1. URANIUM PRODUCTION AT BUHOVO 2. AIRFIELDS AT BALCHIK AND YAMBOL

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R008000780011-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 20, 2016
Document Release Date: 
December 6, 2005
Sequence Number: 
11
Case Number: 
Publication Date: 
July 5, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R008000780011-0.pdf100.03 KB
Body: 
f CLASSIFICATION S LT/CONTROL .. U.S. OFFICIALS ONLY CENTRAL INTELLIGENCE AGENCY REPORT NO. INFORMATION REPORT CD NO. Approved For Release 2006/ 3: CIA DP o 7 I 0D78OO11-0 COUNTRY Bulgaria SUBJECT 1. Uranium Production at Buhovo 2. Airfields at Baiehik and Y nbol PLACE ACQUIRED DAVE OF INFO 47178 OOCEIUSUT CO37(M 3 WFOWAAs*Ou APPSSC45f7OTH8 HATIOPSALflfFStr3 OF SHE OLHTSD STATfl V,'jWjN THfd 7a6AS77oo of 4576 C3PSOA0533 AC7: 50 591.43, C., 79! ASSFD P2. A3 AU0fiOf D. STD TBAf7SHISS!Off 00 VIE 121SV-.6A470U 57F 1551 COMM SH A47T VA00P.U TO AU UDAUTROM130 P0fl OU 53 PSSQ UYD1TEU BV LAtM. E3m'oa00C45&H OF TBfQ FORM IS PROM WEEP. DATE DISTR. 5 July 1951 NO. OF PAGES 1 NO. OF ENCLS. SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION OSL 25X1 tteer c9 THE FOLLOW INO REPORT 11 L 11 ABY el cr 11 cr BISIRIBUTEO AS " CIA PRE C c~ 9+15 ElItiil~Tl"M ~IIIIVIBPRED rchivr f r h F: x et Review ex are three operating units located a es a s Goten and Borcha sic) o 2,, At the Seelavtsi mine 850 men working in three shifts produce about 120 tons daily. The ore from this shaft is black in color. 3. The ore from all mines is graded at each shaft by Soviet personnel with O~higer counters. Three grades of ore were extracted until 41.0 June when an extensive vein of "extra" grade ore was hit at the Goten mine, which has now become the largest operation at Buhovo. The Goten ore is a dull reddish color. 4o the entire output of all operations at Buhovo at 2$0 tons daily. 25X1 5. _SWe new heavy bomber runway is Z,,300 meters long meters wide. The finishing date is scheduled for 1. September 1951. taxiways from the main runway to the hangars. The runway is 2,800 meters long and 80 meters wide. STATE x NAW# x NSRB DISTRIBUTION F91 ARW # x Air # F;t- x I I I I - - -I- I - -d CLASSIFICATION