SOVIET ACTIVITY ALONG THE IRANIAN BORDER

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R007800890004-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
18
Document Creation Date: 
December 27, 2016
Document Release Date: 
November 12, 2013
Sequence Number: 
4
Case Number: 
Publication Date: 
September 27, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R007800890004-2.pdf1.36 MB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDI;82-00457R007800890004-2 flAsH CENTRAL iNIELLIGENCE AGENCY REPC INTELLOFAI 4 ',J6R/Iran INFORMATION REPORT SUBJECT S-...viet Activity along the Iranian Border PLE ACQUIREL DAP: OF INFO. CD NO. DATE DSR. 27 SEP 51 NO, OF PAGES 38 NO. OF ENCLS. MISTED an.ovo SUPPLEMENT TO REPORT NO. merqr.:, rv7:,;.!?:-,. 50X1 50X1-HUM TFOIS DOCDDIENT CC. ',A ne InTeRNAT102t.VFISCTIVOTrIll DA71CP3r.l. veva:sr OF TIM 9391VIDD FTA. t. VIVI IN 7EI6 1:17.ATIGIG OF rnlz ESPIODAOD ACT 55 U. S. C.. 59 ADD n2. A I nromlal.I11:36171SMIS990:1 OD TIDT EANDLAT1011 OF IFS COUTENTS ita vtaltann TO An nuAurnoutzto PeD3011 9/* pero- SiiIiTICD tor LL., IL CM:IC.110N OF MI5 FOCE! I mamma THIS IS UNEVALUATEr INFORMATICO.: 4 41 ALILJW' 50X1-HUM A defailsdreport of Soviet activity along the Ir:Inian borer for the period 1.8 May' to 1 June 1951 follows. 50X1-HUM 1, Pol DaEht., 20-21 1;,,,y - Westbound rail traffic, Nakh' Five trains composed of 31 p, 39 carloads of sand, one car seven coal cars, 14 carloads three carloads of timbers, o 68 cars carrying doors(sic). Eastbound rail traffic, Yere, Four trains composed of 30 coal cars, one carload of etc two carloads of motors, one f! tion boxes,. and 81 closed car _chevan to Yerevan: ,ssonger cars, oad of soldiers, of armored cars, tank car, and an to Nakhichevan ssenger cars, five -ne, one tank car, ?arload of ammuni- so night - Eastbound rail traffic, Yerel! Three trains of unknown make- This document is hereby regraded to CONFIDENTIAL in acco:thnce with the letter of 16 October 1973 from the Director of Central intelligence to the Archivist of the United States. Next Review Date: 2008 I. Westbound rail traffic, Dzhul An unstated number of trains cars carrying mortars, three tion boxes, one car carrying tank oars, and 40 closed car Eastbound rail traffic, Nakhi Two trains composed of one pa. tank cars, and three cars lot. A black twin-englne fighter Nakhichevan to Shah Takhti, araa village (not located). an to Nakhichevan: up, fa to Nakhichevan: composed of two carloads of ammuni- an engine, three :thevan to Dzhulfag 3senger car, three ied with tractors, 1,rf7raft flew from ld landed at 'CLASSIFICATION 40011110VcoNTRo1, US OFFICIALS ONLY # WAD .I 1 DISTRIBUTION R FBI r f ? Document No. No Change H?11):2,? Class. C.:. Auth.: L Date: __ ' Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 50X1 50X1 Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 22 )asht continued- 'Nay Jlay CENTRAL INTELLIGENCE AGENY. Westbound rail traffic, Nakhichovan to Yerevan. Three trains composed of 15 passenger cars, three tu.2Y, cars, one carload of wooden posts, 60 closed cars, and 14 gondolas, among which were observed two autos, three 75 mm :Luns, two car- loads.of ammunition, and eight carloads of coal Eastbound rail traffic, Yerevan o akhichevari Two trains composed of 15 passenger cars, four tank cars, one coal, car, and '?3C closed oars. Westbound rail traffic, Dzhulfa Nakhichevan Two trains composed of 15 passener on's; four tank cars, one carload of coal, one carload of tractoPs, three ,arloads of w000en posts, one car carrying an anti-aircraft ma':hine gun, four tank cars, and '30 boxcars.. Eastbound rail. taffic Nakhiche7an to Dzhulfa Two trains composed of 15 passener cars, one carload of lumber, and 27 empty itesttound rail traffic. Nakhichetan to Yerevan Fiie trains composed of 30 passeicer cars, 14 coal cars, three arloads