NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

RAILROAD AND ROAD BRIDGES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R007700510009-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
March 4, 2010
Sequence Number: 
9
Case Number: 
Publication Date: 
June 2, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R007700510009-9.pdf87.49 KB
Body: 
Sanitized Copy Approved for Release 2010/03/04: CIA-RDP82-00457R007700510009-9 CENT IJTELLIGENCE AGENCY REPORT INFORMATION REPORT CD NO. COUNTRY Poland SUBJECT Railroad and :toad Bridges PLACE ACQUIRED DATE OF INFO. THIS DOCU7tENT CONTAIES ItiFORWAYIOD AFPPCS1118 TUN DATIOSAL DENERSf: OH' Yaw viHITED STATES WITHIN THEUSAWWNS OF THE ESPIO iAGE ACQ SO IL H. C. SI AUD ES. AS AU8[ICISD. ITS TOASOSDISSIGN One TEir REVELATt011: OF ITS CONTENTS IS ANY TANNER TO AD DFIAUTHORIEED P2 85M IS Y'R~s? 1. The railway bridge over the Vistula River at Tczew (Q55fD59) rthich was damaged during; the war has been temporarily repaired, but is still cak. Trains cross at a m imum speed of five I~mf hour0 There is only one track, the other having; been dismantled and removed by the Russians. The bridge is of riveted steel construction, 2.5 to 3 Ion. long; it rests on{ nine pillars, seven of, concrete and bricks, and two of steel on 'wooden pile4'. It is 25 m. above.water-level ~. I W 25X1 2. The road bridge over the Vistula river at Tczew was also dams d during the war. A wooden construction approximately 40 meters in length joins the aforementioned railway bridge and serves as a by-pass for vehicle and pedes- t~rian traffic transferring to the existing part of the old road bridge. 3. The main road betieen Chojnice and Krolezviec (Konigsberg), built by the Ger._iaris during the war, runs at a distance of approximately five knio south of Tczew and crosses the Vistula at Kxgbawa. The Germaps destroyed two pillars of this bridge daring their retreat. The bridge was rebuilt,to its original form in 1950. It is a tivide, concrete construction, 25 meters above water-levels and has nine spans. An iron railing 1.2 peters high runs on ~.. each side of the bridge. CO- 4 li ELLUFAX 13 DATE DISTR. 2 51 NO. OF PAGES 1 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO. Class. c f 81 ` d+ i . Muth.: h 70.2 Dcr.uyT;ent Nn. ~crr No Q Date: THIS IS UNEVALUATED INFORMATION Sanitized Copy Approved for Release 2010/03/04: CIA-RDP82-00457R007700510009-9