NEPTUNWERFT, ROSTOCK
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R009400590003-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 19, 2016
Document Release Date:
February 23, 2006
Sequence Number:
3
Case Number:
Publication Date:
November 21, 1951
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 123.49 KB |
Body:
Approved For Release 2006/03/W: 11 t0457ROO9400590003-5
~). ..J' ~rl/'~?.'ai 1.~il..eiJ v.ti)m V4 -'~'J.,'..-a~I.J.1 ~r111.J.I.
CLASSIFICATION
T( 1:f'(' ' t ' ' 1 k"
CENTRAL INTELLIGENCE AGENCY 25X1 REPORT
INFORMATION RE-PORT CD NO.
COUNTRY Der lany (Russian Zone)
SUBJECT :leptuncrft, 7botock
25X1
PLACE
ACQUIRED
DATE OF
INFO.
TBIO DOCp6171VT CG87AIWO I Ia C ATIOq APFSCYIWe TA6 [1AUONAL DOPEI88
O! TOO 0OtTOD OPAT0O VMtR17! 019A0IOO 07 ilia 89P1ONAO0 ACT 50
IL 0.0.. * ADD $5. AO AO00DOD. 170 70AN0II1UI02I OR TI10 !IEVTLATIOD
OP ITO 000TCO70 IN AM 0011070 TO AS 01IADTHOWZ0I PONS 18 P8C-
0101100 OT LAC. 05007011071011 OV "IS 9087 18 0 001111TRD.
DO NOT CIPCUL
25X1
DATE D1STR.
NO. OF PAGES
OF ENCLS.
TED BELOW)
SUPPLEMENT TO
REPORT NO.
21 1lov0 1.9;1
THIS IS UNEVALUATED INFORMATION
1a Progro for 1951
65 1~IIerin}sloF E~er1f_
ad Construction of
.fit?i the dclivexy of 15 lvg;:ers from the Vo'!kswerg't at: alsund this tari:;et
win 1m reached in Dove: 'tiro This is cont3 n; ;?ent, hornvcr, on the doi.%vcry
of rolled steel, of which there is a serious chorta/:e a
b0 Allocation for
TotiJ. of 12,000,0 TV.
The present situation for ship repairs
dockyard is as f ollocrs
Tym
3;LUG Frcight vessel
(1,9000 tow)
S }Ui."Lii 011 H rei .hit vessel
(1,000 tons)
? Cab? e-ship
(30-L.0 ;:t. long)
:inesi elaer (no
nomc) 30 71. long:.
IrJ~1 `-s'i1nn;, vo^sol
(1,000 toms)
).3't) 'ii~oceoper
)::-~acxrian
CLASSIFICATION
and construction ' - in the
Co: -)lotion
Earliest 6/1.1/51.
.arl ie st 6/11/51
i:arl.lest 0/9/51
9C conpic tod by the
and of year.
Completed 30/0/51
05 core lctoci by
31/12/51
15/10/51
1/10/51.
Approved For Release 2006/03/18 : CIA
O0457R00940 ?5900
Approved For Release 200/03/18 : CIA-RDP82-00457R009400590003-5
SBCR T/CONTROL -- U.S. G 'FIGLALS ONIX
CENTRAL INTELLIGEt OE A iENCY
c. Shipb'4ldi ng
Two keels are to be laid this year for two 2,000 BRT freight ships.
The original program called for the keels to be laid in August. The
date is now undetermined as the two waje on which the keels were to be
laid, are still under construction and will not be completed until
Septe:'ber or October.
2. Sub plies
?tollcd steel for ship construction and repairs must be of special quality
Schifrba ualitlft - GUte St. 42), A small quantity of this steel comes
but the majority from the East Zone, Only in very special
cases is steel from the USSR imported,., and this is usually in the form of
steel tubes. Most of the machinery and materials for 1*g,:er construction
comes from SAC or VEB factories in the Russian Zone. Most electrical equip-
ment comes from the VEM and one of the biggest problems at the moment is the
supply of coapassesa which at present come from the Askania works in Berlin.
The Askania compasses are very poor and considered useless so other sources
of supply are being sought
SECT/CONTROL - U.S. OFFICIALS OTUZ