POWER PLANT AT KRASNI LUCH
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R010600090011-7
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
7
Document Creation Date:
December 14, 2016
Document Release Date:
July 8, 2002
Sequence Number:
11
Case Number:
Publication Date:
February 18, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 373.45 KB |
Body:
1p'~~ - ~ZL004Q~D00090'f~
Approved Forl efelmsm
CENTRAL INTELLIGENCE AGENCY REPORT NO.
INFORMATION REPORT CD NO.
25X1A
COUNTRY USSR(Ukrainian SSR)
SUBJECT Power Plant at Krasni Luch
25X1 C
DATE DISTR. 18 February 1952
NO. OF PAGES 2
NO. OF ENCLS. 2
(LISTED BELOW)
25X1X
25X1A
SUPPLEMENT TO
REPORT NO.
1. Location :
.bout 6 km southwest of Krasni Luch (38?56'E/ 48?03'N)7
Ukrainian SSR, northeast of the reservoir of the Pius
River.
2. Plant inqtAjjat-ions
Soviets said that the plant, an old installation constructed
in 1936, was partially dismantled and then blasted when
German troops approached in VJorl{l 'f'ar II. Its reconstruc-
tion started in 1945 and enlargements were still under way
at the time of observation. For plant layout see Annex 1.
For sketch of the boiler and turbine house see Annex 2.
Three turbines are in operation. .A railroad connection is
available.
tion work; on
b. Three shif
the plant .
w?rh force
a. Your hundre including 120 PWs doing construc-
4. Oap,actty_:
Rvith 200 civilian laborers, operating
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7
CONFIDENTIA L/CONTROL/US OFFICIALS ONLY
2
NTRAL INTFLLIGINCE AG'aNCY
power to the entire Krasni Luch area (according to a
soviet construction foreman).
a. `.Ch
Plant
near Krasni Luch has been
repea
e
plant
location in the information
is a
.
The
plant is exactly 5 km south-
west o? t railroad str$tion, in an angle
formed by the small reservoir of the Mius River.
b. The report is of special value because:
(1) A comparison tith available records on the plant shows
that the best reproduction of the plant layout to dates is
forwarded as Annex 1 of this report.
(2) Essential postwar enlargements of the plant mentioned
by a rrevious source *, are confirmed. The enlargements of
the boiler and turbine house, northeast of the old building,
and the construction of a new and still larger building
seems to be correct. This new construction was mentioned
in a previous report to have passed the phase of surveying
work. The intended installation of 16 boilers in this new
building is doubted. It is assumed that
of both boilers and turbines is coi
building will be an independent poi
dimensions. The plant capacity wou
creased by the operation of this nr
ever, needs clarification.
(3) A previous report *, mentioned .only the number of boi-
lers but not the turbines. The, statements of the present
report and the details recorded in Annex 2 are presumably
correct.
(4) It is believed to be a fact that the watet from the re-
servoir is supplied to the plant via underground installa-
tions as is also indicated by the omission of above-ground
installations on the attached sketch. Previous different
information seems to be in error.
6..'The direction of the river has to be turned 10"0 degrees
on the previous report *. The river' is nct a tributary oi*
the Tviius Eiver. 'ht /the Mius itaelf.
d. Lxcept for t -n west constructions, the target data on
the= }chant a sufficidntly clarified.
2 Annexes : Power Plant in Krasni Luch.
CONFIDENTIAL/CONTROL/US OFFFICIALS ONLY
Approved For Release 2002/08/08 : CIA-RDP
Document No.
Its-Change In Class.
Declassified
CI:rsa. Changed To: TS
4M457041 0$QQ11
Refs: - -- -- riili
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7
CONFIDNNTI.AL/CONTROL/US OFF-ICIALS ONLY
1
25X1A
25X1A
Boiler and turbine house with administration offices
and court yard. For details see Annex 2
2 Projected new boiler house with the area being sur-
veyed and the installation of 16 boilers intended
(Soviet statements )
3 Coal storage bunker
4 Coal conveyer lines
5 Repair forge
6 Stores with construction materiabs, brick building,
50 x 10 x 5 meters
7 Garage and repair shop
8 Apprentices workshop and dwellings for 50 apprentices
9 Three storage buildings with construction materials,
slag-concrete structures, 25 x 10 x 5 meters
10 Three storage buildings with electric instruments and
machine spare parts, slag-concrete structures, 25 x 10
x 5 meters
11 Barracks of 60 MVD guards
12 Cement stores, concrete buildin , 15 x u x 5 meters
13 Kitchen
14 echanical workshop, brick building 25 x 15 x 6 meters
15 Fitting shop, part: of No. 14, doin all repairs and
production of par-t-.s for reconstruction
lb Dispensary
17 Guard house
18 Main gate and guard house
19 Administration
CONFIDENTIAL/CONTROL/US OFFICIALS ONLY
25X1
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7
CONFIDENTIA L/CONTROL/US OFFICIALS ONLY
CENTRAL INTELLIGENCE AsENCy
25X1A
25X1A
20 Sewage canal
B Fire department, brick building 20 x 20 x 8 meters with
12-meter tower, equipped with three motor fire engines
C Concrete bridge, solidly constructed
D Water basin
E Dam, repaired in 1947/48, to keep the water basin clean
(statement of fellow PV1s assigned tc this work)
F Lock
G Quarry.
CONFIDEPNT .-AL/CONTROL/US OFFICIALS ONLY
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7
CONFIDEI"T I.AL/CONTROL/US OFFIC I.ALS ONLY
25X1A
Annerx
Lggend to Annex-2.
D
1 Five-story administration, 90 x 50 x 20 Dieters, occupied
since the Summer of 1949
d boiler house, 60 x 60 meters,
13 meters, steel structure with
b tical flue boilers for coal
dust Fueling, five coa mills, and five flat smokestacks,
one boiler in reserve
4 Turbine house, 64 x 40 x 20 meters, with three operating
turbines. Off limits to PWs. Source observed the interior
of the building through the entrance. A railroad track
leads into the turbine house
5 Turbine chamber under construction, 80 x 35 x 20 meters,
two completed foundations with turbines being fitted.
Construction of two additional foundations is planned
but the remains of the destroyed foundations must first
be removed. .A railroad connection
6 Builcting under construction since august 11-,49, excavations,
_sf) x 60 meters. Steel structures partially erected but no
basic walls. Foundations under construction 2 meters under-
ground and 3 meters aboveground, size 3 x 10 meters.
7 Court yard
3 Guarded entrance
9 Switching station, strictly guadded. Power transmission
lines lead from here to t?I=t various town sections
10 Tranformer station, ferro-concrete structure. 150 x 25 x
20 meters, with many tranformer chambers.
Ole l.,'II)EITTIAL/CO:i,,'TROL/US OFFTCT ALS ONLY
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7
Approved For Rel 2002/ 08 CIq RDP82-004578010600090011-7
CONENTUQL/CON'1RO.L US OFFICIALSONLY I
CENTRAL INTnLLIG':NCF AGENCY
Power Plant a Kral Lugh
CONFIDEN'T'IAL/CONTROL-US O a FICIAL: NLY
Annex I
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7
CONS DENT CO I US : OYF CIALS ONTJT
rNT'1LIGENCE AGENCY
CONFIDENTIAL/CONTROL-US OFFICIALS ONLY
Approved For Rea s 29 /08108;i,C RDP82-00457R010600090011-7
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7
25X1A