of brit:ks, two cars carrying ten automobile engines, two Larloads of. sand, one carload of lime, 75 closed cars, two tank fl.a;7s, six carloads of poles and lumber, and three carloads of iron. Eastbound rail. traffic. Yerevan t Five trains composed of 31 passe closed oars, 20 tank cars, three lumber, five carloads of posts, one carload of ammunition cases, carrying 13 guns, and three carl. mobile engines, .o Nakhichevan: -Ear cars, 107 carloads of li iree coal CarS, three ars ')ads of auto- stbound rail traffic, Dzhulfa o Nakhichevan: Four trains composed of 16 passeHger :ars, one coal car, three carloads of posts, seven car- loads of wheat-mills (sic), one ?_arload of cases 14 carloads of lumber, 12 carloacs of trucks, and 86 closed cars Eastbound rail (inc train comi? fo,..6tbound rail Two trains COMF carloads of out two coal cars, closed cars.. traffic, Nakhichevan to Dzhulfa. osed of 15 passenor cars traffic, ttaknione'ian to Yerevan! Used of 15 passenev oars, 25 os, three ,iJa.rload of iron roos? one carload of sard, and 17 Lastbound rail traffic, Yerevan Four traias composed of five car and lumber, one carload of ammun_ tank cars, 67 closed cars, 16 pa two carloads of saddles, three 19 :.arloads of jees, anu seven ivestbounO rail traffic Dzhulfa Two 'trains composed of 15 passenv :ars, two carloads of lumber ,r anfunition c7ases, and 16-.71ooc Eastbound rail traffic, Nakhiche,, Two trains of unknown make-up. .1O4TRCL US CITICLIJ., LNLY U Nakhichevan cads of poles Lion, sixteen seliger cars 1-lads of stone, arJoads of coal:1, o Nakhichevan: er ,w)rs, nine one carload 1 ars. an to bzhulfa: 50X1 50X1-HUN 50X1-HUN Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 400100* Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 ta6NThid, INTi,411IGLNUe. IX,1\4CX cow.inued- ti?ty 27 lkitay 28 Itay 29 Wy kestbound rail traffic, Nakniclievan ta Yerevan Two trains composed of sixteen passenger cars, four coal cars,- four tank cars one carload of iron cases, and 26 closed cars. Eastbound rail traffic, Yerevan to Nakhichevan Two trains composed of two caroads of stone, two coal cars, 65 closed cars, and 15 passenger cars. Vestbound rail traffic, Dzhulfa to Nakhichevan Two trains composed of 15 passenger cars, three coal cars, two carloads of posts, 21 cars carry- ing 21 trucks, and 23 closed cars Eastboundrail traMc, Nakhichevan to Dzhulfa Two trains composed of three carloads of iron, two cars carryin two electric motors, five tank cars, and 30 closed cars Eastbound rail traffic, Yereva to Nakhichevan Two trains composed of 14 pass,mger cars, five carloads of ammunition boxes, four carloads of barbed wire, 11 tank cars, and 21 closed ,cars? 'westbound rail traffic., Nakhichevan to Yerevan One train, composed of 16 pass'E:nger cars, 6estbound rail traffiv, Dzhulf to Nakhichevan An unstated number of trains cmposed of 12 coal cars, eight .arloads of c:ses, one car- load of wire and one truck, ant.. 12 closed cars t;astbound rail traffic, Nakbicevan to DOlulfa4 One train composed of one passenger car,. 27 empty ears, and four closed cas; one train of unknown make-up, iiestbound rail traffic, Nakhichevan to Yerevan Three trains composed of 16 passenger cars, six tank cars, one carload of auto, two carloads of iron rods, two carloads of lumber, and 25 closed cars. Eastbound rail traffic, Yerevai. to Nakhichevan Three trains composed. of two carloads of ammuni- tion boxes, one coal car, two cars carrying six 75 mm puns, six carloads of pcAs, 16 passenger ? cars and $2 closed cars, 'estbound rail traffic, D::hulf. to Nakhichevan Two trains composed of four ca,:s carrying four autos, 28 closed cars, and 15 rassenger cars Eastbound rail traffic, NakhicLevon to Dzhulfa One train composed of eight tall< cars, 17 passenger cars, and 16 closed ars; one train of unknown make-up. iiiestbound rail traffic, Nakhiaevan to Yerevan. Two trains composed of 15 passenger cars, five carloads af lumber, one carloa of ammunition cases, and 28 closed cars, Lastb:Jund rail traffic, Y.ereva to Nakhichevan Two trnins comrosed of 14 f.pinger cars. eih ,arioa,.is of atoSW, three cxa. and 20 cio%('0. ccxr.s, 41111111110DONTROL US OFFICIALS ONLY 50X1 50X1-HUN Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 4111111WIL:;,!