(SANITIZED)ELECTRICAL AND WIRELESS ENGINEERING CONCERNS(SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R009300280003-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
6
Document Creation Date:
December 22, 2016
Document Release Date:
June 1, 2011
Sequence Number:
3
Case Number:
Publication Date:
December 1, 1951
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 587.23 KB |
Body:
----- ------
Sanitized Copy Approved for Release 2011/06/01 : CIA-RDP82-00457R009300280003-3
COUI'''r`'w
SUBJECT
PLACE
ACQUIRED
DATE OF
INFO.
11 AGEJ$CY
1 OR 71O E O ''
Alec c3 'd Uiroless Engineering
"a oommew t t+' amts JosiA'n* a- ft 1tP@;m sAtioma4 oammor
ark w"TIO smrta?Pal p .-*7 T064A"$PIo 6 am 7u
ow ns am=" ar an ' di...? wMVw mum
sus rn aL actira~ r r is rama"en_
o2a ctric^1 any trireless enginecr3nc concerns.
1. R Re ehre ; T RFT) aeuhnus gm Renznreg Thurinngi;
50X1-HUM
The test shop w"s reported crrrble of delivering "0,(00 tubes. in A^r1l9 thereby
exceeIiin the total trrgnt figure. However, it urould not bo possible to nc'et
the t't3'Vt for soTM^ types of tubes. The follouin; bottlenecks existed:
a. 'Tv ' Ceo try" of ty,e. TtL 21 and ZCL 11 vas not P
~yai1 t,le,.
b. There was much ro'-ai.r tror'c to be `.One in the test ep. The tubc mounts
aepartrcnt had corpleted its rer.^.;rs and would be ^ ale to nodal the
teat shop as of 26 April.
c. The asscnbly ionm.rtnent wm.s a:isc' b1inj 170r, tubas of types ECL/JCL ll 6,~i1,y?
This figure lust br incrertsen to
50X1-HUM
50X1-HUM
the'-.raw nateriaals sttw t4on I 150X1-HUM
R. Glass bulbs: elssw .sser (1) suirn liod only l.? ~ := 300 bulbs airing 1 by,
in&te d of the i romis3ed 1,,'Ur),Ct'1O. Iisn-revery the firri had r read to sups lij
l v47r,,000 in June.
b. 'alectrote crtps: stoc='s on hand or `x"-ecie i tro-t1 cto.'''ice for 3uce an OFFICIt4TIS ONLY
TION
CENV~AL ?.INTELLIGENCE AGENCY
-3-
I:.rgot for
Target for
I
of instrument
2nd usarter 51
Si
n .
M
n
Components for
teleco unications
equipment
288,!004
180,000
Special accessories
303,1000
101,202
Repairs
1,000
334
Work on contract
1,000#
309350
Carrier frequency telecommunications equipment
e.~rodu....ction
on or !!,-)r Znd-qlatw-tor
99o730
"05,044
48#480
771,570
1,071
14071
26,322
66,821
32 sets were completed in June. The planned target was 100 sand the delivery
target allowine, for the shortages of 0-cores, was 25. - The delivery target
f + J y was 100 sets. Tzar., ,slivery pl-in for the second quarter E-a.a ;i:onded
Information concerning Poland is Leipzig.
Fair enquiry concerning the delivery of 1
has not yet been' passed on to the factory
Items being made by ENT(0 (Entwicklung and Konstruktionsb5ro )
had been reported previously. Those in uroauction at the r ern icxeverx i
signal strength indicators))
9. Stanch telephone oxchaar ;es
Lot 1. CCI Generator Cu, 405
Lot 2. Carrier generator GE. 502.
Lot 3. Carrier generator Ge. 503.
Lot 4. Modulator and amplifier o
L 5. Band pass for Me 3 and band pass for T?c' 4
Last 6. Level indicator Mu. 449,,
Lot 7. Level Indicator th. 602,
lot S. Calibrat n.. line Yb,. 705, (Was being built by ENKO).
