RAILROADS: ELECTRIFICATION PLANS, MISCELLANEOUS INFORMATION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R009500560005-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
March 15, 2011
Sequence Number: 
5
Case Number: 
Publication Date: 
January 7, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R009500560005-5.pdf180.34 KB
Body: 
1 1 .J -V 1 1' 1101 1'IV 171111 1 1 : 1 Sanitized Copy Approved for Release 2011/03/15: CIA-RDP82-00457R009500560005-5 F!F&H nanhA9ra 50X1-HUM COUNTRY Gernany (Thussian .None) WE DISTR. 7 JANr ' I SUBJECT- r oilroads: Electrification Plans, PLACE ACQUIRED 1 } - 1 rPl~ NCO (LISTED O BELOW) 50X1-HUM SUPPLEMENT TO AND P94. OF THE U. S. CDDN. 5 ANRNOED. ITS TRANStlISSCON OR RRVEL? ATION OP ITSCOHTENTS TOO:Vyl RECEIPT OT AN UNAUTHORIZED PERSON REPORT NO. THIS IS UNEVALUATED INFORMATION Iflacellaneous Information Berlin electrification plans. plans to clear the entire Berlin area o a s eaTn 50X1 -HUM Kra eras ohm pot project s The employyee,gained the impression that the schem plan exist.. 11 have reached the stage of initial techr4cal discussions, but so far no written e i ' electrifiod with DC and the SBahn is to be stopped up from Coo v to 1,600 v m motore rorl.ing in sequence to carry the load. Plans for this project locomotive ::traffic by about 1961. The. Berlin "ring" is to be completely 'Capacity of Reiehsbahn-ot ed power stations. The Cher.nitz power station is equipped pith the following installations; 1 stean turbine (SSW) of 2,000 kw 1 steam , turbine (Borsig) of 1,150 kw .:r 1 steam turbine (AEG) of 500 kw 1 steam turbine (B13C) of 500 Ica Total 4s 45 0 kvt Tho.Leipzig power station has a total installed capacity of 10,000 k . The Chemnitz and. Leipzig power stations are. at present the only ones operated under the control of the railroad in the DDRL Re-electrification of the Uitteldcutschland #.rea, a. In April 1951 detailed plans were prepared at the BJGD (Directorate General of the :teichsbabn), Berlin, for the re-electrification of the old electric railroad net which had formerly existed in the Latteldeutsch- land axi.a (chief3y Saxony-Anhalt), but vhich had been completely die-- mantled by the Russians in 19ta5- 460 Sk,CRET/C0INTiOL - U.S. OFFIGLk S ONLY Sanitized Copy Approved for Release 2011/03/15: CIA-RDP82-00457R009500560005-5 Sanitized Copy Approved for Release 2011/03/15: CIA-RDP82-00457R009500560005-5 SECRET/CONTROL - U.S. OFFICIIU ,- ONLY CENTRAL INTELLIGENCE AGENCY _2 b? The lines included in this project were Leipzig - Halle/Saale, Halle/Saale - Magdeburg, Magdeburg - Dessau, Dessau - Bitterfeld, and Bitterfeld - Leipzig. c., The total cost estimated for this plan amounted to DII (East) 220 million. d,., The following supplies were estimated to be required to carx r out this plan: 1,000 t, copper, Co locomotives, 12,000 t. steel for masts (grade: ST 52), and the re-.equi nt of the Ltuldenstein (E2/ 15) power station. This plant was stated by the Russians to be in storage in the USSR, and its return for this purpose was offered by them. e,, It was estimated that the execution of this project would effect an annual saving of 500,000 t, of brawn coal briquettes (i,e., approxxmately 2 million t. of raw lignite). IPan of special equipment to Soviet Orbit countries. In mid-June 195li two 100-t. Culeme er road vehicles (for ca .nc rail trucks by road) were delivered to Albania on direct instructions of the SKK. Albanian didvers visited the DDR to be trained to drive these vehicles. The RBGD has been promised that the two vehicles will be returned after one year. Coal reserves. The total RBGD coal reserves on 1 August 1951 amounted to 1240,000 to of all t;rpes,, The SKK ordered the RBGD in mid-July 1c>951 to limit such reserves. at a: -l depots and stations to the amount normally recpsired by them for five da ays. 6. L:.ne alterations. ?ork is at, present under way to re-lay the secrnd track on the line from Saalfeld to Untercvellenborn, a distance of 6 kin. 7. E_'.ectric locomotive construction. Lokorotivbau Elektrotechniache Werke (VVB VIII) Ilennifsdorf has been engaged in producing plans for a 3,000-v DC electric locomotive since early 1951. The fiBGD has ordered 2C of these, the first one to Uc completed in sprang 1952 and the last one in 1955. Construction plans acre finished and approved in July 1951. SECRET/CONTROL - U.S. OFFICIALS ONIZ Sanitized Copy Approved for Release 2011/03/15: CIA-RDP82-00457R009500560005-5