\aa_ 1,!? Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 INTELL1GL;NC 6naNCY 50X1 - a aaann corannued- a 1";ay night a n t.ay es bound rail traffic, EaLhul:a to Nakhichevaw One train compose of six 'carloads of posts, tbo carloads of lumber, three aoal tars, one carload of autos, one 2ar1oad of ammunition casea, seven tank ca,rs, 20 closed cars; one train of unknown make-up. Eastbound rail traffic, Nakhiahevan to Dzhulfa: One train of unknown make-up. Westbound rail traffic, Nakhiahevan.to Yerevan: Five trains composed of 15 pansenger cars, 11 tank cars, sir carloads' of bricks, four carloads of sand, six carloads of wood. four coal cars, one car carrying an engine, oae aar narrying ammunition, two carloads of paanks aria lumber and 43 closed alro Westbound rail traffic. Nakhianevan to Yerevan; One train of unknown make-up Eastbound rail trar'ic, Yeratn4n to Nakhichevan: Five trains composcai of 30 passenger cars, two carloaa;, of armed soldiers, :a) carloads of stones, three cars carrying stones (an;n three cars carrying 15.enninss, one carload of szad, one carload of ammunition, two cars carrying autos. and 12 closed cars. aostbound nail traffic, Inahula to Nakhinhevan Five trains composed of 16 paasenger nays, 14 carloads of soldiers, one narload of bricks, three oars carrying three truaks (each truck carried one .gun), eight rarloacts of planks, three coal ears, four aarloada of lumber, one tank car, and 19 closed aars,. Direction not stated: passenger oars and 14 Direction not stated make-up, Two traina composed of 14 carload of soldiers, Three nrains of unknown aestbound rail traffic Nakhi heian to Yerevan; Two trains coaaposed of ten ta k cars, ten cars carrying wood-nutting machinf?; five cars carry- ing tractors, 82 coal cars, 2 closed cars, 15 rarloads of lumber, two aars arrying anti- aircraft machine puns, and on passenger car taStbound rail traffic. Yerev.n to Nakhichevan> Two trains composed of one ta .k car, 23 passenger cars, 17 closed cars, and fly armed (sic) cars. Aestbound rail traffic, Dzhulaa to Nakhichevam Two trains composed of 15 pasnenaerncars with armed soldiers standing.at th car doors, three carloads of planks, one coal -ar, two cars carrying tractors, 23 cars carrying armed soldiers, and an unstated number of car n carrying two autos and one jeep, 'aeatbound rail traffic, Baku .c) Dzhuifa; One train of 30 cars ana la gorido as pulled by I?anamativaaa ANOMMNYCOnThOL UL CFF1Claln LNLY 50X1-HUNI Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 AMMONWr.;WTLL,L HL; "!;'; Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 Dhdifa continued- nidht aj versio/ aiOt 2?-2'4 Ray CENTafr.1, INTELLIGENCE AGENCY: destd::ound rail traffi, Ordubdd to Dzhulfa and Nakhichevan No train :omposed of two passenger ears, 41 boxcars, add 19 gondolas carrying 26 autos and lumber. Eastbound rail traffic, Nakhidievan to Dzhulfad One train composed of seven bdxcars, 20 tank cars, and three gondolas, Diredtion unstated, Five trans of unknown make-4, Westbound rail traffic, Ordubd Nakhichevand Five trains domd boxcars, seven tank cars, and in five trucks, two jeeps, td coal, and lumber, d to Dzhulfa and osed of 145 eight cars carry- -a armored cars, Eastbound rail traffic, Nakhi Ordubad: One train eomposed d tank cars, and three coal card., bound. rail traffic Nakhid Ordubad Six trains of unknol' 250X1 hevan to Dzhulfa and f 14 