Iot.9. Chassis Ki1.. 402,
30
Switchboard (Gluehla mpenschraenke (wall board)) 7 hey June target of 50 sets
could pot be attain d, "because of a shortage of flat relays (froi EAW Treptow) (3)
and binding strips (Rueckloetsicherungsstreifen) (from Arnsta it) W', The .Y Iy
target was set at 51 sets. The June target of 65 uprir~t switchboards could nrt
be attained, caxse of a short ge of plugs, binding strips, ran toggle s4tches
(Z inkenstreifen) (from f3lankenburg) (5). Only 45 of the latter sees could be
completed. Production statistics tt the end of June were as foiloV, a*
1" 7 r% I All
Sanitized Copy Approved for Release 2011/06/01 : CIA-RDP82-00457R009300280003-3
Sanitized Copy Approved for Release 2011/06/01: CIA-RDP82-00457R009300280003-3
a. Wall ban.rd
(Wandschrank)
100
100
b. Upright board
(standachrank)
2(~b
100
90
OFFICIALS ONLY
S
.
iRMATION
t $MLIGENCE AGENCY
OEM-
-4-
d
b 3~ .
ubaem
A c tu a l
Planne
Assembly
to tiu?nber
to lluhber
100
100
100
lik0
30
100
100
100
100
100'
100
100
90
.,
60
90
Assembly to Testshbp to
Test shop Sales
Pont
:~bn
'big
as_tal
7110
46
-
59
40
-
49
-
50X1-HUM
4
93
5
93
32
100
40
102
50X1-HUM
'?
-
-
10, Cabinets for Wieeaut AGs The four cabinets made for Wismut AG more refused by
the o .eetoaor. Another 8 cabinets were ordered, so that 12 modified cabinets
would have t be delivered. An order for some cabinets was expected from a Soviet
militrry unit.
U. Conpon.ents for te1ecications equipment
"M.ttt".eres R}mdrelais (sic) according to drawing 4722% The June target of
23,56t was not attained; only 11,700 were completed during the month; The
accu=t?r ting backlog required the completion of 42,000 by the end of July,
and o.`" (1' 000 altogether by the end of August F, Expansion of capacity was
dos lble because of the shortage of skilled labor and the increased output
would have to be attained by improvements in organization, The delivery target
for J*,tly was not at 19,230.
12: Special accessories for electrical caenmutaications
equipment and measuring instruments
Relay rails for the M .8.x The June target of 170 sets could not be attained,
because Bnutzen (6) comrlained about the switch plates. and therefore 200 rails
The J 0,y target was set at 160, sets 4 50 repairs 4 80 of "Stage U"- Fr ue on X1-HUM
statistics at the end of June were as follows?
Planned Planned Assembly to Testehop to
13.
S
l
es
a
Test Shop
l Assembl
A
t
bl
y
ua
c
y
Subassem
~,uantit to Number m to Month Total Month Total
1360 1360 95 1360 105 1295 80 1199
300 300 100 80 - -a ??
50X1-HUM
a. Post office repair programs The June target of 500 was not attained. The
Abteilung (section) Plagwitz (formerly Stoecker & Co,) X The following Pro--
July target was also set at 500.E
Small testing boxest It was proposed that production begin in Augusts
although final specifications had not yet been received. Eighty had been
ordered, some of 24 volt and the remaining of 60 volt. It was hoped to
manufacture 20 in August.
duetion has been planned for the third quarters
5,000 box alarm (tosenwecker)
15,000 microphone ca.
1?500 door openers.
y/ " U-s. OFTTCTMJ CI MY
Sanitized Copy Approved for Release 2011/06/01: CIA-RDP82-00457R009300280003-3
Sanitized Copy Approved for Release 2011/06/01: CIA-RDP82-00457R009300280003-3
OFFICIALS ONLY
TION
? tqf the large exhort den-and for measuring instruments,
aatory should manufacture 150 RIC measures bridges,:
3 provide the constructional details. Howevbr. the
o rescind this decision and to allocate the whole
i to Erfurt (5)# since that would be more economical
~,. L p# x!.*- it ~. }e,m> f4otories.
