FIVE-YEAR PLAN FOR RAILWAY CONSTRUCTION OF RBD SCHWERIN
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R007700660001-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
March 8, 2010
Sequence Number:
1
Case Number:
Publication Date:
June 2, 1951
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 107.43 KB |
Body:
Sanitized Copy Approved for Release 2010/03/08: CIA-RDP82-00457R007700660001-1
CENTRAL INTELLIGENCE AGENCY REPORT
VF R ATIO REPORT
COUNTRY Gersuary (flu: sign Zone)
SUBJECT Five Year Plan for ?ailrray Conetructia
of 3D Schwerin
PLACE
ACQUIRED
DATE OF
INFO.
131t3 DCCUUMIT COMTAIL I RPOHMATION AFF6&'t7QGYUC ATSOAALOMPgRZff
OP THE BKSTED SYATEA BSITIRW TIIQ 6IBAPoI11O U! TUB ECPIOMAQE ACT E4
D. S. C.. At AND $A. AS AMENDED. STO TRA3093nVIOfl 0Q Tile QGVQLATtO>
OF ITS CO&TEITS 9II AEY 0AWIjeft TO All GdAG'tRoRIX l PCR30A IS PQOL
nom a ev LAR. aZPDODDCTIOt OF "is ?OT is Peom017RD.
42 freight cars
U pas cug r cars
3 diesel train cars
2 freight train locomotives
1 diesel locomotive in the 03 series
1 switch engine
CLASSIFICATION `+ 'T"/CONTROL - U.S. OFFICIALS ONLY
STATE NAVY
NSRIBUTION
t RQ , T
ARMY _ A!R
Document No. ___I
No Chang 11,
CD NO.
DATE DISTR. 2 5.
NO. OF PAGES 2
NO. OF ENCLS.
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
25X1
V4I
The Five Year plan for the :1ittenbcrg area of iii Schrerin sets the following
goals for the railways:
a. The laying of 152 kilometers of track. This does not include rebuilding
the second tracks (on double-track lines) which were dismantled.
b. The repair of 320 ldlometcrs of track.
c. The construction of new rolling stock is to include 34 locomotives, 118
passenger cars, 7,800 freight car:.*
do The increase of railway cargoes to 6,I1.}0 freight car loads per day.
e., The reduction of round-trip time for freight cars in the Soviet Zone to
34 days per car.
2. For Bad Kleinan the Five Year plan calls for the completion of three new tracks
at the rail-way station, each with 240--car capacity. There ax-c to be six new
switch-tracks at the station. Six of these are to be sidetracks at crossings.
.3. The present track on t.'-,o interzone rail line from Berlin to Hamburg has a
sharp curve at Uag:enao Land. A new track is to be laid to eliminate this curve.
4;.. The following rolling stock was taken out of operation in the Schwerin area
between 1 and 10 February because of frequent difficulty with hot-boxes.,
The cars will be out of operation until V.-Ley have been thoroughly overhauled.
They include the following number of cars and locomotive :
Sanitized Copy Approved for Release 2010/03/08: CIA-RDP82-00457R007700660001-1
Date: JuL.3~7 __ By
0 Declasali',.
Class. Changed Tc. IS
Muth.: HR 70.2
25X1
Sanitized Copy Approved for Release 2010/03/08: CIA-RDP82-00457R007700660001-1
SEC!WT/0O1TE''RdL - 11.5. OFFICIALS OW LY
G,'ET~1$ L TE'LIt NCE AGEN ''
Comment:
Year 1 n far ' lio entire Soviet Zone calls for the construction of 200 r r
locomotives, i.;000 new passenger cars and 40,00C) new freight cars.
Z.C T/C011TROL -. U.S. OFFIC LtLS ONLY