PLANT NO 75 AT KHARKOV

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R010500230008-6
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
7
Document Creation Date: 
December 19, 2016
Document Release Date: 
February 28, 2006
Sequence Number: 
8
Case Number: 
Publication Date: 
February 13, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R010500230008-6.pdf456.91 KB
Body: 
Approved For Release 2006/03/18 : CIA-RDP82-00457RO10500230008-6 4CO COUNTRY USSR(Ukrainian SSR) rCURITT INIORr2ATION CENTRAL INTELLIGENCE AGENCY REPORT NO. INFORMATION REPORT 25X1 SUBJECT CLASSIFICATION CONFID NTIAL/CWTROL-US O FICIALS ONLY CD NO. DATE DISTR. 13 February 1952 NO.OF PAGES 3 . THIS IS UNEVALUATED INFORMATION 1., Plant is located in the southeastern part of Kharkov (50o00'Id/3 l5'E), east of the Balashov railroad station and just south of the highway to Chuguyevo (48012'V/360481B), (1) 20 Part of the plant was destroyed during the war. Reconstruction w,as still going on in 1947 and production was resumed as soon as the parts were restored. Originally, only locomotives were produced in the plant but after Soviet reoccupation tanks were also produced during the period of observation, 3v The plant comprised a forge, a foundry, several latheshops, an assembly department, a pattern-making shop, a power station, an instrument department, a punching shop, an annealing shop and :several anciilarYj installations, An automobile repair shop was attached to the plant. 3."otor vehicles from outside were also repaired in this shop. The small accessory plant 25X1 THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFT R E OF THE UNITED STATES, WITHIN THE MEANING OF TITLE 18, SECTIONS 799 AND 1". OF THE U. S. CODE. AS AMENDED, ITS TRANSMISSION OR REVEL' ATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS PROHIBITEDB7 LAW INS REPRODUCTION OP THIS FORM IS PROHIBITED. 4E. The plant produced four-axle, shunting locomotives with two Diesel engines, one in front and one in the rear; long-distance, eight.-axle, Diesel locomotives, which were allegedly A erica3n- licensed, and also tanks, T-34 and T-43 tanks were observed, In addition to this production, repairs were also made. The daily volume of repairs and new construction amounted to eight tanks e ai red with about 60 lathes, producing sr"mall ports for plant was allegedly about 100 meters south of the plant. (2) T- tt ' ~ Y~ial}a~ 7 During the period of observation, 5,000 to 6,000 employees worked per shift. `fork was done in three shifts.,. .