NAVAL CONSTRUCTION ENTERPRISE OF RIJEKA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R009600430012-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 19, 2016
Document Release Date: 
August 16, 2006
Sequence Number: 
12
Case Number: 
Publication Date: 
December 15, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R009600430012-0.pdf296.23 KB
Body: 
In'TOLILONA 16 Approved For Release 10API#Q,*AALCIA-RDP82-00457R009600430012-O( ' CLASSIFICATION y W- JC01TTROL-U. 7. OFFICIALS OTTLY r?T; rc Tmv r~,Tr, I-sr m n,r 25X1 CENTRALI N LL'FGENCAG'C1 REPORT INFORMATION REPORT CD NO. COUNTRY Yugoslavia SUBJECT Naval Construction Enterprise of Rijeka PLACE 7" ACQUIRED I_,T A D OF (INFO CIRCULATE THIS DOCUGIENT CONTAINS IRFOR&IAYIOO# AFFECTING THE RATIORALDEFENSIi OF THE U141TED STATES. NIT01I1 THE URANINO OF TITLE 10. SECTIONS 703 AND 794. OF THE U. S. CODE. AS AMENDED. ITS TRANSMISSION OR REVEL' AYIOII OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS PROHIBITED BY LAI7 THE REPRODUCTION OF THIS FORK 13 PROHIBITED. 25X1 25X1 25X1 a. Steam-driven floating dry dock DIVNA equipped with hoisting equipment with a capacity of 60 tons; b. Steam-driven floating dry dock DUBA, which was built in Split, and which is equipped with hoisting equipment up to 15 tons capacity; c. Floating dry dock DRAGONA with hoisting equipment up to 15 tons capacity; d. Floating dry dock, unidentified, with hoisting equipment up to 15 tons capacity; Thee old trucks employed to transport material; CDNFIBENTIAL SUPPLEMENT TO REPORT NO., THIS IS UNEVALUATED INFORMATION 1. The Naval Construction Enterprise of Rijeka is a branch of the slain Directorate for Construction Enterprises which has headquarters in Split. Other branches are located at Sibenik, Kardeljevo and Bar. The Rijeka branch of the Naval Construction Enterprises is in charge of the construction and repairs to ports of the North Adriatic Sector which stretches from Koper to the south of Senj. 2l, The offices of the Enterprise at Rijeka are located on the sixth floor of a skyscraper facing the square formerly known as the Regina Elena Square. The director is Josip Krararic who is a pro Tito Communist, Engineer Antun Sirca is in charge of plans. He is approximately 45 years of age. Engineers in a supervisory capacity over the work performed in the various shipyards of the Rijeka branch are Engineer Plasibat and Engineer Cimicic. Plasibat, who is 45 years of age, was a contractor during the Royal Yugoslav Regime. He is considered to be skillful and practical, but is regarded by the Communists as being a person of bourgeois sentiments. The headquarters employs approximately 20 clerks, from 250 to 300 workers and 23 divers. The workers and divers are assigned to the various shipyards as the need wises. 3. The various vessels and equipment owned by the Naval Construction Enterprise at Rijka are forwarded as the need arises to the various areas which are under the jurisdiction of the other branches. The vessels are listed as follows: ~h'lY CLASSIFICATION ~ AIRS ~ FBI~B~ 49 DATE DISTR 15 Dec 1951 NO. OF PAGES 6 ft" NO.OF ENCLS. lSTED BELOV 1W I Ma 01kanao In CIasS. ri Drsu.ent Me. _______________ SW@~nTCONTROLe-U . S DISTRIBUTION I(; b_ By 25X1 Approved For Release 2006/09/25 : CIA-RDP82-00457R009600430012-0 COLU.S, OFFICIALS ONLY Approved F ease 2006/O1TR09/2.:5 :CIA-RDP82-004578009600430012-0 CENTRAL INTELLIGENCE AGENCY 25X1 ho Four floating docks furnished with winch and crane. Among theses the CREVICA is currently undergoing repairs at the Viktor Lenac shipyard, The BTJKEI is a simple dry dock equipped with a United States winch and crane, similar to the highway model on tract. The remaining two docks were constructed in the Third of May shipyard at Rijeka; Motorboats SLOBODA and ,MICE 3, based at Susak; fo Towboats TALAS and TREAT based at Rijeka;- 25X1 i0 Large size dredge boat BIOKOVO which was built and 25X1 delivered to Yugoslavia in 1950; and Diving equipment which is quite obsolete and poorly suited to the duties performed. The rubber diving suits In particular are in such a state that divers emerge from..the.water drenched. The vessel ZAGREB now at the petroleum port at Ri eke w recently said to have uploaded two Pirelli diving