boxcar, three ; four p.w.lsengertrains, devan to Dzhulfa and a make-upd hestbound road traffie. Ordub&J. to Dzhulfa and Nakhichevand Sixty-six truck carrying 41 soldiers, earth, lumber, and y)odt.. Eastbound road traffic. Naknivlevan to Dzhulfa and Ordubad; 3ixty-seven trus carrying bricks and sand, Westbound rail traffic, Ordubad to Dzhulfa and Nakhichevan: Five trains.comdosed of 135 box,- cars, and. 150 gondolas carryid wood, lumber, and coal, Eastbound rail traffic. Nakhi-: and Ordubath Two trans comp: cars,?ten cars loaded with trd loads of wood, 21 empty cars, ears; four passenger trains oY: two troop trains, number of eight other trains. levan to Dzhulfa led of 67 bax- Acs, two car - Ind two tank unknown make-up, not stated; One train composed of six carldade of cement, totaling 302 tons,. and four erdty cars went from Soviet Dzhulfa to Iranian Dzhulfa. Eastbound. road traffic, Nakhio,levan to Dzhulfa and Ordubad: Seven jeeps and 9 trucks carrying 100 armed soldiers, lumber, and stone. ffestbound road traffic, Ordubad to Dzhulfa and Nakhichevan; Three autos and 4 trucks carry- ing 40 unarmed soldiers, earth. bricks, and coal. 'eotbound rail traffic, Orduba Ned.chiohevan Two trains comp.; f..)77 tank car, ard 28 7,ondolas tdicks and seven were loaded d bound rail traffic, Nakhfo, Ordubari! Two train crn Cti, and ld gondolas loaded dedls two dassenger n dc. stated; rile other trains up, .111.11111;CIITR,C,,_ US OF_FICIAL3 ONLY Dzhulfa and 50X1 -HUM ed of 27 boxcars, )f hich 21 carried th sand evan to Dzhulfa ed df 1 tank th earth and c,bflr of dar5 f unknown make- 50X1 -HUN Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 4111101.110C.tin-CL Us Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 CLUITE.AL J-GenzE, AGNCY 50X1 iulfa continued- night 2127 Nay -30 May Eastbound road traffic, Nakhichevan to Dzhulfan - Thirty-six trucks, tneoe autos, seven jeeps, to metorcycles, one medium tank 15 soldiers, nestbound road traric, DzhuLfa to Nakhichevang Thirty-one %ruck& carrying L soldiers. Les:bound rail traffic, Ordutad to Dzhulfa and Nahnichevang One train ompoeed of 39 gondolas nArrying earth, lumber, hood, coal, and wooden ;ases, and six tank cars eastbound rail traffic, hakhichevan to Dzhulfa ,nd Ordubadg One train composed of nine box- ars, three gondolas careying coal and lumber, nad two tank ears, Two passenger trains travdec; according to schedule Eastbound rail traffic, N kh'ohevan to Dzhulfa and Ordubadt Three train o' unknown make-uk Eastbound road traffic, 'akh chevan to Dzhulfa Ind Ordubath Twenty-nino trt;eks, five autos, Tad five jeeps; three of he trucks carried 24 civilians, and the rema_nner of the trucks were covered? Westbound nnr.c traffic, Orde Nakhichevan; Four .trucks .c 27 covered trucks Eastbound rail traffic, Dzhu Aire trains composed of 41 1 gondolas loaded With ntoncs; trains, number of cars unstat of unknown make-up E-d to Dzhulfa and lying 40 Civilians; 'z to Ordubad: nInars and five passenger three trains Westbound rail traffic, Ord iead to Dzhulfag Two trains composed of 23 bnKcars, and 55 gondolas loaded with coal, _umber, and. stone. Vvestbeund rail traffic, Csru.nad to Dzhulfa and Nakhichevang Four trains n)-posed of 15-box-- cars, two tank care, and 39 condolas?of which six carried trucks and 33 17e loaded with stone and coal Eastbound rail traffic, Nakhionvnn Dzhulfa and Ordubad: Cne train composed ef t,n boxcars and four empty gondolas; Destination unstated; Four eassen-er e and six other trains, all of unknown _ake-up Ytestbound road traffic, Ordioad to )zhulfa and Nakhichevan: Sixty-six truf'cs, twn jeeps, 'nve; motorcycles carrying seventy-seven soldiers, lumber, stone, and earth; Li cee trunks Eastbound road traffic, Naknichevan to Dz'nulfa and Ordubadg Six jeeps, two motorcycles, and 79 trucks carrying 110 soldiers. One truck pulling a 105 mm artillery piece went from Qapchi border- post towaro Ordubad; One truck pulling a gun of unstated caliber went from Baiji (net located) to Dzhulfa., 40,1111000NTROL US OFFICIALS CNLY 50X1-HUM 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 CENThaL INTELLIGENCE AGENCY .