NEWLY ESTABLISHED FUEL DUMP IN RADENSLOBEN

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R010600190010-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
July 22, 2002
Sequence Number: 
10
Case Number: 
Publication Date: 
January 24, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R010600190010-7.pdf182.94 KB
Body: 
? CU\SclEICATION nArWinv ZnYlf-AN Approves:II-or Keiease ,,,,(1,30f1Ficii,,iy0P4q0457110-1-06001900_10-7 COUNT., f-----?,?T ?1?71.:::Zr.".....zavArrwanwauanr,x2e-a smt mamma e7r-eatada. aeyorsrzr :"?1, EPORT NO - ? 25N1 Newly Establishsd Foal Drmn in ilnOrAnrelrl-,nn I -i----- 5X1X EVALUATION__ 5X1C 1 DI ATE OF CONTENT 5X1C 15ATE OBTAINED 5X1A REFERENCES _DATE PREPARFD Te?orwi,ovrt r n e , PAGES. ENCLOSURES& REMARKS GCM.,102t 1 - sketch on ditto TYPE) xn.P. menmsawal..*.laniawAsa-sreamesae.rreageomm- 25X1 . Source learned on 10 November 1951 that 70 fuel containers were shipped from the Hadensloben railroad station to the wooeed area on Lake 'Metz on the newly established railroad spur track. The shipment was handled exclusvely by Soviet soldiers. Patches of woodland offering adequate space for the construction of underground concrete bunkers were being cleared by'Soviet soldiers, Lach of the bunkers wil3 accommodate four containers with a total capacity of 100 cubic motors The bunkers are topped by concrete cones with entrance doors. 2. A sketch of the Radensleben fuel dunp was obtained on 15 November 1951 from the manager of a construction firm which had contracted to build the fuel depot. iF According to the sane informant about 130 containers, each with a capacity of 24,000 liters were stored in groups of four in the wooded area south of the fuel dump. The roadbed of the railroad spur vas completed except for the last 50 motors. Fart of the rails required had already been shipped to the construction site. Tho project was done by the firm of Grund in otargard and supervised by a special construction bureau in lleuruppin. The over-all construction work vas supervised from Fuerstenborg. It was planned to build about 150 meters Crirdings for unloading operations in the area a: the dump, The completion dote ior the project was sot for 20 November 1251, but source believed it improbable that this date would be met0 fnel containers were still being unloaded at the aadonsleben railroad station. The site of the dump woo being guarded by about :12 soldiers under the command of a major. ** Source learned that the firm of Eichaelis had boon contracted for the construction of a similar fuel dunp near Neubrandenburg (11 66)? 25X1A * ** Oomnent. For sketch of the fuel dump, see Annex. Cothilear: The data on the new fuel dump in 'Iadonslebon appoar credible. 25X1A I , To date, no rail shipments have been observed arriving at the dump. Therefore it is believed that the installation has not yut boon completed. The report supports the previous assumption that the depot is going to have a storage capacity of approximately 3,000 cubic meters. For location of fuel containers, see item 14 of sketch. 25X1A '1141 Comment. The plan for the construction of a new fuel dump in the Neubrandene Durg area is reported for the first time. The information requires confimation. ? CONFIDENTIAL CLASSIFICATION filiWai6T4 25X1 Approved For Release 2002/10/30 : CIA-RDP82-00 Document No. No Change In Class. EJ El Declassified Class. Changed To: TS S (!) Auth.: HR 7C-2 Date: lia,P 1978 By: 107 25X 1 0%,A0 Approved For Releaf0602/10/30 : CIA-RDP82-00457R010600190010-7 SO, )11 !.13 ,ruol Dopot at 1.10.d.9nElkoko-4, 1-0 Aleuruppin 12 km Radensieben rail roe.c/ ssratier) ? 3a 31V ' 4 2 4 1 \ 5 Alt Fries 9 ack 8 116 \ 10 12 'er lef7end 2 ' Annex to aerrin sc:aie 25i ooe '1 Open shed, about 30 x 10 x 5 meters 2 and 37:hi-Akers extending 1.5 meters above ground, 26.7 x 81,5 meter the bunkers are provided with span?roofs and covered Trith earth I. Two dug?in containers with a capacity of 212?,000 liters each, e:eoending about 50 cm above ground 5 Two containers: same as item 14 .6 Laboratory, about L. x 6 x 3.5 Enters 7 are station? 10 x 10 x 5 meters 8 Dathrooms 9 Ve11 12 meters deep; water level at the 15 meter ?mark 10 Kitchen, 20 x 10 x meters U Headquarters building, 30 x.12 x ,14. meters 12 Low wooden building quartering 100 7.2J,?, sarE as item n 13 Entrance gate Fuel containers. Approved For Release 2002/10/30 : CIA-RDP82-00457R010600190010-7 25X1 25X1A 25X1