CONSTRUCTION PROGRESS OF THE DANUBE-BLACK SEA CANAL PROJECT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R007600280006-6
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 15, 2016
Document Release Date:
April 29, 2004
Sequence Number:
6
Case Number:
Publication Date:
May 22, 1951
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 147.11 KB |
Body:
A Sf Wl ase , 07/08: CIA-RDP82-00457R007600280
ENTRAL INTELLIGENCE AGENCY REPORT
COUNTRY
CONFIDENTIAL
SUBJECT ,Construction Progress of t hit Danube-Black Sera
Canal Project
PLACE
ACQUIRED
DATE OF
INFO.
d8 vut rA?Swe a~Ydt'IPd S7M&1Sd RSS 01StSF@DG#Q OF' 'k~ ifffiW46~AS6R AGY e~'a
0, f#. C. 1R AB7D 2* A!1 GL ZWb f49 YYtAitIImume OR Th ft$9EGAYIOM
Womrimponwam.
25X1
25X1
25X1
DA-IE.DI,RTR, 22 MAY' 51
No, OF PAGE/~yS 1
NO. OF ENCL$
(LUSTED BELOW)
REPORT NO.
SUPPLEMENT TO
THIS IS UNEVALUATED INFORMATION
I the Danubea-Black Sea canal project is it ill
It
in its initial stages, and at the present rate of work it mill take at
least ten more years to complete this canal.. There are from 3000 to
)4,000 indi idua1s employed on this project at present, most of whom are
political prisoners or Rumanian soldiers who are considered non-
sympathetic to the regiaue0 Work is carried out haphazardly on the canal;
various areas are worked on, depths are dug at several levels, and there
are vast stretches .between work sites. Moot of the labor on this canal
Is done by hand; there are, however, a total of 7 ,9 500 horse-drawn carts
to transport the earth.
2,, in connection with the canal project, the Darnibo River port for Cernavoda
is no* under construction. This will form one terminus of the canal.
At present, excavation work along a two kilometer river front section is
being excavated. Earthworks have been erected to hold buck the Danube
River and the earth is being; moved to the rear in order to form a built-
up bank. This will be the port area, located just below the Cernavoda
railroad bridged
3e There are four Czech-made excavators in use on the port excavations as
well as 80 horse-drawn carts. A small narrow gauge railroad is also used
to remove the earth. No cement, has been poured anywhere along the canal.
ARMY AIRS ><
FORMATION PO CD NO,
25X1
---1-`Y,i
Bale:
Aaatit.: E1 78.2
~,~~- 1: ,-i al Ta: TS S (y 25X
tl Ia as x ins li s, U
I:i.~aset l?sb. 7
5C
srAi rNAVY r3sazs
Approved For Release 2004/07/08: CIA-RDP82-00457R0070280006