- OZDUITa aontinued- Uay (a:rtarnate version) Sicaaud May 2- May 4eatbound rail traffia, Ordubad to Dzhulfa and Nakilichevan; Two trains composed of 31 boxcars, two carloads of wood andlumber, and one tank car, Eastbound rail traffic, Nakhichevan to Ordubad. Three trains composed or 14 bo:ruars, 12 gondolas carrying 14 autos, and five goadolas with unknown loads Direction Un ted Two passeager trains, number of cars unstated. nicht Direction unstaLed: Two train of unknown make-up. estbound road traffic, Ordubad to Dzhulra and Nakhirhevan: Fifty-nine trucks carrying 22 unarmed soldiers and one field piece. Eaatboand.road traffic, Nakhia;2evan to Dzhulfa; Fifty trucks carrying 70 armed aoldiers,. Fifty-three offiaers and 29 so]diars were observed digging trenches opposite the Ahmedabad post. night Searchlights east of Dzhalfa ware played on the railway bridge at Dzhuifaa itostbound rail traffia, Ordubaa to Ozhulfa and Nakhichevana Four trains com.posed,of 81 boxcars, 15. tank oars, 51 gondolaa, 15 aarloads of autos, and two aarloada of barrels. Eastbound rail traffic, Nakhicnevan to Dzhulfa and Ordubada One train aomansaci of 19 boxcars and 30 aarloads of stone.. Two passenger trains moved aacarding to sahedule, but the schedule Ulnas., number of cars, and direction of travel were unstated, night Direction unstated Six trains of unknown make-up. Eastbound road traffic, Dzhulfa. ta Ordubath Two armored cars carrying ten aoldiers. *aaatbound road traffic, Nakhichavan to Uzhulfa; sixty trucks carrying 56 soldiers and ten women. Westbound road. traffic, Ordubad to Dzhulfa and Nakhichevan: Fifty trucks carrying 20 soldiers and ten women, estbound rail traffic. Baku tc Dzhulfa; Five trains composed of 28 passenger cars, 84 covered .ars) four tank cars, and 49 Eastbound rail traffic, Dzhatla to Baku Five trains composed of 28 passenger cars, 79 covered aara, twelve tank aars, and 15 gondolas loaded with bricks and stone,. eatbouno rail traffic, Baku ta DMiulfa Five t!-.11;; r)M1/Y-,Q(3 or d pasti-7':L. cuvareci ,.7ars, gondolas (arryul.r. Len trucks, 21 ?iumber, and roal, anj four tank aars, 41111111111111111CONTROL LLo OFFICIaLa ONLY 50X1 50X1 -HUM 50X1 -HUM Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 ud aontinued- aCa, 1NTELLI.G,ZICE aGe,NCY Eaaebaund rail traffic. Uzhulfa to Baku' Four trains ccmi'osed of 28 paaeenger cars, 77 covered cars, three tank cars, and six gondolac, Westbound rail traffic, Baku to Dzhulfa: Three trains composed oE 14 paeaenger cars, baxaars, seven tank cars, and .3 gondol aa loaded with lumber and wooden jolaaa Eastbound rail traffic, Dzhulfa to Bakua Two trains composed of 15 passenger aars, 23 boxcars, one tank car, and five gondolas loaded with tins. Westbound rail traffic, Baku fa Dzhulfa: Two trains eomposed of 14 passenpel cars, eight covered cars, one tank car, 21 .gondolas 'loaded with trucks, and four gondolas loaded with coal, }....asthound rail traffic, Dzhulf,, to Baku; Two trains composed or 14 passenger cars, 37 aavered cars, eight tank cars, and s4:x Westund rail trafric. Baku te Dzhulfa: Three trains composed of 15 .assenaer aars, 23 covered cars, three tank cers, and 52 :,)ndolas loaded with two trucks, coal, lumber, iron pipes. Lastbound rail traffic, Dzhulfa to Baku Two trains composed of 1.5 i,assenper cars, 36 covered ears, and la") gondolas loaded wf:.11 gravel, zk,viet soiaiers con'auctad rific and machine gun firinL practice at the border 1 st- of Ordubac, westboana rail traffic, Uaku ta Dzaulfaa Three trains. comaosed of