POWER PLANT AT KRASNI LUCH

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R010600090011-7
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
7
Document Creation Date: 
December 14, 2016
Document Release Date: 
July 8, 2002
Sequence Number: 
11
Case Number: 
Publication Date: 
February 18, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R010600090011-7.pdf373.45 KB
Body: 
1p'~~ - ~ZL004Q~D00090'f~ Approved Forl efelmsm CENTRAL INTELLIGENCE AGENCY REPORT NO. INFORMATION REPORT CD NO. 25X1A COUNTRY USSR(Ukrainian SSR) SUBJECT Power Plant at Krasni Luch 25X1 C DATE DISTR. 18 February 1952 NO. OF PAGES 2 NO. OF ENCLS. 2 (LISTED BELOW) 25X1X 25X1A SUPPLEMENT TO REPORT NO. 1. Location : .bout 6 km southwest of Krasni Luch (38?56'E/ 48?03'N)7 Ukrainian SSR, northeast of the reservoir of the Pius River. 2. Plant inqtAjjat-ions Soviets said that the plant, an old installation constructed in 1936, was partially dismantled and then blasted when German troops approached in VJorl{l 'f'ar II. Its reconstruc- tion started in 1945 and enlargements were still under way at the time of observation. For plant layout see Annex 1. For sketch of the boiler and turbine house see Annex 2. Three turbines are in operation. .A railroad connection is available. tion work; on b. Three shif the plant . w?rh force a. Your hundre including 120 PWs doing construc- 4. Oap,actty_: Rvith 200 civilian laborers, operating Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7 CONFIDENTIA L/CONTROL/US OFFICIALS ONLY 2 NTRAL INTFLLIGINCE AG'aNCY power to the entire Krasni Luch area (according to a soviet construction foreman). a. `.Ch Plant near Krasni Luch has been repea e plant location in the information is a . The plant is exactly 5 km south- west o? t railroad str$tion, in an angle formed by the small reservoir of the Mius River. b. The report is of special value because: (1) A comparison tith available records on the plant shows that the best reproduction of the plant layout to dates is forwarded as Annex 1 of this report. (2) Essential postwar enlargements of the plant mentioned by a rrevious source *, are confirmed. The enlargements of the boiler and turbine house, northeast of the old building, and the construction of a new and still larger building seems to be correct. This new construction was mentioned in a previous report to have passed the phase of surveying work. The intended installation of 16 boilers in this new building is doubted. It is assumed that of both boilers and turbines is coi building will be an independent poi dimensions. The plant capacity wou creased by the operation of this nr ever, needs clarification. (3) A previous report *, mentioned .only the number of boi- lers but not the turbines. The, statements of the present report and the details recorded in Annex 2 are presumably correct. (4) It is believed to be a fact that the watet from the re- servoir is supplied to the plant via underground installa- tions as is also indicated by the omission of above-ground installations on the attached sketch. Previous different information seems to be in error. 6..'The direction of the river has to be turned 10"0 degrees on the previous report *. The river' is nct a tributary oi* the Tviius Eiver. 'ht /the Mius itaelf. d. Lxcept for t -n west constructions, the target data on the= }chant a sufficidntly clarified. 2 Annexes : Power Plant in Krasni Luch. CONFIDENTIAL/CONTROL/US OFFFICIALS ONLY Approved For Release 2002/08/08 : CIA-RDP Document No. Its-Change In Class. Declassified CI:rsa. Changed To: TS 4M457041 0$QQ11 Refs: - -- -- riili 25X1A Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7 CONFIDNNTI.AL/CONTROL/US OFF-ICIALS ONLY 1 25X1A 25X1A Boiler and turbine house with administration offices and court yard. For details see Annex 2 2 Projected new boiler house with the area being sur- veyed and the installation of 16 boilers intended (Soviet statements ) 3 Coal storage bunker 4 Coal conveyer lines 5 Repair forge 6 Stores with construction materiabs, brick building, 50 x 10 x 5 meters 7 Garage and repair shop 8 Apprentices workshop and dwellings for 50 apprentices 9 Three storage buildings with construction materials, slag-concrete structures, 25 x 10 x 5 meters 10 Three storage buildings with electric instruments and machine spare parts, slag-concrete structures, 25 x 10 x 5 meters 11 Barracks of 60 MVD guards 12 Cement stores, concrete buildin , 15 x u x 5 meters 13 Kitchen 14 echanical workshop, brick building 25 x 15 x 6 meters 15 Fitting shop, part: of No. 14, doin all repairs and production of par-t-.s for reconstruction lb Dispensary 17 Guard house 18 Main gate and guard house 19 Administration CONFIDENTIAL/CONTROL/US OFFICIALS ONLY 25X1 Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7 Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7 CONFIDENTIA L/CONTROL/US OFFICIALS ONLY CENTRAL INTELLIGENCE AsENCy 25X1A 25X1A 20 Sewage canal B Fire department, brick building 20 x 20 x 8 meters with 12-meter tower, equipped with three motor fire engines C Concrete bridge, solidly constructed D Water basin E Dam, repaired in 1947/48, to keep the water basin clean (statement of fellow PV1s assigned tc this work) F Lock G Quarry. CONFIDEPNT .-AL/CONTROL/US OFFICIALS ONLY Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7 Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7 CONFIDEI"T I.AL/CONTROL/US OFFIC I.ALS ONLY 25X1A Annerx Lggend to Annex-2. D 1 Five-story administration, 90 x 50 x 20 Dieters, occupied since the Summer of 1949 d boiler house, 60 x 60 meters, 13 meters, steel structure with b tical flue boilers for coal dust Fueling, five coa mills, and five flat smokestacks, one boiler in reserve 4 Turbine house, 64 x 40 x 20 meters, with three operating turbines. Off limits to PWs. Source observed the interior of the building through the entrance. A railroad track leads into the turbine house 5 Turbine chamber under construction, 80 x 35 x 20 meters, two completed foundations with turbines being fitted. Construction of two additional foundations is planned but the remains of the destroyed foundations must first be removed. .A railroad connection 6 Builcting under construction since august 11-,49, excavations, _sf) x 60 meters. Steel structures partially erected but no basic walls. Foundations under construction 2 meters under- ground and 3 meters aboveground, size 3 x 10 meters. 7 Court yard 3 Guarded entrance 9 Switching station, strictly guadded. Power transmission lines lead from here to t?I=t various town sections 10 Tranformer station, ferro-concrete structure. 150 x 25 x 20 meters, with many tranformer chambers. Ole l.,'II)EITTIAL/CO:i,,'TROL/US OFFTCT ALS ONLY 25X1A Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7 Approved For Rel 2002/ 08 CIq RDP82-004578010600090011-7 CONENTUQL/CON'1RO.L US OFFICIALSONLY I CENTRAL INTnLLIG':NCF AGENCY Power Plant a Kral Lugh CONFIDEN'T'IAL/CONTROL-US O a FICIAL: NLY Annex I 25X1A Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7 CONS DENT CO I US : OYF CIALS ONTJT rNT'1LIGENCE AGENCY CONFIDENTIAL/CONTROL-US OFFICIALS ONLY Approved For Rea s 29 /08108;i,C RDP82-00457R010600090011-7 Approved For Release 2002/08/08 : CIA-RDP82-00457RO10600090011-7 25X1A