outfits 4o Mork projects handled by. the Rijeka E terprise are currently being carried out in the port of Baros at Susak, the Sveti Marko pier and the Wine Depot quay in the main port of Rijeka, the petroleum port in Rijeka, Vsimauin hi in Labin, Izola, Baker and Senj. The various work projects are described as follows: P ort_Baloe at Susak: Repairs are being made to the pier located outside the city, and formerly known as the King Aleksandar Pier, It will be enlarged by nine meters so that an additional set of railroad tracks can be laid, Engineer Ciinicic is in charge of the work for which fifty workers and nine divers are employed. Equipment being used consists of two dredge boats with cranes and three floating dry docks, among which the DIVt1A, the DDBA and a third unidentified dry. dock. The legend to the attached sketch I'^Is as follows: .) Existing'pier, partially damaged in section indicated under D. This damaged section covers an area of approximately thirty meters; (R.) Formerly a reef, which has now been leveled. with solid concrete blocks; (T)`Hollow concrete blocks forming a "carpets which is 50 centimeters thick, The concrete floor or carpet is located at a-depth of four meters; ( )Section of pier w!-ich has not been repaired; and (0) Sma3l reconstructed piers,. b? Sgtj. iar__ k Fie : Repairs are being -nade to the pier and to the adjacent quay, Engineer Plasibat is in charge of the work for which ten workers and two divers are employed. The equipment used consists of one cement machine and two dredge boats with orand, co, =2 2"I +.hMav: This area covers a group of projects for which 16,0009000 dinars were to have been appropriated. The work however, has been halted for lack of funds. To date only the rocks under the water have been re ed, PovcfdTROL.U,S, OFFICIALS ONLY Approved For Release 2006/09/25 : CIA-RDP82-00457R009600430012-0 Approved For R~ a see 2T006/09/255: CIA--R~~DP~8p22-000457R009600430012-0 CQ ~1COY9 ROLLS. tqi ICIALS CNN. CENTRAL INTELLIGr,NCE AGENCY s 3 r d. Petroleum Pont s Only one diver is currently employed on this project. His job is to place markers indicating the presence of rocks on the sea bed. The dredge boat EIOROVO, however, is expected soon, .and it will clear the entry into the port. This entry is at present only 15 meters wide, toward the center of the entry, because of various underwater obstacles such as rocks, at cetera. Two wooden cases (b on attached sketch II) mark the entry into the port. Vessels. entering to unload petroleum or for purposes of supplq.,enter badkwards and follow the route indicated on the attached sketch, allowing a safe distance of six motors from the port. Outside of the Petroleum Port, (indicated sketch II as A), a landing on an'embanlm-ent of wooden piles has been constructed. It is fifty meters long and eight meters wide. A small hand-operated crane is located at the very edge of this landing. The legend to the attached sketch II is as followss (.) Wooden landing or quay; (P- Cases marking entry to the port; (;c) Damaged section of pier. e. Va'i~aasirahi iti isabf~s A pier thirty meters long has been constructed which is used by the cement factory located in the vicinity. Engineer Tom 1.1ausic is in charge of the work-for which seven or eight workers and one diver are employed, IM: Repairs to the pier are currently in progress. g. his Repairs to the pier are currently in progress. h. His A new quay is currently being constructed opposite the old one. It will be 130 meters bng. Sea depth at that point, will be 13 meters. Another establishment in Bakar is entrusted with the construction of cement blocks to be used for this quay.' A certain Engineer Vehner is in charge of the construction of blocks, and has forty workers working for him. Repairs to the pier are currently in progress. The, chief engineer is Tons Muric, and 15 workers are employed to do the 'wort ;.' e Approveq `k lease 2006/09/25 : CIA-RDP82-00457R009600430012-0 cam10L.U.s. OFFICIALS ONI Approved For Rye" e?006/09/25 : CIA-RDP82-00457R009600430012-0 t T/CONTROI,.U.S. OFFICIALS mix CENTRAL INTELLIGENCE AGENCY M 4 640 Approved For Release 2006/09/25 : CIA-RDP82-00457R009600430012-0 ~~~rM4 /Pf11tTrM11T_TSt" C'BdWTIITAtQ I1TStq