J5 iaaaenger coveraa cars, seven tank ear, no. 26 gondolas carrylap three ;:xucks, lumber, ;rid coal iaastbound rai1 traffic, lizhulfa to Baku; Three trains composed of 24 covered cirs, four gondolas, and one Lank car, soviet soldiers conducted rirle and machina gun firina practice at the border 1.ast of Orduhad, estbound rail traffic, Baku to Dzhulfa Three trains composed of 14 passenger cars, 28 covered aars, four cars carrying trucks, four carloads of motors, eight carloads of wa'er pipes, two Lank cars, and 13 carloads of eerth, coal, and gravel_ Eastbound rail traffic, Dzhulfa to Baku; One train composed of 14 passenger -ars, aestbound rail traffic, Baku to Dzhulfa: Nine trains composed of 27 passenger cars, 76 boxcars, tan tank cars, and 100 gondolas among ehich were observed 14. autos, iaaatbound rail traffic, lazhulfa to Baku: Three ')ins composed of 28 passenger ,:ars, 17 boxcars aaa4 aendclai AllommilittioL 1.4 44.F.41Gla14 ONLY -8- 50X1 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 AMMEmmilrr.NTQr1 nyplo.T lo Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 CEETHAL INTELLIGZCE AGNCY 27;? ? 2r ? tay .ontinued- Afarin May Viay e?sfbound rail traffi, Baku to Dzhulfa; Four trains cor4-osed of 24 co,-erod cars, 14 jaaeiger..ars, 35 tank cars, and 24 gondolas loadcd with one auto, four trucks, and lumber. Eastbound rail traffic, Dzhulja to Baku One train copiposed of. 14 passenger ear V,estbound rail traffic, Baku o Dzhulfa; Five trains composed of 125 boxoam, J5 tank cars, and 64 gondolas carrying trucks, barrels, and coal.. Eastbound rail traffic, Dzhulla to Baku Six trains composed of 45 passenvr ..ars, 98 boxcars, 36 tank cars, and 37 gondolas Eastbound rail traffic, Dzhul:a. to Baku; Four trains composed of 28 passengr ,ars, 44 boxcars, 12 gondolas, and six tank aestbound rail traffics Baku Dzhulfa; Four trains composed of 95 boxcars 38 gondolas loaded with seven trucks, two arr,ored cars 12 of the gondolas were bade' wAth wood and iron rods; 15 tank cars; one .ocomotive On 23 ii;ay, all of the inhabit.-its of th::: border villages adjacent to the. Araxs li'ver moved from their winter residences to surrie-J- resi,Aences located on the southt2astrn e:.evaLions of Aleybax ricst located). Th3 1i-is :--:.k alrianied the villagers on the'move.. Eastbound rail traffic, Dzhulfa o Baku; Two trains comT,osed of 12 boxf,ars: four tank cars, 24 emfty gondolas, one carload of stone, and 14 passenger cars. estbouno rail traffi-,2, Baku t.D huifa Two train omposed of 25 boxcars. laud ),2 gondolas loaded with wood, poles, tooL and coal, Eastbound rail traffl Uzhulfi to. Baku; Two trains composed of Len boxcars, 13 emity gondolas, one tank car, and 14 passencer cars, 'aestbound rail traffic, Baku to Dzhulfa; One train Composed of 16 boxcars, four tank cars, and 21 gondolas carrying wood, iron rods,' and sand, i-A.stbound rail traffic, Dzhulfa to Baku; Three trains composed of 32 roofed irs ten passenger cars, nine tank cars, eleven gAldolas, one car- load of insecticide, and ten cpty cars, ,:estbound rail traffic, BaAu t-) Dzhulfa; One train composed of 17 boxcars, one tank car, 24 ,-ondolas loaded with desks And chairs, two 9..or,dClas loaded with machinery. raving eralip- xent, and instruments, three carloads or cases, and woocsn .ea! bound rail Lraffic, buku t i;ihulfa Two Lryins comr..osed or 13 tanii. car';, 42 gondolas loaded with coal and wocd, si oarloaos Of ;417,010t(p Fd.WS, four empty cars, and one carload of e(-uipment (Lyle of ecuicmen not stated) AMMOMMOCUNT4W. 50X1 FtIV1 1_1111%4 50X1-HUN -9- Declassified in Part - Sanitized Copy Approved for Release 2013/11/12: CIA-RDP82-00457R007800890004-2 Declassified in Part - Sanitized Copy Approved for Release 2013/11/12 : CIA-RDP82-00457R007800890004-2 ? CENThAL INTLLIG.INCE AGNCY' Khua Afarin continued- .