body:
CENTRAL`. INTEL ,IGENCE,AGENCY RE 8 ' d;
TI REPORT CD N0,
WRY USSR (Molotov Oblast)
- -- - c+sac ?rInITI Kras oka ' ,k Power Plant z..(trE'I) ?.
Approy rke1ease 2002/08/08: CIA-RDP82-00457R?ff 68F2jM8t,% 3
=. ._, A. R 1 se : RjQ0JQ~' :j0*IA-RDP82-00457E
NC~a;
CENTRAL' INT:EL..IG NCE..AGENCY REPORT
1 IN I F I REPORT co*.
COUNTRY USSR (fitelotov Oblast)
= EGT Krasnokanv k Power Plant W'.k`S)
25X R4 \ `:''
-St I ?"
3,
l
!
ton in half. I~rasnokaf3k, k.50-O2PIv ,a~3 as
jtjvor, on the main road wi'iien runs in a rLS7 ~r1-~ws~,uua~ u~.a_v.,, >? ?,
leax ' `a otov and about ' 20 km
r r' b
'
yLie' pi.-KJUAU V J.GJtt b/J. vaav -Z>Y s -Steam (about 1 km,, south of the power rl r' - steam and. hot after are piped.
The steam and
bui:idings
tor
f
a
y
ac
an se jai Conduits into the paper
I i E?n 1.200 to 1.500 m tivest of the IGa.rtia
X34 C3} ;tt
vast by aorthoa;t from Kawan.:
fi `stor
underway chring the war,) The aid turbine `build ng
babl
y
struction was pro
was ;just finished and e 4u.1- rpa after 1945 _-It he construction-25X1A
of t new turbine building was still going on, and the a ssemb] ing ? of, the
f urbiries had begun, There are apparently no plans for other buildings.
Informant assumes the a quipu.ent was installed rnd that the 25X1 A
new turbines are in operation,
Management of construction and of the plant is in the hands of a civilian
.director of Jewish births Commissions composed partly of military persons
inspect the plant at infrequent intervals,,
'a,"dismantled German power plant or n.ew^ reparaT?1ons c~~~,a u~rt as n ~* jtrt~ti
m. i a modern German machinery, ap',;rently"either from
a, dQsCri .7t3.6n of tliC various installations follow'.
contains large hoi.Ler$ ror operaT,.i-oa v-L W I V :S W ;CAJ.W vua
. . .. - I- __ ... .,..w ..e, ov.a nna,ncxrr$.ed with
ApprovedFor. Relese 2002/08/08: -CIA-RD
NC 0 OF PAGES
DATE DISTF . 13 AU 51
NO. OF ENCLS.
(LISTED BELOW)
No C
h n ~ In2Clads.
j
4
024
Iyfass, 1 I UAW
Auth.: HR 70.2
.
25X1X
'T'f~aan orta: t'! 03
A spur leads from the coal bunkers to the main line 3h-canting
locomotives belorVri.ng, to the .Governme.nt'opaerra.ted railroad;,
'fir Release. 2002/08/08: CIA-RDP.8200457R00760O24O0
C NT'itAL INT.-,LLi.GuNC:, AG N CY
l,arg.e :rdll._ north: of and adjacent tol
-lies on the same road which passes the power plant
1 . across. from, the petroleum loading station,,
breaci.;bake?9 south of and adjacent
toad rah ch p saes thei power plant. area.,
2, Sketch of power plant area.
l :hot water pipe lines also extend into the toran, The steam pipe lines
have a diameter of epproxirnatoly lm,. The snitch installations are
located in the old power installation:, There i a h.iT h stone smoke
b? The new power installation, about 1120 x 35 m and 30 r n,. lies only
a fea =tern north of the old power installation..
construction of the ne:a building was about complete, and the installa-
tion of machine units was begun,, A large A unit as to be installed,
e,? The open transfgrnier installation lies in the southwest:-corner of the,
area and occupies a space about Eta x 30 m,
The garage,which measures approximately 40 x 6 in, is located near the
entrance on the north side of the installation area, There Is space .
for 10 to 15 trucks. Adjoining the garage to the aaest.ls a storage
area for building, nater:i: Is and boxes of ne installation e,uil~n Brat.
Various shops are located in smell. au diary kauin- including.the
forme, ,?,ijch lien north of the ne,-i po,.aer builda.n:, and the machine shwp,
rahLch lies in the ea.,stesrn port of the .Lnst,a.l_laati.on aria.
ff?,, Coal bunkers are north jest of thy; insteiiation area. Co,, %l cars are
unloaded by means of r:ioveablo bridge-crane equipment,,, The coal is
conveyed from, the bins to the boiler installations, by inerans of a for--
. carding-belt device?
2.5X1X
25X1X`
Production
1nforants unable to give the capacity of the turbi.rxf generators.
,were engaged in foundation and construction :4ork
A large part of the current is transmitted, to` the
paper-cellulose factory (reportedly the. second largest factoryof: its hind
in ~uropean Russia). The power plant also supplies the to,~ ' of hresnokarask.
aa,th electricity, In additions' the plant supplies the paper factor ,pith
steam and hot rooter,
. .
done b7,
f'ersar iel.
25X1X The construction crear about 120 in number,
25X1X There were 30 speci,alistsJ 83 to 12 hours on sine la-shift
projects,)
:aa ur't;y'
"
Facto y g,~aard consists of militia in blue uni.formsfi Guard duty and ,rate
control are carried out by Installation employees:a' Guard>`duty is stra.ct