The June pros r &ot are was exceeded to 1.13.5%. The production planned for
July vas a _.._
$"t A! ._ ntsY vvi~ vv2500 t' (Personnel difficulties had arisen.
Also diffi ties in completing the Hungarian order fore 40 0
4n mmntaL
. 6 0 0 ze sic o ore were ac y ano are were p
difficulties in the assembly department
400 "34iltizet" (sic) new-(Housings were lacking)
25 Table Instruments K1.0.5
35 " " K1.1.
80 Portable wattmeters. (The modified system holier vere expected to be
ready in the near futures and a test series of 100 would be made by
1 August.)
20 Circular wattmeters.
30 10-taro instruments.
200 Srwill oh m eters.
70 Optical galvanorieters a
10 Optical instruments.
30 Precision Wheatstone bridges. (Ciemnitz was to take over gradually
the production from Scheibenberg? (5) which would be fully occupied
with "Thermofedersaetze"(sic)
15 Circular o,eters.
15 Table obamaters.
15 Precision wattmeters. (Prototype ready,, Dlftic .ties in assembly:,
A decision about the practicability of these instruments was to be
m de as soon as possible.)
50 Buzzers.
AM Vibrator pcr.mr units for Arnatalt. (722 and 600 had been returned
'nd thu l iborrtory xrn s to see tr u^ t c?ul,l be (:tone ;r' th them` as coon
eft, r,riic~ti.h'tee }
400 Vibrator power units for oLerr~-su:oY
50 Earphones for Wheatstone bridges.
400 Double earphones? Wismut model.
2000 "Thornofedersaetze" (sic) in Chemnitz.
3000 "Ther!rofedersaetze" (sic) in Scheibenberg. (5)
500 Polarized relays. (The factory had sent 10 kg of Mu-metal to Bautzen,
for the manufacture of 200 cores).
4000 Motorcar regulators. (1500 induction coils not available),.
1400. Motorcycle regu11tors. (About 50,000 D14 less than in previous month).
1500 Tachcmxiters (Z ehlwerke),. (Number drums not available. Rhs3nmet 11
wanted an increase In production of 40' 1 next year, and the'
he factory
agreed to that.
300 Single-pole switches. (Drawings were not ready, but the planned
titre could probably be mega
300 Double-pole sW tclies.
Teleprinters. (Tools for upper and lower carrieges9 as well as the
typs.-raising device (T,,penhebelkorb) were, reported ready, and individual
parts were in the subassembly. The works director asked everyone
to :mkf' a special. effort to prove that the factory Mull fultiL its
000tract on times, in spite of the difficulties which Werk HF (5) had
met.)
Pico miniature,railway ic).,
C
Sanitized Copy Approved for Release 2011/06/01: CIA-RDP82-00457R009300280003-3
Sanitized Copy Approved for Release 2011/06/01: CIA-RDP82-00457R009300280003-3
t oS4OFFTCIMS ON U
ECURITY ION
L INTELLIGENCE AGENCY
w 6 r
Comment: Probably Srezializlaswerk Ein.heit. Weisswassera Ober--Lausitz.
Ca?ents Possibly filament wired JVnI -nUIVI
Possibly Elektro Appnratewerke (AEG Treptow)g Berlin-Treptawp
3-?44 50X1-HUM
Possibly VEB Glllhlampenwerk (VVB RFT), Stadtilmeratrasse
39s Arse - a `oar VEB Fernmeldewerk (VV~3 Rkfi }
50X1-HUM
Count: Not, further identified,
Comment: Probably VEB Fernmelddwerk Bautzen (VVB RFT)
* As received,
Sanitized Copy Approved for Release 2011/06/01: CIA-RDP82-00457R009300280003-3