TETS III POWER PLANT AT KIEV
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R010500290009-9
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
3
Document Creation Date:
December 15, 2016
Document Release Date:
June 10, 2003
Sequence Number:
9
Case Number:
Publication Date:
February 14, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 167.62 KB |
Body:
'25X1
Location:
About 500 meters east of the main station of Kiev (30032'F/50o27'N),
Ukrainian SSR, northeast of the double-track railroad line.
2. Plant installations:
Having been destroyed during the war, the plant w:s reconstructed and
resumed operation with two soviet turbines. The fourth boiler was fitted
during the time of observation. The plant was fueled by coal until early
1949, t1pen was fonverted and fueled by natural gas piped from the Lvov
area. A railroad connection available. For plant layout see Annex.
3. Work force:
Four :hundred civilians and a hundred P'Ns.
4. Capacity:
1~o details available.
morn
COUNTRY USSR(Ukrainian SSR)
SUBJECT Tets III Power Plant at Kiev
25X1
PLACE
ACQUIRED
DATE OF
INFO.
T03 DOCUMENT C3NtA(NS I06ki ATION Aft fTP/C't1 WATIONAL DEFENSE
A>: THE UN(TEU STATES. WITHIN THE MEANING o TYT~? Ia cEf4inus ieo'
25X1
25X1
Comment:
plant layout, this report agrees with previous informa-
ant, east of the Kiev gain Station. Additional
red to obtain a clear picture of the actual plant
nd type of construction of the plant buildings.
DATE DISTR.
14 February 1952
NO. OF PAGES 1
NO. OF ENCLS.
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
25X1
ILLEGIB
25X1
Approved FqJ p 1 '? /08/06 :CIA-RDP82-00457R01
CENWAL DM LI NCE AGENCY
Le end to Annex:
25X1.
1 Main gate
2 Gate for motrt- vehicles
3 Guardhouse
4 Administration
5 Boiler and tutbine IBbuse, stone structure, 100 x 50 x.40 meters, with
four smokestack, --and a fifth smokestack planned. The bibiler house
has four Americ A,tRgsone German boiler; a fifth boiler was planned.
Soviets stated that the two turbines cane from Leningrad.
6 Coal conveying installation
7 1''itting shops
8 Vdelding shop
q Three-story building with technical administration
.
10 -Electric storage
11 Roofed section with winches where the coal is loaded into baskets
and transported by cable car to the boilers or the col dump.
12 Coal dump
13 Oil pumping plant
14 Carpenter shop
15 Cooling plant, gas tank shaped, 60 meters high
16 Watchtowers.