TETS III POWER PLANT AT KIEV

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R010500290009-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 15, 2016
Document Release Date: 
June 10, 2003
Sequence Number: 
9
Case Number: 
Publication Date: 
February 14, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R010500290009-9.pdf167.62 KB
Body: 
'25X1 Location: About 500 meters east of the main station of Kiev (30032'F/50o27'N), Ukrainian SSR, northeast of the double-track railroad line. 2. Plant installations: Having been destroyed during the war, the plant w:s reconstructed and resumed operation with two soviet turbines. The fourth boiler was fitted during the time of observation. The plant was fueled by coal until early 1949, t1pen was fonverted and fueled by natural gas piped from the Lvov area. A railroad connection available. For plant layout see Annex. 3. Work force: Four :hundred civilians and a hundred P'Ns. 4. Capacity: 1~o details available. morn COUNTRY USSR(Ukrainian SSR) SUBJECT Tets III Power Plant at Kiev 25X1 PLACE ACQUIRED DATE OF INFO. T03 DOCUMENT C3NtA(NS I06ki ATION Aft fTP/C't1 WATIONAL DEFENSE A>: THE UN(TEU STATES. WITHIN THE MEANING o TYT~? Ia cEf4inus ieo' 25X1 25X1 Comment: plant layout, this report agrees with previous informa- ant, east of the Kiev gain Station. Additional red to obtain a clear picture of the actual plant nd type of construction of the plant buildings. DATE DISTR. 14 February 1952 NO. OF PAGES 1 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO. 25X1 ILLEGIB 25X1 Approved FqJ p 1 '? /08/06 :CIA-RDP82-00457R01 CENWAL DM LI NCE AGENCY Le end to Annex: 25X1. 1 Main gate 2 Gate for motrt- vehicles 3 Guardhouse 4 Administration 5 Boiler and tutbine IBbuse, stone structure, 100 x 50 x.40 meters, with four smokestack, --and a fifth smokestack planned. The bibiler house has four Americ A,tRgsone German boiler; a fifth boiler was planned. Soviets stated that the two turbines cane from Leningrad. 6 Coal conveying installation 7 1''itting shops 8 Vdelding shop q Three-story building with technical administration . 10 -Electric storage 11 Roofed section with winches where the coal is loaded into baskets and transported by cable car to the boilers or the col dump. 12 Coal dump 13 Oil pumping plant 14 Carpenter shop 15 Cooling plant, gas tank shaped, 60 meters high 16 Watchtowers. 25X1 Approved For Release 2003/08/06 : CIA-RDP82-00457RO10500290009-9 Approved For eleaseO2003 08 06 - - -